From 06/08/2022 to 07/07/2022

07/07/2022

05:26 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
05:26 PM 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS - Promotion Johanes Christian Kurni
05:26 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
visit BMS fernando sergio rumbayan
02:47 PM 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Mutation Fiona Avangeline Jonathan
11:59 AM 1.00 hour (Feature #1338 (Closed): ESS Mutation - Autofill field)
ESS Mutation - Autofill field M Azid Wahyudi
11:35 AM 1.00 hour (Bug #1339 (Closed): [ESS] - Promotion )
[ESS] - Promotion M Azid Wahyudi

07/05/2022

05:52 PM 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS - Staff Requisition Johanes Christian Kurni
05:52 PM 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS - Promotion Johanes Christian Kurni
05:47 PM 1.00 hour (Feature #1311 (Closed): ESS Exit Clearance - Show Deskripsi)
ESS Exit Clearance - Show Deskrips M Azid Wahyudi
05:35 PM 1.00 hour (Feature #1312 (Closed): ESS Mutation - Autofill field)
ESS Mutation - Autofill field M Azid Wahyudi
04:43 PM 1.00 hour (Bug #1333 (Closed): [ESS] - Mutation)
[ESS] - Mutation M Azid Wahyudi
04:42 PM 1.00 hour (Bug #1332 (Closed): [ESS] - Exit Clearance)
[ESS] - Exit Clearance M Azid Wahyudi
04:41 PM 1.00 hour (Bug #1331 (Closed): [ESS] - Promotion )
[ESS] - Promotion M Azid Wahyudi
03:57 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:57 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:57 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:56 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:55 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:55 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:54 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:49 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:49 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:49 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:48 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:48 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:47 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:47 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:46 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:45 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:44 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:44 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:43 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:43 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:43 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:43 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:43 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:42 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:42 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:42 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:40 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:40 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:30 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:29 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:29 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:28 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:15 PM 4.00 hours (Bug #1231 (Closed): [ Report ] - Performance Report Monitoring)
[ Report ] - Performance Report Monitoring M Azid Wahyudi
03:15 PM 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
UAT Script Fiona Avangeline Jonathan
03:14 PM 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Promotion Fiona Avangeline Jonathan

07/04/2022

06:31 PM 1.30 hour (Feature #1319 (Closed): [ESS] - Promotion - Autofill )
[ESS] - Promotion - Autofill M Azid Wahyudi
05:37 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS - Promotion Johanes Christian Kurni
11:51 AM 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Mutation Fiona Avangeline Jonathan
11:51 AM 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Exit Clearance Fiona Avangeline Jonathan
11:48 AM 5.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS - Staff Requisition Johanes Christian Kurni
11:47 AM 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS - Promotion Johanes Christian Kurni
11:45 AM 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS - Staff Requisition Johanes Christian Kurni
11:45 AM 7.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS - Promotion Johanes Christian Kurni
11:42 AM 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS - Staff Requisition Johanes Christian Kurni
11:42 AM 5.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS - Promotion Johanes Christian Kurni
11:37 AM 5.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS - Promotion Johanes Christian Kurni
11:30 AM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS - Promotion] Johanes Christian Kurni

07/01/2022

05:39 PM 1.00 hour (Bug #1307 (Closed): [ESS] - Promotion )
[ESS] - Promotion M Azid Wahyudi
05:38 PM 1.00 hour (Feature #1315 (Closed): [ESS - Promotion] - Autofill )
[ESS - Promotion] - Autofill M Azid Wahyudi
05:37 PM 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Exit Clearance Fiona Avangeline Jonathan
05:36 PM 1.00 hour (Feature #1313 (Closed): [ESS] - Promotion - Autofill )
[ESS] - Promotion - Autofill M Azid Wahyudi
05:35 PM 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Internal UAT ESS Fiona Avangeline Jonathan

06/30/2022

05:24 PM 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Travel Fiona Avangeline Jonathan
03:40 PM 4.00 hours (Bug #1296 (Closed): Training Management)
Fixing Instructor Evaluation Training Tri Rizqiaty
03:36 PM 1.00 hour (Bug #1299 (Closed): Job Catalog )
Fixing Proficiency Qual Di Job Catalog Tri Rizqiaty
03:35 PM 1.50 hour (Bug #1299 (Closed): Job Catalog )
Fixing Proficiency Qual Di Job Catalog Tri Rizqiaty
02:35 PM 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Mutation Fiona Avangeline Jonathan
01:54 PM 1.00 hour (Bug #1231 (Closed): [ Report ] - Performance Report Monitoring)
[ Report ] - Performance Report Monitoring M Azid Wahyudi
11:22 AM 1.30 hour (Bug #1210 (Closed): [ Report ] - Performace Report Individu)
[ Report ] - Performace Report Individu M Azid Wahyudi

06/29/2022

07:21 AM 1.00 hour (Bug #1231 (Closed): [ Report ] - Performance Report Monitoring)
[ Report ] - Performance Report Monitoring M Azid Wahyudi
07:16 AM 1.30 hour (Bug #1210 (Closed): [ Report ] - Performace Report Individu)
[ Report ] - Performace Report Individu M Azid Wahyudi
03:53 AM 1.00 hour (Feature #1283 (Closed): ESS Mutation - Autofill field)
ESS Mutation - Autofill field M Azid Wahyudi
03:44 AM 1.00 hour (Feature #1284 (Closed): ESS Exit Clearance - Autofill field)
ESS Exit Clearance - Autofill field M Azid Wahyudi

06/28/2022

05:53 PM 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Mutation Fiona Avangeline Jonathan

06/27/2022

05:33 PM 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Mutation Fiona Avangeline Jonathan
05:33 PM 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Exit Clearance Fiona Avangeline Jonathan
05:31 PM 1.00 hour (Feature #1275 (Closed): ESS Mutation - Autofill field)
ESS Mutation - Autofill field M Azid Wahyudi
02:54 PM 1.00 hour (Feature #1268 (Closed): ESS Promosi - Autofill)
ESS Promosi - Autofill M Azid Wahyudi
12:48 PM 1.00 hour (Bug #1269 (Closed): ESS Exit Clearance )
ESS Exit Clearance M Azid Wahyudi

06/24/2022

07:10 PM 1.00 hour (Bug #1251 (Closed): [ESS] - Staff Requisition )
[ESS] - Staff Requisition M Azid Wahyudi
07:03 PM 1.30 hour (Feature #1267 (Closed): ESS Exit Clearance, ESS Mutasi - Autofill )
ESS Exit Clearance, ESS Mutasi - Autofill M Azid Wahyudi
04:59 PM 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Staff Requisition Johanes Christian Kurni
04:58 PM 5.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Promotion Johanes Christian Kurni
04:58 PM 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Mutation Fiona Avangeline Jonathan
04:58 PM 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Exit Clearance Fiona Avangeline Jonathan
04:58 PM 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Travel Johanes Christian Kurni
03:55 PM 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Travel Fiona Avangeline Jonathan
02:15 PM 7.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Promotion Johanes Christian Kurni

06/23/2022

05:29 PM 2.00 hours (Bug #1251 (Closed): [ESS] - Staff Requisition )
[ESS] - Staff Requisition M Azid Wahyudi
05:27 PM 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
Report PMS Fiona Avangeline Jonathan
05:26 PM 5.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Fiona Avangeline Jonathan

06/22/2022

11:43 PM 2.00 hours (Bug #1231 (Closed): [ Report ] - Performance Report Monitoring)
[ Report ] - Performance Report Monitoring M Azid Wahyudi
05:52 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Promotion Johanes Christian Kurni
05:51 PM 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Travel Johanes Christian Kurni
05:50 PM 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Staff Requisition Johanes Christian Kurni
05:50 PM 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Promotion Johanes Christian Kurni
05:43 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Exit Clearance Fiona Avangeline Jonathan
04:20 PM 1.30 hour (Feature #1258 (Closed): ESS Mutation - Autofill field)
ESS Mutation - Autofill field M Azid Wahyudi

06/21/2022

05:16 PM 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Promotion Johanes Christian Kurni
05:15 PM 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Staff Requisition Johanes Christian Kurni
05:12 PM 7.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Staff Requisition Johanes Christian Kurni
03:10 AM 1.00 hour (Feature #1253 (Closed): ESS Mutation - Lookup Employee ID)
ESS Mutation - Lookup Employee ID M Azid Wahyudi

06/20/2022

05:19 PM 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Mutation Fiona Avangeline Jonathan

06/17/2022

05:12 PM 7.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Mutation Fiona Avangeline Jonathan
10:45 AM 1.30 hour (Feature #1250 (Closed): ESS Mutation)
ESS Mutation M Azid Wahyudi

06/16/2022

05:03 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Staff Requisition Johanes Christian Kurni
05:01 PM 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Exit Clearance Fiona Avangeline Jonathan
05:00 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Mutation Fiona Avangeline Jonathan
04:59 PM 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Staff Requisition Johanes Christian Kurni
03:42 PM 3.00 hours (Feature #1226 (Closed): ESS - Promotion)
ESS - Promotion M Azid Wahyudi

06/15/2022

10:15 PM 1.00 hour (Feature #1235 (Closed): ESS Mutation)
ESS Mutation M Azid Wahyudi
06:15 PM 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
Muhammad Bintar
02:43 PM 2.00 hours (Feature #1226 (Closed): ESS - Promotion)
ESS - Promotion M Azid Wahyudi

06/14/2022

05:10 PM 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Mutation Fiona Avangeline Jonathan
02:20 PM 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Exit Clearance Fiona Avangeline Jonathan
10:08 AM 2.00 hours (Bug #1210 (Closed): [ Report ] - Performace Report Individu)
[ Report ] - Performace Report Individu M Azid Wahyudi

06/13/2022

05:36 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Staff Requisition Johanes Christian Kurni
05:35 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Staff Requisition Johanes Christian Kurni
05:34 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Staff Requisition Johanes Christian Kurni
05:34 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Mutation Fiona Avangeline Jonathan
12:46 PM 2.00 hours (Feature #1181 (Closed): ESS Exit Clearance )
ESS Exit Clearance M Azid Wahyudi

06/10/2022

05:47 PM 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Staff Requisition Johanes Christian Kurni
03:44 PM 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Exit Clearance Fiona Avangeline Jonathan
10:53 AM 1.00 hour (Feature #1222 (Closed): ESS Exit Clearance - Autofill Field)
ESS Exit Clearance - Autofill Field M Azid Wahyudi
08:59 AM 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Exit Clearance Fiona Avangeline Jonathan

06/09/2022

12:08 PM 2.00 hours (Bug #1210 (Closed): [ Report ] - Performace Report Individu)
[ Report ] - Performace Report Individu M Azid Wahyudi

06/08/2022

05:32 PM 6.30 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Staff Requisition Johanes Christian Kurni
05:03 PM 6.30 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Exit Clearance Fiona Avangeline Jonathan
10:52 AM 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Staff Requisition Johanes Christian Kurni
09:04 AM 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Exit Clearance Fiona Avangeline Jonathan
 