04/06/2023

03:32 PM PERTALIFE Feature #2088 (Revise): Setting Waktu masa berlaku penilaian
dear bang ali ,, hasil diskusi tadi untuk ini di cancel ya menjadi yg di utamain feature forwarding di rapihkan
...
M Azid Wahyudi
03:01 PM BANK WOORI SAUDARA Bug #2083 (QA Test): [ESS-Leave] Mail Task
dear jo ,udah bisa di test ya
!clipboard-202304061457-w8ced.png!
package :
- deftask task paramaternya sa...
M Azid Wahyudi
03:01 PM BANK WOORI SAUDARA 2.00 hours (Bug #2083 (Closed): [ESS-Leave] Mail Task)
[ESS-Leave] Mail Task M Azid Wahyudi
10:35 AM PERTALIFE Bug #2110: PMS Final
penambahan :
messagecatalog :
- msgVal48Appraiser
- msgValAppraiser
M Azid Wahyudi

04/05/2023

04:43 PM TUGU PRATAMA INDONESIA (TPI) 1.00 hour (Project: TUGU PRATAMA INDONESIA (TPI))
support cs terkait data export training tidak ke get , langsung di benerkan di sisi client M Azid Wahyudi
04:40 PM PERTALIFE Bug #2110 (QA Test): PMS Final
dear bang fachrul , udah bisa di test ya
task no 1 : udah di bikin tinggal di setting yg mandatory kaya Qual grup...
M Azid Wahyudi
04:40 PM PERTALIFE 3.00 hours (Bug #2110 (QA Test): PMS Final)
PMS Final M Azid Wahyudi
11:04 AM HINO 1.00 hour (Project: HINO)
support CS , kebutuhan ESS Leave baptis langsung ke client M Azid Wahyudi
11:02 AM BANK WOORI SAUDARA 2.00 hours (Project: BANK WOORI SAUDARA)
mengecek HR time management overtime untuk kebutuhan fungsional M Azid Wahyudi
11:01 AM ROHTO 2.00 hours (Project: ROHTO)
mengecek kodingan dan flow untuk kebutuhan fungsional merapihkan ess travel M Azid Wahyudi
11:00 AM ROHTO BUGS 2.00 hours (Project: ROHTO BUGS)
mengecek kodingan dan flow untuk kebutuhan fungsional merapihkan ess travel M Azid Wahyudi
10:57 AM PERTALIFE 3.00 hours (Project: PERTALIFE)
support cs , issue async yg nyakut disisi client ada 10 reg id yang nyangkut , ini udah solve di sana dan selanjutnya... M Azid Wahyudi
10:55 AM PERTALIFE 3.00 hours (Project: PERTALIFE)
benerin pengajuan pms final yang nyangkut di prod client ada 10 reg id , M Azid Wahyudi
10:33 AM ROHTO BUGS 2.00 hours (Bug #2109 (QA Test): ESS - Travel Management)
ESS - Travel Management M Azid Wahyudi
10:33 AM ROHTO BUGS Bug #2109 (QA Test): ESS - Travel Management
dear nando , udah bisa di test ya
!clipboard-202304051031-weugw.png!
package :
- settingan di sdatatablefi...
M Azid Wahyudi

04/04/2023

10:20 AM BANK WOORI SAUDARA 1.00 hour (Bug #2106 (Closed): [ESS-Medical] Auto fill)
[ESS-Medical] Auto fill M Azid Wahyudi
10:20 AM BANK WOORI SAUDARA Bug #2106 (QA Test): [ESS-Medical] Auto fill
dear jo , point 1 udah bisa di test ya , untuk point 2 di makesure dulu ya biasanya ada mampingan berdasarkan costTyp... M Azid Wahyudi

04/03/2023

04:57 PM PERTALIFE Support #2105 (QA Test): Query Untuk Tarik Data Penilaian Kompetensi
dear bang ali , udah di kirim ke gtalk ya querynya
makasih
M Azid Wahyudi
04:57 PM PERTALIFE 2.00 hours (Support #2105 (Closed): Query Untuk Tarik Data Penilaian Kompetensi)
Query Untuk Tarik Data Penilaian Kompetensi M Azid Wahyudi
12:49 PM PERTALIFE Bug #2103 (Revise): PMS Score di edit lewat HR pada saat di submit error
untuk issue ini itu berawal karena essnya tidak ada validasi dan untuk di HR dia tidak boleh mengubah2 data2 di dala... M Azid Wahyudi
12:49 PM PERTALIFE 1.00 hour (Bug #2103 (Closed): PMS Score di edit lewat HR pada saat di submit error)
PMS Score di edit lewat HR pada saat di submit error M Azid Wahyudi
11:18 AM BANK WOORI SAUDARA 2.00 hours (Support #2095 (Closed): ESS Mutasi)
ESS Mutasi M Azid Wahyudi
11:18 AM BANK WOORI SAUDARA Support #2095 (QA Test): ESS Mutasi
package :
bizproc (beforesubmit)
custparam :
- YNGetPA02Data
- CheckDataPA02
message :
- msgCheckPosition
...
M Azid Wahyudi
11:13 AM PERTALIFE Bugs 1.00 hour (Bug #2102 (QA Test): [HR-PERFORMANCE APPRAISAL] ada error convert parameter kalau mengedit score di appraisal 6)
[HR-PERFORMANCE APPRAISAL] ada error convert parameter kalau mengedit score di appraisal 6 M Azid Wahyudi
11:13 AM PERTALIFE Bugs Bug #2102 (QA Test): [HR-PERFORMANCE APPRAISAL] ada error convert parameter kalau mengedit score di appraisal 6
dear masbin , untuk issue ini itu berawal karena essnya tidak ada validasi dan untuk di HR dia tidak boleh mengubah2 ... M Azid Wahyudi
08:59 AM PERTALIFE Bug #2101 (QA Test): PMS validasi inputan penilaian tidak boleh kosong
dear bang ali , udah bisa di test ya
package :
bizproc (beforesubmit)
makasih
M Azid Wahyudi
08:59 AM PERTALIFE 2.00 hours (Bug #2101 (Closed): PMS validasi inputan penilaian tidak boleh kosong)
PMS validasi inputan penilaian tidak boleh kosong M Azid Wahyudi

03/30/2023

05:35 PM BANK WOORI SAUDARA 3.00 hours (Project: BANK WOORI SAUDARA)
cek codingan2 ess loan kebutuhan fungsional M Azid Wahyudi
05:33 PM BANK WOORI SAUDARA 5.00 hours (Support #2095 (Closed): ESS Mutasi)
ESS Mutasi M Azid Wahyudi
05:33 PM BANK WOORI SAUDARA Support #2095 (QA Test): ESS Mutasi
dear fiona , udah bisa di test ya
package :
Sdatatabefield (field empidmut & position)
- lookup funtion
- se...
M Azid Wahyudi

03/29/2023

04:21 PM MINOVA DEMO 2.00 hours (Support #2032 (Closed): ERP Document Lock)
ERP Document Lock M Azid Wahyudi
04:21 PM MINOVA DEMO Support #2032 (QA Test): ERP Document Lock
dear fio , udah bisa di test yaa
package :
C:\MinovaES\WebServer\MinovaES_Demo\UI\app\controller\filo\docume...
M Azid Wahyudi

03/28/2023

05:11 PM BANK WOORI SAUDARA 4.00 hours (Project: BANK WOORI SAUDARA)
ESS (Exit_clear, Overtime, Leave ) + HR Time management M Azid Wahyudi
11:13 AM BANK WOORI SAUDARA 2.30 hours (Bug #2085 (Closed): [ESS-Overtime] Condition )
[ESS-Overtime] Condition M Azid Wahyudi
11:13 AM BANK WOORI SAUDARA Bug #2085 (QA Test): [ESS-Overtime] Condition
dear jo , udah bisa di test ya
package :
custparam
- CONDMAX
- CONDSPVBWS
- CONDSTFBWS
makasih
M Azid Wahyudi
10:32 AM BANK WOORI SAUDARA Feature #2087 (QA Test): ESS Exit Clearance
dear fio, udah bisa di test ya
package :
bizproc(afterrender)
makasih
M Azid Wahyudi
10:32 AM BANK WOORI SAUDARA 1.00 hour (Feature #2087 (Closed): ESS Exit Clearance )
ESS Exit Clearance M Azid Wahyudi

03/27/2023

04:39 PM BANK WOORI SAUDARA 1.00 hour (Bug #2076 (Closed): [ESS-Leave] Condition)
[ESS-Leave] Condition M Azid Wahyudi
04:39 PM BANK WOORI SAUDARA Bug #2076 (QA Test): [ESS-Leave] Condition
dear jo , coba test lagi
package :
custparam
- Cond1Leave
- Cond2Leave
- Cond3Leave
makasih
M Azid Wahyudi
03:20 PM BANK WOORI SAUDARA Feature #2087 (QA Test): ESS Exit Clearance
dear fiona , udah bisa di test ya
Package :
bizproc (Afterrender)
cutparam (YNGetPA14Data & YNGetPA14OPData)
...
M Azid Wahyudi
03:20 PM BANK WOORI SAUDARA 1.50 hour (Feature #2087 (Closed): ESS Exit Clearance )
ESS Exit Clearance M Azid Wahyudi
01:11 PM PERTALIFE 1.00 hour (Project: PERTALIFE)
deploy report posting to GL di 77 M Azid Wahyudi
01:11 PM BANK WOORI SAUDARA 1.30 hour (Project: BANK WOORI SAUDARA)
debug async pada saat fieldpos ada issue pada saat fieldpos ke phrpa0002 ada settingan lain M Azid Wahyudi
10:59 AM BANK WOORI SAUDARA 2.00 hours (Project: BANK WOORI SAUDARA)
debugg async untuk workflow leave ,, karena ada issue error di runtaskasync global M Azid Wahyudi
10:55 AM BANK WOORI SAUDARA 1.00 hour (Bug #2083 (Closed): [ESS-Leave] Mail Task)
[ESS-Leave] Mail Task M Azid Wahyudi
10:55 AM BANK WOORI SAUDARA Bug #2083 (Revise): [ESS-Leave] Mail Task
dear jo , untuk ini harap di coba dulu dengan masukan email masing2 sesuai kebutuhan task idnya
makasih
M Azid Wahyudi
08:30 AM BANK WOORI SAUDARA Bug #2066: [HR-Time Management] Time Data - Absence
task ini , di client ada yg udah aman mba , nanti saya coba test dan deploy untuk BWS M Azid Wahyudi

03/24/2023

04:03 PM PERTALIFE Bug #2074 (Assigned): [Report-Posting To GL] Company, Cost Center
dear jo , untuk ini tinggal nunggu kordinasi sama bang daud terkait template
makasih
M Azid Wahyudi
04:03 PM PERTALIFE 1.00 hour (Bug #2074 (Closed): [Report-Posting To GL] Company, Cost Center)
[Report-Posting To GL] Company, Cost Center M Azid Wahyudi
03:07 PM BANK WOORI SAUDARA Bug #1936 (QA Test): [HR-Recruitment Management] Applicant Master Data - Personal Statement
dear jo , itu settingan nya gausah di mandatory
makasih
M Azid Wahyudi
03:07 PM BANK WOORI SAUDARA 1.00 hour (Bug #1936 (Closed): [HR-Recruitment Management] Applicant Master Data - Personal Statement)
[HR-Recruitment Management] Applicant Master Data - Personal Statement M Azid Wahyudi
11:00 AM BANK WOORI SAUDARA 1.00 hour (Bug #2069 (Closed): [ESS-Staff Requisition] Conditoin Kantor Pusat)
[ESS-Staff Requisition] Conditoin Kantor Pusat M Azid Wahyudi
11:00 AM BANK WOORI SAUDARA Bug #2069 (QA Test): [ESS-Staff Requisition] Conditoin Kantor Pusat
dear jo , udah bisa di test ya
package :
custparam
- CondOffice
makasih
M Azid Wahyudi
10:53 AM BANK WOORI SAUDARA Bug #2079 (QA Test): [ESS-Staff Requisition] Flow approval
dear jo , udah bisa di test ya
package :
custparam
- ApvKadiv
- ApvBranchMgr
- ApvSDMCabangNew
deftask...
M Azid Wahyudi
10:53 AM BANK WOORI SAUDARA 1.30 hour (Bug #2079 (Closed): [ESS-Staff Requisition] Flow approval)
[ESS-Staff Requisition] Flow approval M Azid Wahyudi
10:22 AM BANK WOORI SAUDARA Bug #2076 (QA Test): [ESS-Leave] Condition
dear jo , udah bisa di test ya
package :
custparam
- Cond1Leave
- Cond2Leave
- Cond3Leave
- CondBS
- Co...
M Azid Wahyudi
10:22 AM BANK WOORI SAUDARA 2.30 hours (Bug #2076 (Closed): [ESS-Leave] Condition)
[ESS-Leave] Condition M Azid Wahyudi

03/21/2023

10:41 AM BANK WOORI SAUDARA Bug #2076: [ESS-Leave] Condition
note point 1 :
requester cek dulu berdasarkan organisasi level
M Azid Wahyudi

03/20/2023

07:24 PM BANK KALTENG Bugs Bug #2071 (QA Test): [HR-GENERATE USER]pada saat generate user pasti untuk employee terakhir tidak dapat ter generate
dear masbin , udah bisa ya udah di deploy juga di sana
!clipboard-202303201923-lzmls.png!
makasih
M Azid Wahyudi
07:24 PM BANK KALTENG Bugs 1.30 hour (Bug #2071 (Deploy): [HR-GENERATE USER]pada saat generate user pasti untuk employee terakhir tidak dapat ter generate)
[HR-GENERATE USER]pada saat generate user pasti untuk employee terakhir tidak dapat ter generate M Azid Wahyudi
09:56 AM BANK KALTENG Bugs Bug #2071: [HR-GENERATE USER]pada saat generate user pasti untuk employee terakhir tidak dapat ter generate
tolong bikinin datanya didong buat testing dan fixing M Azid Wahyudi
11:14 AM BANK WOORI SAUDARA 1.00 hour (Bug #2070 (Revise): [ESS-Overtime] Belum membaca flow approval selanjutnya)
[ESS-Overtime] Belum membaca flow approval selanjutnya M Azid Wahyudi
11:14 AM BANK WOORI SAUDARA Bug #2070 (Revise): [ESS-Overtime] Belum membaca flow approval selanjutnya
dear jo , dear jo berikut ini kondisi2 yg ada di overtime , jadi kenapa 00000837 setelah ds1 langsung posting karena ... M Azid Wahyudi
10:35 AM BANK WOORI SAUDARA Bug #2069: [ESS-Staff Requisition] Conditoin Kantor Pusat
dear jo , udah bisa di test yaa
package :
update custparam (CondOffice)
makasih
M Azid Wahyudi
10:35 AM BANK WOORI SAUDARA 1.00 hour (Bug #2069 (Closed): [ESS-Staff Requisition] Conditoin Kantor Pusat)
[ESS-Staff Requisition] Conditoin Kantor Pusat M Azid Wahyudi

03/16/2023

02:57 PM MINOVA DEMO Support #1845 (QA Test): [Performance Management] - Import, Export
M Azid Wahyudi
02:56 PM MINOVA DEMO Support #1845: [Performance Management] - Import, Export
dear fiona , udah bisa di test ya
package :
export
EDIT SMENU
PM05 PM 5 ES EMPDATA 0 1 0 /Page/exportPM05 1 E...
M Azid Wahyudi
02:56 PM MINOVA DEMO 2.00 hours (Support #1845 (Closed): [Performance Management] - Import, Export)
[Performance Management] - Import, Export M Azid Wahyudi

03/15/2023

03:57 PM BANK WOORI SAUDARA Bug #2064 (QA Test): [ESS-Exit Clearance] Condition Approve
dear jo , udah bisa di test ya , tapi setau gw ess ini belom di test detail dari awal approvalnya udah sesuai atau be... M Azid Wahyudi
03:57 PM BANK WOORI SAUDARA 1.30 hour (Bug #2064 (Closed): [ESS-Exit Clearance] Condition Approve )
[ESS-Exit Clearance] Condition Approve M Azid Wahyudi
02:51 PM MINOVAIS SILVER PACKAGE 6.00 hours (Support #1491 (Closed): [Performance Management] - Import Export)
[Performance Management] - Import Export M Azid Wahyudi
02:51 PM MINOVAIS SILVER PACKAGE Support #1491 (QA Test): [Performance Management] - Import Export
dear fiona , udah bisa di test ya
package :
export
EDIT SMENU
PM05 PM 5 ES EMPDATA 0 1 0 /Page/exportPM05 1 ...
M Azid Wahyudi

03/14/2023

06:10 PM BANK WOORI SAUDARA 2.00 hours (Project: BANK WOORI SAUDARA)
mengecek flow satu persatu kondisi kondisinya untuk mempermudah tim fungsional M Azid Wahyudi
06:08 PM ROHTO 1.00 hour (Project: ROHTO)
ngecek dan merapihkan query liat ds ke client M Azid Wahyudi
06:07 PM ROHTO 1.00 hour (Project: ROHTO)
ngecek dan merapihkan query ds ke client M Azid Wahyudi
06:06 PM MINOVAES - PRODUCT 1.00 hour (Project: MINOVAES - PRODUCT)
cek modul travel di hr tidak bisa saving M Azid Wahyudi
06:05 PM Bank Mega 3.00 hours (Project: Bank Mega)
tunning query report list M Azid Wahyudi
06:04 PM BANK WOORI SAUDARA Bug #2060 (QA Test): [ESS-Leave] Workflow - Condition
dear jo , udah bisa di test yaa
package :
- update defttask (parameter)
- create custparam (Cond5Daysubordinat...
M Azid Wahyudi
06:04 PM BANK WOORI SAUDARA 3.00 hours (Bug #2060 (Closed): [ESS-Leave] Workflow - Condition)
[ESS-Leave] Workflow - Condition M Azid Wahyudi
05:35 PM BANK WOORI SAUDARA Bug #2060: [ESS-Leave] Workflow - Condition
note tambahan :
task id apv_dir_bs
di biki grup approval
M Azid Wahyudi
10:21 AM BANK WOORI SAUDARA Bug #2060: [ESS-Leave] Workflow - Condition
note :
untuk point 2
jika dia direkturnya sama dengan apv_dir_bs maka langsung posting ini khusus Business Support
M Azid Wahyudi
04:16 PM BANK WOORI SAUDARA Bug #2063: [ESS-Overtime] Validasi durasi jam lembur
dear jo , untuk ini bukan validasi notif ini hanya buat untuk informasi
tinggal cek aja flow dan approvalnya udah ...
M Azid Wahyudi
04:16 PM BANK WOORI SAUDARA 2.00 hours (Bug #2063 (Closed): [ESS-Overtime] Validasi durasi jam lembur)
[ESS-Overtime] Validasi durasi jam lembur M Azid Wahyudi

03/13/2023

05:12 PM BANK WOORI SAUDARA Bug #2046 (QA Test): [ESS-Overtime] Autofill
M Azid Wahyudi
05:12 PM BANK WOORI SAUDARA 1.00 hour (Bug #2046 (Closed): [ESS-Overtime] Autofill )
[ESS-Overtime] Autofill M Azid Wahyudi
08:08 AM BANK WOORI SAUDARA Bug #2046 (QA Test): [ESS-Overtime] Autofill
M Azid Wahyudi
09:28 AM MINOVAIS SILVER PACKAGE Support #1491: [Performance Management] - Import Export
47 = insert
48 = update
M Azid Wahyudi
09:22 AM BANK WOORI SAUDARA 2.00 hours (Bug #2055 (Closed): [ESS-Overtime] Validasi hari libur)
[ESS-Overtime] Validasi hari libur M Azid Wahyudi
09:22 AM BANK WOORI SAUDARA Bug #2055 (QA Test): [ESS-Overtime] Validasi hari libur
dear jo ,, udah bisa di test ya
package :
- bizproc (OnInitExtensions & OnMethodExtensions)
- custparam (...
M Azid Wahyudi

03/10/2023

07:28 PM ROHTO 4.00 hours (Project: ROHTO)
merapihkan codingan dan settingan pms final dan testing bareng bang daud M Azid Wahyudi
07:26 PM BBG Bugs 1.00 hour (Project: BBG Bugs)
deploy ke client wokrflow travel M Azid Wahyudi
07:26 PM BBG Bugs Feature #2058 (QA Test): [BBG - ESS Travel] Penambahan Kondisi Employee Inisitor
dear bang daud, udah bisa di test ya
package :
update custparam (cond_TR_creator_level_NEW)
create function ...
M Azid Wahyudi
07:26 PM BBG Bugs 3.00 hours (Feature #2058 (QA Test): [BBG - ESS Travel] Penambahan Kondisi Employee Inisitor)
[BBG - ESS Travel] Penambahan Kondisi Employee Inisitor M Azid Wahyudi
02:11 PM BANK WOORI SAUDARA Bug #2046: [ESS-Overtime] Autofill
dear jo dan bang fachrul , udah bisa di test penambahannya
!clipboard-202303101411-5wr1f.png!
makasih
M Azid Wahyudi
02:11 PM BANK WOORI SAUDARA 2.00 hours (Bug #2046 (Closed): [ESS-Overtime] Autofill )
[ESS-Overtime] Autofill M Azid Wahyudi
07:53 AM BANK WOORI SAUDARA Bug #2046 (Revise): [ESS-Overtime] Autofill
dear jo ,,
untuk ini udah bener querynya , hanya kata2 errornya untuk hari libur belom ada
tolong buat kan kata2...
M Azid Wahyudi
 