03/02/2023

05:22 PM BANK WOORI SAUDARA 2.00 hours (Bug #2035 (Closed): [ESS-Overtime] Request ID masuk ke table PCMWFRUNTASKASYNC)
[ESS-Overtime] Request ID masuk ke table PCMWFRUNTASKASYNC M Azid Wahyudi
05:19 PM Bank Kalteng (Phase 2) 2.00 hours (Bug #2040 (Closed): ESS Leave error di Async)
ESS Leave error di Async M Azid Wahyudi
02:39 PM MINOVA DEMO 1.00 hour (Project: MINOVA DEMO)
Setting Financial Dashboard Fiona Avangeline Jonathan
02:37 PM MINOVA DEMO 5.00 hours (Project: MINOVA DEMO)
Merge setting Online Help, Lock Document dan UI baru Inbox ke demo Fiona Avangeline Jonathan
10:44 AM MINOVAES - PRODUCT 2.00 hours (Support #2034 (Closed): Lock WF ESS)
Testing Fiona Avangeline Jonathan

03/01/2023

06:19 PM BANK KALTENG 1.00 hour (Project: BANK KALTENG)
cek issue dari bang fachrul M Azid Wahyudi
06:18 PM MINOVAIS SILVER PACKAGE 2.50 hours (Project: MINOVAIS SILVER PACKAGE)
export import modul performance export done M Azid Wahyudi
06:17 PM PT BIA 1.50 hour (Project: PT BIA)
report SPT fix M Azid Wahyudi
03:54 PM MINOVAES - PRODUCT 2.00 hours (Support #2034 (Closed): Lock WF ESS)
Setting Fiona Avangeline Jonathan
02:39 PM MINOVAIS SILVER PACKAGE 3.00 hours (Support #1491 (Closed): [Performance Management] - Import Export)
Tambah menu, Bikin contoh data import Fiona Avangeline Jonathan
02:18 PM PT BIA 1.00 hour (Feature #2030 (Closed): Payroll Administration - Report Bank Tranfer)
shofwan shiddiq
11:58 AM PT BIA 2.00 hours (Bug #2036 (Revise): Report ESPT Tahunan)
Report ESPT Tahunan M Azid Wahyudi
11:41 AM MINOVAES - PRODUCT 1.00 hour (Feature #1744 (Closed): List Get Data "My Staff" BI Dashboard - Benefits)
Lengkapin data Fiona Avangeline Jonathan
10:12 AM PT ARITA 2.00 hours (Support #1983 (Closed): Validasi Appraiser, KPI dan Qualification)
Testing Fiona Avangeline Jonathan

02/28/2023

06:01 PM BANK WOORI SAUDARA 1.00 hour (Bug #2022 (Closed): [ESS-Leave] Tombol Draft)
[ESS-Leave] Tombol Draft M Azid Wahyudi
05:46 PM BANK WOORI SAUDARA 5.00 hours (Project: BANK WOORI SAUDARA)
Setting flow ESS Exit Clearance dan cek flow ESS Staff Requisition Mega Yunita
05:44 PM KJL 3.00 hours (Project: KJL )
Update data karyawan resign Mega Yunita
05:44 PM PT BIA 3.50 hours (Project: PT BIA)
ngemerge source code minovais.minovaes.data.element.dll dengan source code mang wanto kebutuhan upload attandance dan... M Azid Wahyudi
05:42 PM BANK WOORI SAUDARA 1.00 hour (Project: BANK WOORI SAUDARA)
mengecek workflow bws exit_clearance bareng mega M Azid Wahyudi
05:41 PM MINOVAES - PRODUCT 1.50 hour (Project: MINOVAES - PRODUCT)
membenarkan issue inbox yang bermasalah di workflow UI baru M Azid Wahyudi
05:36 PM BANK WOORI SAUDARA 1.00 hour (Bug #2035 (Closed): [ESS-Overtime] Request ID masuk ke table PCMWFRUNTASKASYNC)
[ESS-Overtime] Request ID masuk ke table PCMWFRUNTASKASYNC M Azid Wahyudi
04:13 PM MINOVAES - PRODUCT 1.00 hour (Feature #1767 (Closed): List Get Data "My Staff" BI Dashboard - Cost)
Testing Fiona Avangeline Jonathan
03:41 PM Minova ERP Internal 3.50 hours (Project: Minova ERP Internal)
Renewal AM Document Fiona Avangeline Jonathan
11:55 AM MINOVAES - PRODUCT 3.50 hours (Project: MINOVAES - PRODUCT)
Setting, Testing Lock WF dan Doc ERP Fiona Avangeline Jonathan

02/27/2023

05:53 PM PT BIA 1.00 hour (Project: PT BIA)
Regular Payroll BIA Fiona Avangeline Jonathan
05:43 PM ARITA Bugs 1.00 hour (Project: ARITA Bugs)
Setting grid TM to PY Pemotongan karena Keterlambatan Mega Yunita
05:41 PM BANK WOORI SAUDARA 2.00 hours (Project: BANK WOORI SAUDARA)
Testing flow Exit Clearance BWS Mega Yunita
05:40 PM KJL 3.00 hours (Project: KJL )
Input data KJL Mega Yunita
05:40 PM BANK WOORI SAUDARA 2.00 hours (Project: BANK WOORI SAUDARA)
Sharing session ERP Mega Yunita
05:17 PM BANK WOORI SAUDARA 8.00 hours (Project: BANK WOORI SAUDARA)
BWS Johanes Christian Kurni
05:16 PM BANK WOORI SAUDARA 1.00 hour (Project: BANK WOORI SAUDARA)
Meeting Online Johanes Christian Kurni
05:13 PM Minova ERP Internal 3.00 hours (Project: Minova ERP Internal)
Sharing Session ERP Johanes Christian Kurni
05:09 PM BANK WOORI SAUDARA 4.00 hours (Project: BANK WOORI SAUDARA)
ESS Leave Johanes Christian Kurni
05:08 PM BANK WOORI SAUDARA 8.00 hours (Project: BANK WOORI SAUDARA)
Visit BWS Johanes Christian Kurni
05:07 PM BANK WOORI SAUDARA 2.50 hours (Project: BANK WOORI SAUDARA)
membahas flow2 dan mengecek satu persatu flow M Azid Wahyudi
05:03 PM MINOVAES - PRODUCT 1.00 hour (Project: MINOVAES - PRODUCT)
UI PMS M Azid Wahyudi
05:01 PM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
sharing session M Azid Wahyudi
04:40 PM BANK WOORI SAUDARA 1.50 hour (Bug #2026 (Closed): [ESS Exit Clearance] Sistem belum membaca Flow Approval Selanjutnya)
[ESS Exit Clearance] Sistem belum membaca Flow Approval Selanjutnya M Azid Wahyudi
03:30 PM MINOVAES - PRODUCT 1.00 hour (Feature #1763 (Closed): List Get Data "My Staff" BI Dashboard - Recent Claim)
Testing Fiona Avangeline Jonathan
01:27 PM MINOVAES - PRODUCT 1.00 hour (Feature #1763 (Closed): List Get Data "My Staff" BI Dashboard - Recent Claim)
shofwan shiddiq
03:26 PM MINOVAES - PRODUCT 1.00 hour (Feature #1761 (Closed): List Get Data "My Staff" BI Dashboard - Medical Data)
Testing Fiona Avangeline Jonathan
02:34 PM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
Sharing Session ERP Fiona Avangeline Jonathan
02:33 PM MINOVAIS SILVER PACKAGE 2.00 hours (Support #1612 (Closed): [Performance Management] - UI PMS)
Setting SDATATABLEFIELD Fiona Avangeline Jonathan
09:30 AM MINOVAES - PRODUCT 1.00 hour (Feature #1756 (Closed): List Get Data "My Staff" BI Dashboard - Risk Profile)
Testing Fiona Avangeline Jonathan

02/24/2023

06:56 PM BANK WOORI SAUDARA 2.50 hours (Project: BANK WOORI SAUDARA)
mengerjakan ess exit mengicil dari flow , query , testing M Azid Wahyudi
06:55 PM PERTALIFE 2.50 hours (Project: PERTALIFE)
mengecek async pertalife di sana dan merapihkan table runasync yg error M Azid Wahyudi
06:28 PM MINOVAES - PRODUCT 1.00 hour (Feature #1756 (Closed): List Get Data "My Staff" BI Dashboard - Risk Profile)
shofwan shiddiq
05:43 PM PT BIA 8.00 hours (Project: PT BIA)
Input data PHRPA0019, PHRPA0016, PHRPA0004 untuk kebutuhan running payroll Fiona Avangeline Jonathan
03:23 PM BANK WOORI SAUDARA 3.00 hours (Support #2025 (Closed): [ESS-Leave] Leave -Diluar Tanggungan)
[ESS-Leave] Leave -Diluar Tanggungan M Azid Wahyudi
03:01 PM Bank Kalteng (Phase 2) 1.00 hour (Feature #2012 (Closed): [Report Leave] Penambahan Title Remaining Quota Cuti Tahunan dan Cuti Besar)
shofwan shiddiq

02/23/2023

08:01 PM BBG Bugs 1.50 hour (Bug #2015 (Closed): [ESS-LEAVE]Form ESS pada saat di inbox approval ds1 nya tidak keluar datanya pada kolom kolom)
[ESS-LEAVE]Form ESS pada saat di inbox approval ds1 nya tidak keluar datanya pada kolom kolom M Azid Wahyudi
07:04 PM PERTALIFE 1.50 hour (Project: PERTALIFE)
bantu cek issue dari cs dan bang ali serta deploy rdl dan sp M Azid Wahyudi
06:57 PM ROHTO 1.50 hour (Project: ROHTO)
cek issue dari cs untuk upload eduction M Azid Wahyudi
06:49 PM PT ARITA 2.00 hours (Project: PT ARITA)
siapin package ess exit ke 66 M Azid Wahyudi
06:48 PM BANK WOORI SAUDARA 1.50 hour (Project: BANK WOORI SAUDARA)
bikin query ujntuk autofill M Azid Wahyudi
05:51 PM KJL 6.00 hours (Project: KJL )
Insert Data KJL untuk Karyawan Vendor Monas Mega Yunita
05:09 PM PT BIA 8.00 hours (Project: PT BIA)
Data PHRPA0019 Fiona Avangeline Jonathan
03:25 PM MINOVAIS SILVER PACKAGE 1.50 hour (Support #1612 (Closed): [Performance Management] - UI PMS)
[Performance Management] - UI PMS M Azid Wahyudi
10:49 AM ARITA Bugs 2.00 hours (Feature #2027 (Closed): [TM To PY] Menghitung Potongan Keterlambatan)
Mega Yunita

02/22/2023

05:57 PM BANK WOORI SAUDARA 1.00 hour (Project: BANK WOORI SAUDARA)
ESS - Overtime Johanes Christian Kurni
05:20 PM PT BIA 4.00 hours (Project: PT BIA)
Input data Attendance Fiona Avangeline Jonathan
05:10 PM BANK WOORI SAUDARA 1.50 hour (Project: BANK WOORI SAUDARA)
membantu fungsional mega dan jo untuk workflow berserta ketentuan2an M Azid Wahyudi
05:04 PM BANK WOORI SAUDARA 3.00 hours (Support #2025 (Closed): [ESS-Leave] Leave -Diluar Tanggungan)
ESS - Leave Johanes Christian Kurni
04:51 PM BANK WOORI SAUDARA 4.00 hours (Project: BANK WOORI SAUDARA)
ESS - Education Johanes Christian Kurni
04:43 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Migrasi data Johanes Christian Kurni
04:42 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Migrasi data Johanes Christian Kurni
03:53 PM KJL 1.50 hour (Project: KJL )
[ESS] Menghilangkan Action Draft M Azid Wahyudi
03:49 PM BANK WOORI SAUDARA 1.50 hour (Bug #2022 (Closed): [ESS-Leave] Tombol Draft)
[ESS-Leave] Tombol Draft M Azid Wahyudi
02:58 PM BANK KALTENG 1.00 hour (Bug #2020 (Closed): [ESS Leave] Validasi Pengajuan Cuti Menghitung Calender Days)
[ESS Leave] Validasi Pengajuan Cuti Menghitung Calender Days M Azid Wahyudi
10:57 AM BANK KALTENG 1.50 hour (Bug #2020 (Closed): [ESS Leave] Validasi Pengajuan Cuti Menghitung Calender Days)
[ESS Leave] Validasi Pengajuan Cuti Menghitung Calender Days M Azid Wahyudi
02:50 PM MINOVA DEMO 2.00 hours (Bug #2019 (Closed): Lookup yang dipilih tidak masuk ke grid)
Testing Fiona Avangeline Jonathan
12:38 PM BANK WOORI SAUDARA 2.00 hours (Bug #1982 (Closed): [ESS-HR] Education)
[ESS-HR] Education M Azid Wahyudi
11:34 AM MINOVA DEMO 2.00 hours (Bug #2008 (Closed): [Logistic & Service - Project Management] Project Management Tidak Bisa Saving)
Testing Fiona Avangeline Jonathan
09:45 AM Bank Kalteng (Phase 2) 1.00 hour (Feature #2012 (Closed): [Report Leave] Penambahan Title Remaining Quota Cuti Tahunan dan Cuti Besar)
shofwan shiddiq

02/21/2023

05:47 PM BBG 1.00 hour (Project: BBG)
membantu masbin mengecek UI BBG versi 3 ,, untuk di taro di minova M Azid Wahyudi
05:45 PM Bank Mega Syariah Existing 1.50 hour (Project: Bank Mega Syariah Existing)
deploy ke client modul pms dan report monitoring M Azid Wahyudi
05:35 PM BANK WOORI SAUDARA 2.50 hours (Bug #2011 (Closed): [ESS-Leave] Sharing Approval)
[ESS-Leave] Sharing Approval M Azid Wahyudi
05:28 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Finance HR Admin Activity Jane Syafira
05:27 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Finance HR Admin Activity Jane Syafira
05:26 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Finance HR Admin Activity Jane Syafira
05:25 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Finance HR Admin Activity Jane Syafira
05:24 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Finance HR Admin Activity Jane Syafira
05:23 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Finance HR Admin Activity Jane Syafira
05:08 PM MINOVA DEMO 4.00 hours (Project: MINOVA DEMO)
Design report project management Fiona Avangeline Jonathan
05:07 PM MINOVA DEMO 4.00 hours (Bug #2008 (Closed): [Logistic & Service - Project Management] Project Management Tidak Bisa Saving)
Setting Fiona Avangeline Jonathan
12:31 PM CLIENT SUPPORT 8.00 hours (Project: CLIENT SUPPORT)
membantu client support dan membantu tim project M Azid Wahyudi
12:30 PM PERTALIFE 1.00 hour (Project: PERTALIFE)
mengecek issue dari cs , bareng mas daud dan masbin M Azid Wahyudi
12:28 PM BBG Bugs 1.00 hour (Project: BBG Bugs)
mengecek UI versi 3 workflow leave tidak ke ambil datanya dari cs M Azid Wahyudi
12:27 PM Bank Mega Syariah Existing 1.00 hour (Project: Bank Mega Syariah Existing)
mengecek PUK 2 dan menunggu data dari masbin M Azid Wahyudi
12:26 PM Bank Mega Syariah Existing 3.00 hours (Project: Bank Mega Syariah Existing)
mengubah query report monitoring dan merapihkan sesuai yg di minta M Azid Wahyudi
12:24 PM BANK WOORI SAUDARA 6.00 hours (Project: BANK WOORI SAUDARA)
mengecek UI bws keperluan delageTo dan membikin search M Azid Wahyudi
11:44 AM MINOVAES - PRODUCT 2.00 hours (Project: MINOVAES - PRODUCT)
Tabel baru CRM Fiona Avangeline Jonathan
10:45 AM PERTALIFE Bugs 1.00 hour (Bug #2016 (Closed): [ESS-Leave]pengajuan cuti tidak terbentuk data runtask nya)
[ESS-Leave]pengajuan cuti tidak terbentuk data runtask nya M Azid Wahyudi
09:44 AM Bank Mega Syariah Existing 1.00 hour (Bug #2013 (Closed): [HR-Report PMS Monitoring] report hanya menampilkan data periode yang terbaru saja)
[HR-Report PMS Monitoring] report hanya menampilkan data periode yang terbaru saja M Azid Wahyudi

02/20/2023

05:42 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
Fiona Avangeline Jonathan
12:33 PM Bank Kalteng (Phase 2) 2.00 hours (Feature #2012 (Closed): [Report Leave] Penambahan Title Remaining Quota Cuti Tahunan dan Cuti Besar)
shofwan shiddiq
09:51 AM MINOVA DEMO 6.00 hours (Project: MINOVA DEMO)
Fiona Avangeline Jonathan

02/16/2023

03:55 PM Bank Kalteng (Phase 2) 1.00 hour (Feature #2012 (Closed): [Report Leave] Penambahan Title Remaining Quota Cuti Tahunan dan Cuti Besar)
shofwan shiddiq
12:12 PM Bank Kalteng (Phase 2) 1.00 hour (Feature #2012 (Closed): [Report Leave] Penambahan Title Remaining Quota Cuti Tahunan dan Cuti Besar)
Mega Yunita
02:57 PM Bank Kalteng (Phase 2) 1.00 hour (Bug #2010 (Closed): [Report Leave] Tampilkan Header Jika Data di DB Kosong)
shofwan shiddiq
10:39 AM Bank Kalteng (Phase 2) 1.00 hour (Bug #2010 (Closed): [Report Leave] Tampilkan Header Jika Data di DB Kosong)
Mega Yunita
02:29 PM Bank Mega 3.00 hours (Bug #1996 (User Test): [HR - Payroll Report] Report Employee List)
Report Payroll Employee List shofwan shiddiq

02/15/2023

09:43 PM BANK KALTENG 1.50 hour (Bug #2009 (Closed): [ESS Leave] Validasi Cuti Bersalin)
[ESS Leave] Validasi Cuti Bersalin M Azid Wahyudi
05:27 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
Fiona Avangeline Jonathan
05:01 PM BANK WOORI SAUDARA 4.00 hours (Bug #2004 (Closed): [ESS-Leave] Field Delegate to)
[ESS-Leave] Field Delegate to M Azid Wahyudi

02/14/2023

07:51 PM PERTALIFE 2.00 hours (Project: PERTALIFE)
deploy update PMS dll ke client dan di makesure perubahan2nya M Azid Wahyudi
07:48 PM Bank Mega 2.00 hours (Project: Bank Mega)
report leave M Azid Wahyudi
05:33 PM Bank Mega Syariah Existing 4.00 hours (Feature #2005 (Closed): [HR-Report PMS Monitoring] ingin ditampilkan report nya untuk status yang masih dalam proses draft)
[HR-Report PMS Monitoring] ingin ditampilkan report nya untuk status yang masih dalam proses draft M Azid Wahyudi
05:32 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
Fiona Avangeline Jonathan
02:01 PM ROHTO BUGS 1.00 hour (Project: ROHTO BUGS)
mengecek menu training rotho ketika execute tidak jalan M Azid Wahyudi
02:00 PM MINOVA DEMO 1.00 hour (Project: MINOVA DEMO)
mengecek UI ga sesuai menu project menegement with mega M Azid Wahyudi
01:59 PM Bank Mega 6.00 hours (Project: Bank Mega)
membantu mengecek dan merapihkan report mutasi dan leave bareng tim cs M Azid Wahyudi

02/13/2023

05:50 PM MINOVA DEMO 4.00 hours (Project: MINOVA DEMO)
Fiona Avangeline Jonathan
02:37 PM MINOVA DEMO 1.00 hour (Bug #2002 (Closed): [Time Management] - View Personal WS)
Testing Fiona Avangeline Jonathan
12:21 PM MINOVA DEMO 1.00 hour (Bug #2002 (Closed): [Time Management] - View Personal WS)
[Time Management] - View Personal WS M Azid Wahyudi
02:35 PM MINOVAES - PRODUCT 1.00 hour (Support #2000 (Closed): Filter YEAR)
Testing Fiona Avangeline Jonathan
12:38 PM MINOVAES - PRODUCT 1.50 hour (Support #2000 (Closed): Filter YEAR)
Filter YEAR M Azid Wahyudi
11:03 AM MINOVAIS SILVER PACKAGE 1.00 hour (Support #1999 (Closed): Generate Personal WS)
Testing Fiona Avangeline Jonathan
10:53 AM MINOVAIS SILVER PACKAGE 1.00 hour (Support #1999 (Closed): Generate Personal WS)
Generate Personal WS M Azid Wahyudi
10:57 AM MINOVAIS SILVER PACKAGE 1.00 hour (Bug #1492 (Closed): [Time Management] - View Personal WS)
Testing Fiona Avangeline Jonathan
10:41 AM MINOVAIS SILVER PACKAGE 1.50 hour (Bug #1492 (Closed): [Time Management] - View Personal WS)
[Time Management] - View Personal WS M Azid Wahyudi

02/10/2023

04:42 PM Minova ERP Internal 1.50 hour (Project: Minova ERP Internal)
Meeting Karyawan Fiona Avangeline Jonathan
04:41 PM MINOVAES - PRODUCT 5.50 hours (Project: MINOVAES - PRODUCT)
Fiona Avangeline Jonathan
04:22 PM ROHTO BUGS 1.00 hour (Bug #1993 (Closed): [HR-PMS Employee Individu] Employee 00001359 tidak keluar data nya tetapi untuk contoh 00000003 tampil)
shofwan shiddiq
10:52 AM MINOVAIS SILVER PACKAGE 1.00 hour (Bug #1627 (Closed): Generate Work Schedule Calendar)
Testing Fiona Avangeline Jonathan
10:47 AM MINOVAIS SILVER PACKAGE 1.00 hour (Bug #1627 (Closed): Generate Work Schedule Calendar)
Generate Work Schedule Calendar M Azid Wahyudi

02/09/2023

05:10 PM BANK KALTENG 1.00 hour (Project: BANK KALTENG)
membantu fungsional checking perihal employee movement M Azid Wahyudi
05:08 PM BANK WOORI SAUDARA 1.00 hour (Project: BANK WOORI SAUDARA)
membantu fungsional memahami workflow M Azid Wahyudi
05:07 PM Bank Mega 5.00 hours (Project: Bank Mega)
membantu membuat query report mutasi M Azid Wahyudi
03:58 PM MINOVAES - PRODUCT 5.50 hours (Project: MINOVAES - PRODUCT)
Setting menu web view mobile Fiona Avangeline Jonathan
02:14 PM ROHTO BUGS 1.00 hour (Bug #1998 (Closed): [HR-TRAINING DATA] Engine Training Event salah menginsert attendance pada employee)
Testing di product Fiona Avangeline Jonathan
11:36 AM MINOVAES - PRODUCT 1.50 hour (Support #1997 (Assigned): New MD di User Management)
Setting new MD Fiona Avangeline Jonathan

02/08/2023

06:23 PM BANK WOORI SAUDARA 0.50 hour (Project: BANK WOORI SAUDARA)
ngecek workflow leave pada saat kondisi absenType 0005 approval M Azid Wahyudi
05:50 PM MINOVAES - PRODUCT 8.00 hours (Project: MINOVAES - PRODUCT)
Fiona Avangeline Jonathan
04:55 PM Bank Mega Syariah Existing 0.50 hour (Project: Bank Mega Syariah Existing)
mengecek perihal ess dan report yg lemot M Azid Wahyudi
04:51 PM BANK KALTENG 0.50 hour (Project: BANK KALTENG)
mengecek workflow leave perihal approval ds1 M Azid Wahyudi
04:50 PM BANK WOORI SAUDARA 1.00 hour (Project: BANK WOORI SAUDARA)
makesure workflow travel dan leave M Azid Wahyudi
04:48 PM PERTALIFE 2.00 hours (Project: PERTALIFE)
merapihkan data di port 51115 untuk di deploy ke sana M Azid Wahyudi
01:52 PM TUGU PRATAMA INDONESIA (TPI) 3.50 hours (Feature #1991 (Closed): [HR-EMPLOYEE MOVEMENT] Menu employee movement tidak bisa mengambil generateid berdasarkan tipe employee type)
[HR-EMPLOYEE MOVEMENT] Menu employee movement tidak bisa mengambil generateid berdasarkan tipe employee type M Azid Wahyudi

02/07/2023

06:02 PM TUGU PRATAMA INDONESIA (TPI) 1.00 hour (Feature #1991 (Closed): [HR-EMPLOYEE MOVEMENT] Menu employee movement tidak bisa mengambil generateid berdasarkan tipe employee type)
[HR-EMPLOYEE MOVEMENT] Menu employee movement tidak bisa mengambil generateid berdasarkan tipe employee type M Azid Wahyudi
04:12 PM BANK WOORI SAUDARA 1.50 hour (Bug #1992 (Closed): [ESS-Leave] Tombol Action (Create))
[ESS-Leave] Tombol Action (Create) M Azid Wahyudi
04:05 PM MINOVAES - PRODUCT 1.00 hour (Feature #1762 (Closed): List Get Data "My Staff" BI Dashboard - Medical Plafond)
Testing Fiona Avangeline Jonathan
03:58 PM MINOVAES - PRODUCT 1.00 hour (Feature #1757 (Closed): List Get Data "My Staff" BI Dashboard - Job Description)
Testing Fiona Avangeline Jonathan
03:36 PM MINOVAES - PRODUCT 1.00 hour (Feature #1757 (Closed): List Get Data "My Staff" BI Dashboard - Job Description)
shofwan shiddiq
03:37 PM MINOVAES - PRODUCT 2.00 hours (Feature #1764 (Closed): List Get Data "My Staff" BI Dashboard - Medical Claim History)
Bikin tabel tampungan Fiona Avangeline Jonathan
02:16 PM MINOVAES - PRODUCT 1.00 hour (Feature #1766 (Closed): List Get Data "My Staff" BI Dashboard - Transport)
Testing Fiona Avangeline Jonathan
01:38 PM MINOVAES - PRODUCT 1.00 hour (Feature #1766 (Closed): List Get Data "My Staff" BI Dashboard - Transport)
shofwan shiddiq
02:12 PM MINOVAES - PRODUCT 1.00 hour (Feature #1765 (Closed): List Get Data "My Staff" BI Dashboard - Recent Travel)
Testing Fiona Avangeline Jonathan
11:49 AM MINOVAES - PRODUCT 1.00 hour (Feature #1765 (Closed): List Get Data "My Staff" BI Dashboard - Recent Travel)
shofwan shiddiq
01:52 PM BANK WOORI SAUDARA 1.50 hour (Bug #1957 (Closed): Delete Request ID)
Delete Request ID M Azid Wahyudi
01:50 PM BANK WOORI SAUDARA 4.50 hours (Bug #1936 (Closed): [HR-Recruitment Management] Applicant Master Data - Personal Statement)
[HR-Recruitment Management] Applicant Master Data - Personal Statement M Azid Wahyudi
11:30 AM MINOVAES - PRODUCT 1.00 hour (Feature #1760 (Closed): List Get Data "My Staff" BI Dashboard - Assignment History)
Testing Fiona Avangeline Jonathan
11:09 AM MINOVAES - PRODUCT 1.00 hour (Feature #1770 (Closed): List Get Data "My Staff" BI Dashboard - Secondary Job)
Testing Fiona Avangeline Jonathan
10:29 AM MINOVAES - PRODUCT 1.00 hour (Feature #1770 (Closed): List Get Data "My Staff" BI Dashboard - Secondary Job)
shofwan shiddiq

02/06/2023

05:50 PM MINOVAES - PRODUCT 1.00 hour (Feature #1757 (Closed): List Get Data "My Staff" BI Dashboard - Job Description)
Testing Fiona Avangeline Jonathan
05:40 PM MINOVAES - PRODUCT 1.00 hour (Feature #1762 (Closed): List Get Data "My Staff" BI Dashboard - Medical Plafond)
Testing Fiona Avangeline Jonathan
05:30 PM MINOVAES - PRODUCT 1.00 hour (Feature #1762 (Closed): List Get Data "My Staff" BI Dashboard - Medical Plafond)
shofwan shiddiq
05:15 PM MINOVAES - PRODUCT 1.00 hour (Feature #1737 (Closed): List Get Data "My Staff" BI Dashboard - Employment)
Testing Fiona Avangeline Jonathan
12:41 PM MINOVAES - PRODUCT 1.00 hour (Feature #1737 (Closed): List Get Data "My Staff" BI Dashboard - Employment)
shofwan shiddiq
04:57 PM BBG Bugs 1.00 hour (Project: BBG Bugs)
deploy terkait workflow travel perubahan dari omrecap ke organisasi level (deftTask,custparam,functionSql) M Azid Wahyudi
04:54 PM BBG Bugs 6.00 hours (Bug #1975 (Closed): [HR-Medical Claim] input claim medical pada saat memilih proses pembayaran terjadi error hiring date)
[HR-Medical Claim] input claim medical pada saat memilih proses pembayaran terjadi error hiring date M Azid Wahyudi
03:37 PM MINOVAES - PRODUCT 1.00 hour (Feature #1753 (Closed): List Get Data "My Staff" BI Dashboard - Facilities)
Testing Fiona Avangeline Jonathan
03:18 PM MINOVAES - PRODUCT 1.00 hour (Feature #1753 (Closed): List Get Data "My Staff" BI Dashboard - Facilities)
shofwan shiddiq
03:28 PM BBG Bugs 2.00 hours (Project: BBG Bugs)
Deploy setting-an Fiona Avangeline Jonathan
02:55 PM MINOVAES - PRODUCT 1.00 hour (Feature #1756 (Closed): List Get Data "My Staff" BI Dashboard - Risk Profile)
Testing Fiona Avangeline Jonathan
02:31 PM MINOVAES - PRODUCT 1.00 hour (Feature #1742 (Closed): List Get Data "My Staff" BI Dashboard - Payroll Basic Data)
Testing Fiona Avangeline Jonathan
02:08 PM ROHTO BUGS 1.00 hour (Bug #1987 (QA Test): [HR - Employee Reminder] Notes Tidak Tampil di Report )
shofwan shiddiq

02/03/2023

06:03 PM MINOVAES - PRODUCT 6.00 hours (Project: MINOVAES - PRODUCT)
Fiona Avangeline Jonathan
05:07 PM BANK WOORI SAUDARA 1.50 hour (Bug #1982 (Closed): [ESS-HR] Education)
[ESS-HR] Education M Azid Wahyudi
04:40 PM BANK WOORI SAUDARA 1.50 hour (Project: BANK WOORI SAUDARA)
membantu fungsional mengecek yang tidak jalan M Azid Wahyudi
04:40 PM Bank Mega Syariah Existing 1.50 hour (Project: Bank Mega Syariah Existing)
lanjut ngecek dll untuk kebutuhan run attach tidak bisa download M Azid Wahyudi
04:38 PM Bank Mega Syariah Existing 1.50 hour (Project: Bank Mega Syariah Existing)
lanjut ngecek dll untuk kebutuhan run attach tidak bisa download M Azid Wahyudi
04:36 PM PERTALIFE 4.00 hours (Project: PERTALIFE)
bikin Custom report pms monitoring M Azid Wahyudi
04:22 PM PERTALIFE 3.50 hours (Bug #1968 (QA Test): [PMS Report] Custom Performance Report Monitoring)
[PMS Report] Custom Performance Report Monitoring M Azid Wahyudi
04:17 PM Bank Mega Syariah Existing 1.50 hour (Bug #1976 (Closed): [ESS-PMS FINAL]attachment tidak bisa di download di ess)
[ESS-PMS FINAL]attachment tidak bisa di download di ess M Azid Wahyudi
04:12 PM BANK WOORI SAUDARA 1.50 hour (Bug #1977 (Closed): [ESS-Leave] Form current quota & Next quota tidak menampilkan hasil dari qouta yang diambil)
[ESS-Leave] Form current quota & Next quota tidak menampilkan hasil dari qouta yang diambil M Azid Wahyudi
03:47 PM BANK WOORI SAUDARA 1.50 hour (Bug #1980 (Closed): [ESS-OverTime] Falidasi)
[ESS-OverTime] Validasi M Azid Wahyudi
11:31 AM PT ARITA 1.00 hour (Bug #1725 (Closed): [Performance Management] - Performance Appraisal - Lookup tidak muncul saat di klik)
Testing Fiona Avangeline Jonathan
10:38 AM BANK KALTENG 1.00 hour (Bug #1978 (Closed): [Report Time Management] Logo Bank Kalteng Kepotong dan Tidak Berwarna di Hasil Export PDF)
shofwan shiddiq
09:49 AM BANK KALTENG 1.00 hour (Bug #1979 (Closed): [Report] Tambahkan Pilihan Excel saat Export)
shofwan shiddiq
09:42 AM PT ARITA 1.00 hour (Bug #1712 (Closed): [Performance Management] - Performance Appraisal - Lookup Filter tidak berfungsi)
Testing Fiona Avangeline Jonathan
09:31 AM PERTALIFE 1.00 hour (Bug #1981 (QA Test): [PMS Report] Penambahan Kolom untuk Menampilkan Nilai Final Kinerja)
shofwan shiddiq

02/02/2023

05:15 PM MINOVAES - PRODUCT 1.00 hour (Feature #1742 (Closed): List Get Data "My Staff" BI Dashboard - Payroll Basic Data)
Fiona Avangeline Jonathan
05:15 PM MINOVAES - PRODUCT 1.00 hour (Feature #1745 (Closed): List Get Data "My Staff" BI Dashboard - Regular Income)
Fiona Avangeline Jonathan
03:56 PM PT ARITA 1.00 hour (Support #1713 (Closed): [Performance Management] - Performance Appraisal - Penilai)
Testing Fiona Avangeline Jonathan
03:51 PM PT ARITA 1.00 hour (Feature #1710 (Closed): [Performance Management] - Performance Appraisal (Qualification) - Ketentuan untuk membaca Appraisal Catalog dan Job Catalog)
Testing Fiona Avangeline Jonathan
03:46 PM PT ARITA 1.00 hour (Feature #1711 (Closed): [Performance Management] - Performance Appraisal (KPI) - Ketentuan untuk membaca Appraisal Catalog dan Job Catalog)
Testing Fiona Avangeline Jonathan
11:55 AM Bank Mega Syariah Existing 2.00 hours (Project: Bank Mega Syariah Existing)
mengecek issue attachment pada modul pms M Azid Wahyudi
11:39 AM MINOVAES - PRODUCT 2.00 hours (Feature #1744 (Closed): List Get Data "My Staff" BI Dashboard - Benefits)
Setting an GENPARAM dan Contoh data Fiona Avangeline Jonathan
10:27 AM MINOVAES - PRODUCT 1.00 hour (Feature #1747 (Developing): List Get Data "My Staff" BI Dashboard - Match Up)
Penambahan data Fiona Avangeline Jonathan

02/01/2023

05:58 PM Minova ERP Internal 1.00 hour (Project: Minova ERP Internal)
Outing Fiona Avangeline Jonathan
04:13 PM BBG Bugs 7.00 hours (Bug #1969 (Closed): [ESS] Perubahan Validasi dalam Proses Approval ESS)
[ESS] Perubahan Approval sebelumnya menggunakan OMRECAP menjadi OM LEVEL dan perbaikan workflow M Azid Wahyudi
11:46 AM BBG 5.00 hours (Project: BBG)
ESS Travel Fiona Avangeline Jonathan
10:59 AM Asuransi Bintang - Existing 2.00 hours (Project: Asuransi Bintang - Existing)
Training Fiona Avangeline Jonathan
09:22 AM ROHTO BUGS 1.00 hour (Bug #1971 (QA Test): [HR - Travel Report] Report Travel All tidak Tampil)
shofwan shiddiq
 

Also available in: Atom