Activity
From 08/05/2022 to 09/03/2022
09/02/2022
- 07:27 PM MINOVA DEMO 4.00 hours (Feature #1521 (Closed): [ERP Demo] Report Purchasing)
- 06:05 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 05:59 PM PERTALIFE 1.00 hour (Project: PERTALIFE)
- Testing task PMS mengenai paralel approval
- 05:59 PM BANK WOORI SAUDARA 2.00 hours (Project: BANK WOORI SAUDARA)
- Testing phase 1
- 05:56 PM KJL 5.00 hours (Project: KJL )
- FRD KJL
- 05:53 PM ROHTO BUGS 3.00 hours (Project: ROHTO BUGS)
- ESS PMS
- 05:52 PM MINOVA DEMO 5.00 hours (Project: MINOVA DEMO)
- ERP
- 03:09 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance, Corp Affairs
- 11:11 AM Minova ERP Internal 3.00 hours (Feature #1420 (Assigned): [ERP Internal] Report Sales)
09/01/2022
- 06:39 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 05:15 PM Bank Kalteng (Phase 2) 4.00 hours (Project: Bank Kalteng (Phase 2))
- Mapping KPI Catalog
- 04:22 PM MINOVA DEMO 4.00 hours (Project: MINOVA DEMO)
- ERP
- 02:06 PM Bank Kalteng (Phase 2) 4.00 hours (Project: Bank Kalteng (Phase 2))
- Testing after bug fixing
- 02:05 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Testing after Migration
- 02:05 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Testing after Migration
- 02:04 PM PERTALIFE 4.00 hours (Project: PERTALIFE)
- Setting PMS Pertalife
- 02:03 PM Bank Kalteng (Phase 2) 4.00 hours (Project: Bank Kalteng (Phase 2))
- Testing Phase 2
- 02:01 PM KJL 4.00 hours (Project: KJL )
- FRD KJL
- 02:00 PM PERTALIFE 4.00 hours (Project: PERTALIFE)
- Setting PMS Pertalife
- 01:59 PM Bank Kalteng (Phase 2) 4.00 hours (Project: Bank Kalteng (Phase 2))
- Testing PMS
- 11:36 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 11:04 AM Bank Kalteng (Phase 2) 5.00 hours (Project: Bank Kalteng (Phase 2))
- Phase 2 BKT
- 10:02 AM Bank Kalteng (Phase 2) 4.00 hours (Project: Bank Kalteng (Phase 2))
- Support Go Live
- 10:00 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance, Corp Affairs
08/31/2022
- 05:38 PM MINOVA DEMO 4.00 hours (Feature #1521 (Closed): [ERP Demo] Report Purchasing)
- Purchase Document Detail
- 05:10 PM ROHTO BUGS 1.00 hour (Project: ROHTO BUGS)
- ESS PMS
- 05:10 PM Bank Kalteng (Phase 2) 7.00 hours (Project: Bank Kalteng (Phase 2))
- Support Go Live
- 02:02 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- 09:35 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance, Corp Affairs
- 09:04 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
08/30/2022
- 06:08 PM PERTALIFE 4.00 hours (Project: PERTALIFE)
- 06:08 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
- 05:53 PM PT BIA 2.00 hours (Project: PT BIA)
- Mapping data employee
- 05:53 PM PT BIA 8.00 hours (Project: PT BIA)
- Mapping data employee
- 05:52 PM KJL 6.00 hours (Project: KJL )
- KJL
- 05:51 PM KJL 8.00 hours (Project: KJL )
- KJL
- 05:51 PM KJL 8.00 hours (Project: KJL )
- KJL
- 05:50 PM BANK WOORI SAUDARA 8.00 hours (Project: BANK WOORI SAUDARA)
- BWS
- 05:35 PM PT BIA 8.00 hours (Project: PT BIA)
- Mapping data excel Payroll & Transaksi
- 04:28 PM MINOVA DEMO 7.00 hours (Feature #1524 (Closed): [ERP Demo] Report Vendor)
- 04:25 PM PT BIA 8.00 hours (Project: PT BIA)
- Mapping data excel Personal Data
- 04:25 PM Minova ERP Internal 1.50 hour (Bug #1525 (Closed): [ERP Internal] Discount Amount Belum Stabil Pada Document Sales)
- Testing Bug #1525
- 04:23 PM Minova ERP Internal 1.00 hour (Bug #1533 (Closed): [ERP Internal] Sales Doc - keyword search type pada tabel item)
- Testing Bug #1533
- 03:54 PM Minova ERP Internal 3.00 hours (Bug #1533 (Closed): [ERP Internal] Sales Doc - keyword search type pada tabel item)
- Fixing Combo Box Service Sales
- 02:38 PM ROHTO BUGS 3.00 hours (Project: ROHTO BUGS)
- ESS PMS
- 10:40 AM MINOVA DEMO 5.00 hours (Project: MINOVA DEMO)
- ERP
- 09:27 AM Minova Corp Affairs 10.00 hours (Project: Minova Corp Affairs)
- Finance, Corp Affairs
08/29/2022
- 07:09 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 05:46 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
- 05:45 PM Minova Corp Affairs 5.00 hours (Project: Minova Corp Affairs)
- Admin
- 05:45 PM PERTALIFE 4.00 hours (Project: PERTALIFE)
- 05:45 PM Minova Corp Affairs 3.00 hours (Project: Minova Corp Affairs)
- Meeting ERP Logistic - Skenario KJL Plastic Indonesia
- 05:43 PM Minova Corp Affairs 5.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 05:43 PM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
- Marcom - Sosial Media
- 05:42 PM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
- Marcom - Direct messages LinkedIn
- 05:41 PM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
- Finance
- 05:40 PM MINOVA DEMO 2.00 hours (Project: MINOVA DEMO)
- Testing Aplikasi ERP Modul Production - Port Demo 61124
- 05:40 PM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
- Marcom - Sosial Media
- 05:35 PM Minova ERP Internal 1.00 hour (Project: Minova ERP Internal)
- Setting Aplikasi ERP Internal
- 05:35 PM Minova ERP Internal 3.00 hours (Project: Minova ERP Internal)
- Closing ulang periode Jan - Juli 2022
- 05:34 PM Minova Corp Affairs 3.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 05:11 PM ROHTO BUGS 3.00 hours (Project: ROHTO BUGS)
- ESS PMS
- 04:54 PM MINOVA DEMO 4.00 hours (Project: MINOVA DEMO)
- Minova Demo Vendor Recap
- 04:53 PM MINOVA DEMO 4.00 hours (Project: MINOVA DEMO)
- Minova Demo Vendor Detail
- 04:15 PM MINOVA DEMO 3.50 hours (Bug #1531 (Closed): [Production] - Error saving)
- Fixing Save Production Order
- 03:59 PM HINO 2.00 hours (Project: HINO)
- Fixing ERP Demo
- 03:58 PM Minova ERP Internal 3.00 hours (Project: Minova ERP Internal)
- Meeting Koordinasi
- 11:29 AM Bank Kalteng (Phase 2) 1.00 hour (Project: Bank Kalteng (Phase 2))
- Testing
- 09:50 AM MINOVA DEMO 4.00 hours (Project: MINOVA DEMO)
- Testing, Report
- 09:13 AM Minova Corp Affairs 10.00 hours (Project: Minova Corp Affairs)
- Finance, Corp Affairs
- 07:04 AM Bank Kalteng (Phase 2) 4.00 hours (Support #1442 (Closed): [Travel Management] - New Report Pindah Buku)
- [Travel Management] - New Report Pindah Buku
08/26/2022
- 05:42 PM ROHTO BUGS 3.00 hours (Project: ROHTO BUGS)
- ESS PMS
- 05:32 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 04:07 PM Bank Kalteng (Phase 2) 1.00 hour (Project: Bank Kalteng (Phase 2))
- Data Testing
- 03:34 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- 03:11 PM MINOVA DEMO 3.50 hours (Bug #1519 (Closed): [Inventory - GICU] Tombol SAVE belum jalan. )
- Fixing Save GICU
- 02:11 PM MINOVA DEMO 2.00 hours (Project: MINOVA DEMO)
- ERP
- 01:54 PM MINOVAES - PRODUCT 2.00 hours (Project: MINOVAES - PRODUCT)
- Design Widget Absensi
- 11:34 AM ARITA Bugs 3.00 hours (Bug #1522 (Closed): [ARITA - PAYROLL] Perhitungan Subsidi Pajak dan Potongan Pajak)
- Fixing Payroll Pajak Arita
- 11:30 AM MINOVA DEMO 2.50 hours (Bug #1518 (Closed): [Sales] Tombol SAVE belum jalan. )
- Fixing Save Sales Approval
- 11:26 AM Minova ERP Internal 2.50 hours (Bug #1525 (Closed): [ERP Internal] Discount Amount Belum Stabil Pada Document Sales)
- Fixing Discount SalesItems
- 10:25 AM MINOVA DEMO 4.00 hours (Project: MINOVA DEMO)
- ERP
- 09:51 AM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
- 09:51 AM PERTALIFE 4.00 hours (Project: PERTALIFE)
- 09:50 AM TUGU PRATAMA INDONESIA (TPI) 3.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- TPI
- 09:49 AM MINOVAES - PRODUCT 5.00 hours (Project: MINOVAES - PRODUCT)
- Visit Client Wika
- 09:00 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 08:58 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance, Corp Affairs
08/25/2022
- 04:47 PM Bank Kalteng (Phase 2) 3.00 hours (Bug #1511 (Closed): [ESS Leave] Perhitungan Curent Quota dan Next Quota masih salah)
- [ESS Leave] Perhitungan Curent Quota dan Next Quota masih salah
- 02:37 PM Bank Kalteng (Phase 2) 4.00 hours (Project: Bank Kalteng (Phase 2))
- Travel Report
- 11:16 AM Bank Kalteng (Phase 2) 1.00 hour (Feature #1504 (Closed): [Offering Letter] Offering Letter Tenaga Kontrak Non Administrasi)
- QA Test [Offering Letter] Offering Letter Tenaga Kontrak Non Administrasi User * << me >>
- 11:12 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 11:10 AM TUGU PRATAMA INDONESIA (TPI) 2.50 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Fixing Generate User With Email
- 11:08 AM HINO Bugs 8.00 hours (Feature #1499 (Closed): Perhitungan Payroll untuk Overtime dengan menggunakan wt from overtime duration.)
- Fixing Payroll Custom Gen WT From Overtime
- 11:05 AM Bank Kalteng (Phase 2) 1.00 hour (Feature #1503 (Closed): [Offering Letter] Offering Letter Tenaga Kontrak Administrasi)
- QA Test [Offering Letter] Offering Letter Tenaga Kontrak Administrasi
- 11:05 AM Bank Kalteng (Phase 2) 2.00 hours (Bug #1480 (Closed): [Report PMS])
- Revisi Report PMS
- 11:00 AM Bank Kalteng (Phase 2) 1.00 hour (Feature #1502 (Closed): [Offering Letter] Offering Letter Trainee (ODP))
- QA Test [Offering Letter] Offering Letter Trainee (ODP)
- 10:53 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 10:44 AM Bank Kalteng (Phase 2) 5.00 hours (Support #1442 (Closed): [Travel Management] - New Report Pindah Buku)
- [Travel Management] - New Report Pindah Buku
- 10:43 AM Bank Kalteng (Phase 2) 1.00 hour (Feature #1501 (Closed): [Offering Letter] Custom Offering Letter Pro Hire)
- QA Test [Offering Letter] Custom Offering Letter Pro Hire
- 09:54 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 08:56 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Cek Audit 2020, Update cashplan, Lanjut Cek Report Audit 2021
08/24/2022
- 05:17 PM BANK WOORI SAUDARA 1.00 hour (Project: BANK WOORI SAUDARA)
- BWS
- 05:17 PM KJL 7.00 hours (Project: KJL )
- Mapping data employee
- 05:16 PM KJL 8.00 hours (Project: KJL )
- Visit KJL
- 05:16 PM BANK WOORI SAUDARA 8.00 hours (Project: BANK WOORI SAUDARA)
- BWS
- 04:10 PM Bank Kalteng (Phase 2) 1.30 hour (Support #1478 (Closed): [ESS Travel] - Task Mail)
- [ESS Travel] - Task Mail
- 03:42 PM MINOVA DEMO 3.00 hours (Project: MINOVA DEMO)
- Kebutuhan demo
- 02:34 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS Catetan UAT
- 02:34 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS Catetan UAT
- 02:33 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS Catetan UAT
- 02:32 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- visit ke BMS untuk deploy dan UAT ke 2 phase 2 ( Pakai motor sendiri & Tanpa Pak Yono )
- 02:31 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS Catetan UAT
- 02:31 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 02:30 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Visit Client UAT Phase 2
- 02:30 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Visit Client UAT Phase 2
- 02:29 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Visit Client UAT Phase 2
- 02:29 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- visit ke BMS untuk deploy dan UAT ke 2 phase 2 ( Pakai motor sendiri & Tanpa Pak Yono )
- 02:29 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Visit Client BMS
- 02:28 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Visit Client BMS Tanpa pak yono, naik kendaraan pribadi
- 02:27 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Visit Client BMS Tanpa pak yono, naik kendaraan pribadi
- 02:27 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 02:26 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 01:44 PM Bank Kalteng (Phase 2) 3.00 hours (Project: Bank Kalteng (Phase 2))
- Testing
- 01:43 PM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
- Diskusi ERP & Scrum
- 09:59 AM HINO Bugs 8.00 hours (Feature #1499 (Closed): Perhitungan Payroll untuk Overtime dengan menggunakan wt from overtime duration.)
- Fixing Payroll Custom Gen WT From Overtime
- 09:58 AM HINO Bugs 8.00 hours (Feature #1499 (Closed): Perhitungan Payroll untuk Overtime dengan menggunakan wt from overtime duration.)
- Fixing Payroll Custom Gen WT From Overtime
- 09:56 AM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
- Sharing ERP
- 09:15 AM Bank Kalteng (Phase 2) 4.00 hours (Feature #1504 (Closed): [Offering Letter] Offering Letter Tenaga Kontrak Non Administrasi)
- [Offering Letter] Offering Letter Tenaga Kontrak Non Administrasi
- 09:13 AM Bank Kalteng (Phase 2) 3.00 hours (Feature #1503 (Closed): [Offering Letter] Offering Letter Tenaga Kontrak Administrasi)
- [Offering Letter] Offering Letter Tenaga Kontrak Administrasi
- 09:05 AM Bank Kalteng (Phase 2) 1.00 hour (Feature #1501 (Closed): [Offering Letter] Custom Offering Letter Pro Hire)
- [Offering Letter] Custom Offering Letter Pro Hire
- 08:56 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance, Corp Affairs
- 08:52 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
08/23/2022
- 06:03 PM Bank Kalteng (Phase 2) 1.00 hour (Support #1444 (Closed): [Medical] - New Report Pindah Buku)
- [Medical] - New Report Pindah Buku
- 04:13 PM Bank Kalteng (Phase 2) 5.00 hours (Support #1444 (Closed): [Medical] - New Report Pindah Buku)
- [Medical] - New Report Pindah Buku
- 05:59 PM Bank Kalteng (Phase 2) 4.00 hours (Project: Bank Kalteng (Phase 2))
- [BKT] Offering Letter Tenaga Kontrak Administrasi & Non Administrasi
- 05:57 PM Bank Kalteng (Phase 2) 4.00 hours (Project: Bank Kalteng (Phase 2))
- [Minova Product] Report Employee Profile & Talent
- 05:38 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
- Testing ERP
- 05:35 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance, Corp Affairs
- 05:33 PM Bank Kalteng (Phase 2) 1.00 hour (Support #1443 (Closed): [Travel Management] - New Report SPPD)
- [Travel Management] - New Report SPPD
- 10:42 AM Bank Kalteng (Phase 2) 1.00 hour (Feature #1501 (Closed): [Offering Letter] Custom Offering Letter Pro Hire)
- [Offering Letter] Custom Offering Letter Pro Hire
08/22/2022
- 06:59 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 05:55 PM PERTALIFE 4.00 hours (Project: PERTALIFE)
- Setting ESS PMS
- 05:54 PM PERTALIFE 8.00 hours (Project: PERTALIFE)
- Setting PMS di project Pertalife
- 05:52 PM Bank Kalteng (Phase 2) 4.00 hours (Project: Bank Kalteng (Phase 2))
- Monitoring redmine, merapihkan settingan selection report phase 2
- 05:51 PM PERTALIFE 4.00 hours (Project: PERTALIFE)
- Setting parameter untuk ESS PMS Pertalife
- 05:50 PM Bank Kalteng (Phase 2) 2.00 hours (Project: Bank Kalteng (Phase 2))
- Testing dan Setting BKT Phase 2
- 05:50 PM Bank Kalteng (Phase 2) 2.00 hours (Project: Bank Kalteng (Phase 2))
- Meeting dengan BKT mengenai persiapan Go Live phase 1 dan 2
- 05:47 PM Bank Kalteng (Phase 2) 6.00 hours (Support #1443 (Closed): [Travel Management] - New Report SPPD)
- [Travel Management] - New Report SPPD
- 04:57 PM MINOVA DEMO 2.00 hours (Project: MINOVA DEMO)
- Talent Management
- 04:14 PM Minova ERP Internal 1.00 hour (Project: Minova ERP Internal)
- Diskusi ERP
- 04:09 PM Bank Kalteng (Phase 2) 3.00 hours (Feature #1503 (Closed): [Offering Letter] Offering Letter Tenaga Kontrak Administrasi)
- [Offering Letter] Offering Letter Tenaga Kontrak Administrasi
- 04:08 PM Bank Kalteng (Phase 2) 3.00 hours (Feature #1503 (Closed): [Offering Letter] Offering Letter Tenaga Kontrak Administrasi)
- [Offering Letter] Offering Letter Tenaga Kontrak Administrasi
- 03:30 PM Bank Kalteng (Phase 2) 3.00 hours (Feature #1503 (Closed): [Offering Letter] Offering Letter Tenaga Kontrak Administrasi)
- [Offering Letter] Offering Letter Tenaga Kontrak Administrasi
- 04:07 PM Bank Kalteng (Phase 2) 3.00 hours (Feature #1504 (Closed): [Offering Letter] Offering Letter Tenaga Kontrak Non Administrasi)
- [Offering Letter] Offering Letter Tenaga Kontrak Non Administrasi
- 03:32 PM Bank Kalteng (Phase 2) 3.00 hours (Feature #1504 (Closed): [Offering Letter] Offering Letter Tenaga Kontrak Non Administrasi)
- [Offering Letter] Offering Letter Tenaga Kontrak Non Administrasi
- 03:43 PM Bank Kalteng (Phase 2) 4.00 hours (Feature #1501 (Closed): [Offering Letter] Custom Offering Letter Pro Hire)
- [Offering Letter] Custom Offering Letter Pro Hire
- 03:42 PM Bank Kalteng (Phase 2) 2.00 hours (Feature #1502 (Closed): [Offering Letter] Offering Letter Trainee (ODP))
- [Offering Letter] Offering Letter Trainee (ODP)
- 02:38 PM PT AMARTHA MICRO FINTEK BUGS 3.00 hours (Bug #1426 (Closed): Employee Movement halaman page nya berantakan jika akan men generate employee.)
- Fixing ExternalID Amartha
- 02:37 PM HINO Bugs 3.00 hours (Feature #1499 (Closed): Perhitungan Payroll untuk Overtime dengan menggunakan wt from overtime duration.)
- Fixing Payroll Custom Gen WT From Overtime
- 02:35 PM HINO Bugs 3.00 hours (Feature #1499 (Closed): Perhitungan Payroll untuk Overtime dengan menggunakan wt from overtime duration.)
- Fixing Payroll Custom Gen WT From Overtime
- 01:57 PM Bank Kalteng (Phase 2) 5.00 hours (Project: Bank Kalteng (Phase 2))
- Travel Management & Benefit Administration
- 08:40 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Data PA BKT
- 08:39 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Validasi Data Go lIve
- 08:38 AM Bank Kalteng (Phase 2) 2.00 hours (Project: Bank Kalteng (Phase 2))
- Zoom Persiapan Go lIve BKT
08/19/2022
- 06:03 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 04:40 PM KJL 8.00 hours (Project: KJL )
- Visit KJL
- 02:57 PM Bank Kalteng (Phase 2) 1.00 hour (Project: Bank Kalteng (Phase 2))
- Travel Management
- 02:42 PM MINOVA DEMO 6.00 hours (Project: MINOVA DEMO)
- Talent Management
- 01:32 PM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
- Marcom - Direct messages LinkedIn
- 01:31 PM Minova Corp Affairs 7.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 01:31 PM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
- Marcom - Direct messages LinkedIn
- 01:30 PM Minova Corp Affairs 7.00 hours (Project: Minova Corp Affairs)
- Finance
- 01:29 PM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
- Marcom - Direct messages LinkedIn
- 01:28 PM Minova Corp Affairs 7.00 hours (Project: Minova Corp Affairs)
- Admin
- 11:03 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance, Corp Affairs, Audit
- 09:37 AM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
- Marcom - Direct messages LinkedIn
- 09:31 AM Minova Corp Affairs 5.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 09:29 AM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
- Meeting Karyawan Agustus 2022
- 09:28 AM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
- Marcom - Direct messages LinkedIn
- 09:26 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Admin & GA
- 09:25 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
08/18/2022
- 06:03 PM BANK WOORI SAUDARA 8.00 hours (Project: BANK WOORI SAUDARA)
- BWS
- 05:39 PM ROHTO BUGS 6.00 hours (Bug #1410 (Closed): [ESS - LEAVE]perhitungan quota pada remaining quota dsb tidak menyesuaikan dengan apa yang ada di master data Absence Quota jika melakukan pengajuan kedua kali nya walau kondisi workflow unfinish)
- [ESS - LEAVE]perhitungan quota pada remaining quota dsb tidak menyesuaikan dengan apa yang ada di master data Absence...
- 03:29 PM Bank Kalteng (Phase 2) 7.00 hours (Project: Bank Kalteng (Phase 2))
- Travel Management
- 02:59 PM MINOVA DEMO 1.00 hour (Project: MINOVA DEMO)
- Talent Management
- 02:51 PM MINOVAES - PRODUCT 3.00 hours (Feature #1157 (Closed): [TALENT] Report Talent Action & Report Employee Profile)
- Report Talent Action & Employee Profile
- 02:50 PM MINOVAES - PRODUCT 3.00 hours (Feature #1157 (Closed): [TALENT] Report Talent Action & Report Employee Profile)
- 02:30 PM PT ARITA 5.00 hours (Bug #1495 (Closed): [Arita Bugs] Sytem Administrator - Generate User)
- Fixing Generate User
- 02:22 PM BANK MEGA SYARIAH - ES 8.00 hours (Project: BANK MEGA SYARIAH - ES)
- 02:21 PM BANK MEGA SYARIAH - ES 8.00 hours (Project: BANK MEGA SYARIAH - ES)
- 12:02 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance, Corp Affairs
- 11:35 AM Minova ERP Internal 8.00 hours (Project: Minova ERP Internal)
- Finance, Corp Affairs
- 11:29 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance, Corp Affairs
- 11:28 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance, Corp Affairs
- 11:28 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance, Corp Affairs
- 11:22 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Cek Audit 2020, Update cashplan, Lanjut Cek Report Audit 2021
- 11:21 AM Minova ERP Internal 8.00 hours (Project: Minova ERP Internal)
- Cek Audit 2020, Update cashplan, Lanjut Cek Report Audit 2021
- 11:21 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Cek Audit 2020, Update cashplan, Lanjut Cek Report Audit 2021
- 11:20 AM Minova Corp Affairs 6.00 hours (Project: Minova Corp Affairs)
- Ijin Masuk Siang Imunisasi Anak, Update cashplan, Lanjut Cek Report Audit 2021
- 11:19 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Meeting Karyawan, Finance, Corp Affairs
- 11:18 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Fu Audit 2020, Update cashplan, Update Data Payroll, Lanjut Cek Report Audit 2021
- 11:14 AM Minova Corp Affairs 9.50 hours (Project: Minova Corp Affairs)
- Ke kejaksaan, Corp Affairs, Audit, Meeting Koordinasi
- 11:09 AM Minova Corp Affairs 6.00 hours (Project: Minova Corp Affairs)
- Ijin Masuk Siang Anak Vaksin, Lanjut review draft audit KAP, Finance
08/16/2022
- 06:47 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 05:49 PM MINOVAES - PRODUCT 3.30 hours (Project: MINOVAES - PRODUCT)
- Desain Section Talent Management
- 05:16 PM MINOVAIS SILVER PACKAGE 3.00 hours (Project: MINOVAIS SILVER PACKAGE)
- Testing Report
- 05:15 PM MINOVAIS SILVER PACKAGE 3.00 hours (Project: MINOVAIS SILVER PACKAGE)
- ESS PMS
- 05:15 PM MINOVA DEMO 2.00 hours (Project: MINOVA DEMO)
- Create table
- 04:47 PM MINOVAES - PRODUCT 3.00 hours (Project: MINOVAES - PRODUCT)
- Checking Custom Payroll (PHRPYCUPROD0001)
- 04:46 PM MINOVAES - PRODUCT 2.00 hours (Project: MINOVAES - PRODUCT)
- Checking Custom Payroll (PHRPYCUPROD0001)
- 04:41 PM PT BMS MIGRATION & ENHANCEMENT 5.00 hours (Bug #1489 (Closed): Training Management - Training History)
- Fixing Action Training
- 04:09 PM BANK MEGA SYARIAH - ES 1.00 hour (Bug #1485 (Closed): [ Report PMS ] - Performance Report Monitoring)
- [ Report PMS ] - Performance Report Monitoring
- 03:22 PM BANK WOORI SAUDARA 1.00 hour (Bug #1488 (Closed): [HR-Training Management] Report Training History Employee - Data karyawan tidak tampil & Export dalam bentuk PDF putus-putus )
- [HR-Training Management] Report Training History Employee - Data karyawan tidak tampil & Export dalam bentuk PDF pu...
- 11:52 AM BANK MEGA SYARIAH - ES 2.30 hours (Feature #1486 (Closed): [ ESS Overtime ] - Validasi ESS Overtime)
- [ ESS Overtime ] - Validasi ESS Overtime
- 07:02 AM BANK MEGA SYARIAH - ES 1.00 hour (Feature #1484 (Closed): [ Report PMS ] - Performance Report Individu)
- [ Report PMS ] - Performance Report Individu
- 07:01 AM BANK MEGA SYARIAH - ES 1.00 hour (Feature #1482 (Closed): [ ESS ] Exit Clearance)
- [ ESS ] Exit Clearance
- 07:00 AM BANK WOORI SAUDARA 1.00 hour (Bug #1427 (Closed): Report WageType Recap - Export ke Excel nya tidak ada)
- Report WageType Recap - Export ke Excel nya tidak ada
- 06:59 AM IMFI Bugs 2.30 hours (Support #1450 (Deploy): Report Wage Type Recap lama saat di buka walau hanya 1 employeeid)
- Report Wage Type Recap lama saat di buka walau hanya 1 employeeid
- 06:57 AM Phase 2 1.00 hour (Bug #1419 (Closed): [HR - Training Management] Report Training History Employee Tidak Berfungsi)
- [HR - Training Management] Report Training History Employee Tidak Berfungsi
- 06:56 AM Phase 2 1.00 hour (Bug #1396 (QA Test): [ HR ] - Performance Report per Unit)
- [ HR ] - Performance Report per Unit
- 06:55 AM PERTALIFE 1.00 hour (Bug #1194 (Closed): [Performance Report] Performance Unit)
- [Performance Report] Performance Unit
08/15/2022
- 06:25 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 06:18 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
- Redesign Section HR / Talent Management / Career Plan, Succession Plan, Talent Matchup, Matrix Analysis
- 05:29 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Testing
- 03:22 PM BANK WOORI SAUDARA 3.00 hours (Bug #1447 (Closed): [HR - Talent Management] Employee Review - Dataset Talent Employee Review Performance (KPI))
- Fixing Employee Review KPI
- 03:22 PM Minova ERP Internal 3.00 hours (Project: Minova ERP Internal)
- Meeting Koordinasi
- 03:16 PM BANK WOORI SAUDARA 5.00 hours (Bug #1475 (Closed): E-Learning - Data tidak terfilter )
- Fixing Elearning Overview
- 02:22 PM Bank Kalteng (Phase 2) 1.30 hour (Support #1434 (Closed): [ESS Medical] - Invoice Date)
- [ESS Medical] - Invoice Date
- 12:03 PM Bank Kalteng (Phase 2) 1.00 hour (Support #1438 (Closed): [ESS Medical] - Validation Error)
- [ESS Medical] - Validation Error
- 10:55 AM Bank Aceh 1.30 hour (Feature #1477 (Closed): [CR] Report All Employee - penambahan 2 kolom)
- [CR] Report All Employee - penambahan 2 kolom
- 09:42 AM Bank Kalteng (Phase 2) 8.00 hours (Support #1473 (Closed): [ESS Medical] - Parameter)
- [ESS Medical] - Parameter
- 09:10 AM BANK MEGA SYARIAH - ES 8.00 hours (Project: BANK MEGA SYARIAH - ES)
- 09:09 AM BANK MEGA SYARIAH - ES 8.00 hours (Project: BANK MEGA SYARIAH - ES)
- UAT Phase 2
- 09:09 AM BANK MEGA SYARIAH - ES 8.00 hours (Project: BANK MEGA SYARIAH - ES)
- UAT Phase 2
- 09:08 AM BANK MEGA SYARIAH - ES 8.00 hours (Project: BANK MEGA SYARIAH - ES)
- UAT Phase 2
- 09:07 AM BANK MEGA SYARIAH - ES 8.00 hours (Project: BANK MEGA SYARIAH - ES)
- Visit to Client
- 09:07 AM BANK MEGA SYARIAH - ES 8.00 hours (Project: BANK MEGA SYARIAH - ES)
- 09:06 AM BANK MEGA SYARIAH - ES 8.00 hours (Project: BANK MEGA SYARIAH - ES)
- 09:06 AM BANK MEGA SYARIAH - ES 8.00 hours (Project: BANK MEGA SYARIAH - ES)
08/12/2022
- 07:01 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
- Desain Section Talent Management / Talent Matchup
- 07:00 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 05:42 PM BANK WOORI SAUDARA 8.00 hours (Project: BANK WOORI SAUDARA)
- BWS
- 05:42 PM BANK WOORI SAUDARA 8.00 hours (Project: BANK WOORI SAUDARA)
- BWS
- 05:41 PM BANK WOORI SAUDARA 8.00 hours (Project: BANK WOORI SAUDARA)
- BWS
- 05:41 PM BANK WOORI SAUDARA 8.00 hours (Project: BANK WOORI SAUDARA)
- BWS
- 05:41 PM BANK WOORI SAUDARA 8.00 hours (Project: BANK WOORI SAUDARA)
- BWS
- 04:59 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Travel & ESS Medical
- 02:38 PM PT BIA 8.00 hours (Feature #1457 (Closed): Format Employee ID)
- Create Generate EmployeeID BIA
- 02:38 PM PT BIA 3.00 hours (Feature #1457 (Closed): Format Employee ID)
- Create Generate EmployeeID BIA
- 02:24 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
- Desain Section Talent Management / Employee Review
- 09:45 AM Bank Kalteng (Phase 2) 8.00 hours (Support #1451 (Closed): [ESS Travel] - Parameter)
- [ESS Travel] - Parameter
08/11/2022
- 06:22 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 05:27 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Travel
- 03:56 PM PERTALIFE 8.00 hours (Project: PERTALIFE)
- Setting parameter untuk PMS Pertalife
- 03:49 PM PERTALIFE 4.00 hours (Project: PERTALIFE)
- Setting parameter untuk PMS Pertalife
- 03:49 PM PERTALIFE 8.00 hours (Project: PERTALIFE)
- Setting parameter untuk PMS Pertalife
- 03:46 PM BANK FAMA 3.00 hours (Project: BANK FAMA)
- Debug, Checking Pajak Kematian FAMA / ES
- 03:38 PM IMFI Bugs 8.00 hours (Bug #720 (Deploy): [HR-PAYROLL] Perhitungan Pajak untuk Skenario Employee Meninggal)
- Debug, Checking Pajak Kematian IMFI
- 03:32 PM IMFI Bugs 8.00 hours (Bug #720 (Deploy): [HR-PAYROLL] Perhitungan Pajak untuk Skenario Employee Meninggal)
- Debug, Checking Pajak Kematian IMFI
- 03:26 PM IMFI Bugs 5.00 hours (Bug #720 (Deploy): [HR-PAYROLL] Perhitungan Pajak untuk Skenario Employee Meninggal)
- Debug, Checking Pajak Kematian IMFI
- 03:36 PM MINOVA DEMO 8.00 hours (Support #1452 (QA Test): [ERP] Report Tracking)
- Fixing Report Process Tracking
- 03:19 PM MINOVA DEMO 5.00 hours (Support #1452 (QA Test): [ERP] Report Tracking)
- Fixing Report Process Tracking
- 03:16 PM MINOVA DEMO 8.00 hours (Support #1452 (QA Test): [ERP] Report Tracking)
- Fixing Report Process Tracking
- 03:16 PM MINOVA DEMO 3.00 hours (Support #1452 (QA Test): [ERP] Report Tracking)
- Fixing Report Process Tracking
- 03:28 PM BANK FAMA 8.00 hours (Project: BANK FAMA)
- Debug, Checking Pajak Kematian FAMA / ES
- 03:23 PM Bank Kalteng (Phase 2) 5.00 hours (Bug #1441 (Closed): [Budgeting] - Budget Calculation Parameter)
- Fixing Save Budget Cal Param
- 03:18 PM Minova ERP Internal 3.00 hours (Project: Minova ERP Internal)
- Meeting Karyawan
- 10:43 AM Minova Corp Affairs 0.50 hour (Project: Minova Corp Affairs)
- Marcom - Direct messages LinkedIn
- 10:40 AM Minova ERP Internal 4.00 hours (Project: Minova ERP Internal)
- Closing Periode Juli 2022
- 10:40 AM Minova Corp Affairs 3.50 hours (Project: Minova Corp Affairs)
- GA & HR
- 10:39 AM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
- Input Transaksi Petty Cash Ops ke ERP Internal
- 10:39 AM Minova Corp Affairs 6.00 hours (Project: Minova Corp Affairs)
- HR & Admin
- 10:38 AM Minova ERP Internal 6.00 hours (Project: Minova ERP Internal)
- Input Transaksi Bank periode Juli 2022 ke ERP Internal
- 10:37 AM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
- GA
- 10:37 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & GA
- 10:30 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 10:29 AM Minova ERP Internal 1.00 hour (Project: Minova ERP Internal)
- Input AR periode Juli 2022 ke ERP Internal
- 10:28 AM Minova ERP Internal 6.50 hours (Project: Minova ERP Internal)
- ERP Internal - Modul Sales
- 10:27 AM Minova Corp Affairs 0.50 hour (Project: Minova Corp Affairs)
- Marcom - Direct messages LinkedIn
- 10:26 AM Minova ERP Internal 7.00 hours (Project: Minova ERP Internal)
- ERP Internal - Modul Sales
- 10:25 AM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
- Marcom - Direct messages LinkedIn
- 10:24 AM Minova Corp Affairs 6.50 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 10:23 AM Minova Corp Affairs 1.50 hour (Project: Minova Corp Affairs)
- Marcom - Direct messages LinkedIn
- 10:21 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Admin, GA & HR
- 10:20 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Admin & GA
- 10:20 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 10:19 AM MINOVA DEMO 2.00 hours (Project: MINOVA DEMO)
- Setting Data PR dan PO for Demo PT Wijaya Karya Gedung
- 10:19 AM Minova Corp Affairs 7.00 hours (Project: Minova Corp Affairs)
- ERP Internal - Closing Periode Juni 2022
- 10:18 AM MINOVA DEMO 4.00 hours (Project: MINOVA DEMO)
- Desain report BAST dan Structure Data E-BAST untuk Demo PT Wijaya Karya Gedung
- 10:17 AM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
- Revisi Data Structure Purchase untuk Demo PT Wijaya Karya Gedung
- 10:17 AM MINOVA DEMO 7.50 hours (Project: MINOVA DEMO)
- Create Data Structure Purcahse untuk Demo PT Wijaya Karya Gedung
- 10:16 AM Minova Corp Affairs 0.50 hour (Project: Minova Corp Affairs)
- Finance - Create Kwitansi Ir Ichlas Hasbi
- 10:16 AM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
- Prospect PT Wijaya Karya Gedung
08/10/2022
- 06:46 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
- Desain Section Talent Management / Employee Review
- 06:01 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 05:13 PM Bank Kalteng (Phase 2) 6.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Travel & ESS Medical
- 05:12 PM MINOVA DEMO 2.00 hours (Project: MINOVA DEMO)
- ESS PMS
08/09/2022
- 06:51 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 05:22 PM Bank Kalteng (Phase 2) 1.00 hour (Bug #1462 (Closed): [Recruitment Report] Picture pada Report Applicant CV tidak tampil)
- [Recruitment Report] Picture pada Report Applicant CV tidak tampil
- 04:09 PM Bank Kalteng (Phase 2) 1.00 hour (Feature #1463 (Closed): [HR Strategic - Performance History] Penambahan filter per Divisi (Cost Center))
- [HR Strategic - Performance History] Penambahan filter per Divisi (Cost Center)
- 03:28 PM Bank Kalteng (Phase 2) 1.00 hour (Support #1429 (Closed): [Report Travel] - Export report kepotong)
- [Report Travel] - Export report kepotong
- 03:26 PM MINOVA DEMO 4.00 hours (Project: MINOVA DEMO)
- ESS PMS
- 03:26 PM MINOVA DEMO 2.00 hours (Project: MINOVA DEMO)
- Testing Report
- 01:56 PM Bank Kalteng (Phase 2) 2.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Medical
- 10:25 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1472 (Closed): [ Report ] - Performance Report Monitoring)
- [ Report ] - Performance Report Monitoring
- 10:15 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1471 (Closed): [ Report ] - Performance Report Individu)
- [ Report ] - Performance Report Individu
08/08/2022
- 07:19 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 05:17 PM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
- Meeting Karyawan
- 05:16 PM MINOVAIS SILVER PACKAGE 5.00 hours (Project: MINOVAIS SILVER PACKAGE)
- Testing Report
- 04:59 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Membuat UAT Script project Bank Kalteng phase 2
- 04:58 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Membuat UAT Script project Bank Kalteng phase 2
- 04:57 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Membuat User Manual BKT Phase 2
- 04:57 PM Bank Kalteng (Phase 2) 1.00 hour (Project: Bank Kalteng (Phase 2))
- ESS Travel
- 04:57 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Membuat User Manual BKT Phase 2
- 04:56 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Membuat User Manual BKT
- 04:56 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Testing BKT dan Setting Phase 2
- 04:56 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Testing BKT dan Setting Phase 2
- 04:56 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
- Testing & Demo Aplikasi
- 04:55 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Testing BKT dan Setting Phase 2
- 04:55 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
- Testing & Demo Aplikasi
- 04:54 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Testing BKT dan Setting Phase 2
- 04:54 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
- Testing & Demo Aplikasi
- 04:52 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
- Testing & Demo Aplikasi
- 04:51 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
- Setting Demo Product
- 04:51 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
- Visit Cilent Wika
- 04:49 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 04:47 PM Bank Kalteng (Phase 2) 5.00 hours (Project: Bank Kalteng (Phase 2))
- Membuat redmine, memperbaiki bug, dan memperbaiki settingan setelah UAT Bank Kalteng
- 04:46 PM Bank Kalteng (Phase 2) 1.00 hour (Project: Bank Kalteng (Phase 2))
- Membuat MoM hasil UAT dengan Bank Kalteng pada tanggal 4 dan 5 Agustus 2022
- 04:45 PM Bank Kalteng (Phase 2) 2.00 hours (Project: Bank Kalteng (Phase 2))
- Meeting Karyawan mengenai Improvement Product
- 04:44 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- UAT Modul Talent dan Recruitment dengan Bank Kalteng
- 04:43 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- UAT Modul PMS dan Kompensasi dengan Bank Kalteng
- 10:52 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- UAT External Bank Kalteng Phase II
- 10:52 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- UAT External Bank Kalteng Phase II
- 10:51 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Testing & preparation UAT Bank Kalteng Phase II
- 10:49 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- UAT External Bank Kalteng Phase II
- 10:48 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- UAT External Bank Kalteng Phase II
08/05/2022
- 06:14 PM BANK WOORI SAUDARA 1.00 hour (Project: BANK WOORI SAUDARA)
- Talent Management
- 06:14 PM BANK WOORI SAUDARA 7.00 hours (Project: BANK WOORI SAUDARA)
- Compensation
- 05:59 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 05:47 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Travel - New flow
- 05:05 PM Asuransi Bintang - Existing 2.30 hours (Bug #1453 (Closed): Error pada saat mengisi secondary job untuk posisi baru yang kosong)
- Error pada saat mengisi secondary job untuk posisi baru yang kosong
- 04:20 PM BANK WOORI SAUDARA 8.00 hours (Project: BANK WOORI SAUDARA)
- Talent Management
- 04:20 PM BANK WOORI SAUDARA 8.00 hours (Project: BANK WOORI SAUDARA)
- Talent Management
- 02:29 PM TUGU PRATAMA INDONESIA (TPI) 2.00 hours (Feature #1455 (Closed): Report My Cv)
- Report My Cv
- 02:28 PM TUGU PRATAMA INDONESIA (TPI) 2.00 hours (Bug #1454 (Closed): report Ess ePayslip )
- report Ess ePayslip
- 10:07 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Also available in: Atom