- 06:11 PM TUGU PRATAMA INDONESIA (TPI) 4.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- support maintance TPI
- 06:10 PM Bank Kalteng (Phase 2) 4.00 hours (Project: Bank Kalteng (Phase 2))
- Support UAT phase 2
- 05:54 PM Bank Kalteng (Phase 2) 7.00 hours (Project: Bank Kalteng (Phase 2))
- OM BKT
- 01:53 PM MINOVAES - PRODUCT 1.00 hour (Project: MINOVAES - PRODUCT)
- Revisi Design Mini Product
08/03/2022
- 04:34 PM BANK WOORI SAUDARA 8.00 hours (Project: BANK WOORI SAUDARA)
- 03:56 PM MINOVAES - PRODUCT 1.00 hour (Project: MINOVAES - PRODUCT)
- Validasi Attendance
- 03:56 PM Bank Kalteng (Phase 2) 7.00 hours (Project: Bank Kalteng (Phase 2))
- Follow up hasil UAT
- 03:06 PM ROHTO BUGS 2.00 hours (Bug #1410 (Closed): [ESS - LEAVE]perhitungan quota pada remaining quota dsb tidak menyesuaikan dengan apa yang ada di master data Absence Quota jika melakukan pengajuan kedua kali nya walau kondisi workflow unfinish)
- [ESS - LEAVE]perhitungan quota pada remaining quota dsb tidak menyesuaikan dengan apa yang ada di master data Absence...
- 11:56 AM ROHTO BUGS 2.00 hours (Bug #1424 (Closed): [ESS-LEAVE] pengajuan cuti jika memilih tanggal 20 sampai 22 tidak dipilih dan kena validasi padahal masih di bawah -14 hari)
- [ESS-LEAVE] pengajuan cuti jika memilih tanggal 20 sampai 22 tidak dipilih dan kena validasi padahal masih di bawah -...
- 11:55 AM PT ARITA 1.00 hour (Bug #1445 (Closed): HR Payslip tidak bisa keluar datanya dan muncul error subreport)
- HR Payslip tidak bisa keluar datanya dan muncul error subreport
- 11:54 AM PT ARITA 1.00 hour (Bug #1448 (Closed): Report Payroll Run Status Detail tidak menampilkan data dan muncul error dataset1)
- Report Payroll Run Status Detail tidak menampilkan data dan muncul error dataset1
- 09:07 AM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing & preparation UAT PMS, Talent, Compensation, recruitment
- 09:02 AM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- UAT External Bank Kalteng
- 09:01 AM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- UAT External Bank Kalteng
08/02/2022
- 06:08 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- support UAT phase 2 , fixing bug modul PMS , BKT (modul recruitment, modul training)
- 05:57 PM Bank Kalteng (Phase 2) 2.00 hours (Bug #1412 (Closed): [Reqruitment Management] Report Vacancy List tidak tampil)
- [Reqruitment Management] Report Vacancy List tidak tampil
- 05:45 PM BANK WOORI SAUDARA 8.00 hours (Project: BANK WOORI SAUDARA)
- Talent Management
- 05:44 PM BANK WOORI SAUDARA 5.00 hours (Project: BANK WOORI SAUDARA)
- Talent Management
- 05:44 PM BANK WOORI SAUDARA 3.00 hours (Project: BANK WOORI SAUDARA)
- Budgeting
- 04:39 PM Bank Kalteng (Phase 2) 1.00 hour (Bug #1422 (Closed): [HR - Recruitment Management] Filter di Report Applicant Activity by Assignment tidak berfungsi)
- [HR - Recruitment Management] Filter di Report Applicant Activity by Assignment tidak berfungsi
- 03:34 PM BANK WOORI SAUDARA 8.00 hours (Project: BANK WOORI SAUDARA)
- 03:33 PM BANK WOORI SAUDARA 8.00 hours (Project: BANK WOORI SAUDARA)
- 03:30 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- UAT Phase 2
- 02:55 PM Bank Kalteng (Phase 2) 4.00 hours (Bug #1398 (Closed): [Report PMS] Menampilkan Report PMS per Individu)
- [Report PMS] Menampilkan Report PMS per Individu
- 10:12 AM Bank Kalteng (Phase 2) 1.00 hour (Bug #1397 (Closed): [HR PMS] Data yang tampil masih kode)
- [HR PMS] Data yang tampil masih kode
08/01/2022
- 06:35 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Support BKT UAT phase 2 , Rotho (modul time management)
- 04:12 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- UAT Phase 2
- 09:29 AM BANK WOORI SAUDARA 8.00 hours (Project: BANK WOORI SAUDARA)
07/29/2022
- 05:27 PM BANK WOORI SAUDARA 8.00 hours (Project: BANK WOORI SAUDARA)
- BWS
- 05:21 PM Phase 2 8.00 hours (Project: Phase 2)
- 04:31 PM MINOVAES - PRODUCT 3.00 hours (Project: MINOVAES - PRODUCT)
- Design Mock up Mini Product
- 04:20 PM Bank Kalteng (Phase 2) 1.30 hour (Bug #1377 (Closed): [HR - Training Management] Nama Office tidak sesuai)
- [HR - Training Management] Nama Office tidak sesuai
- 02:52 PM Bank Kalteng (Phase 2) 5.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Travel
- 09:28 AM CNAF 2.50 hours (Project: CNAF)
- Fixing & Checking Prorate BPJS Kesehatan CNAF
- 08:42 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
07/28/2022
- 06:41 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- aceh (Support request Client) , BKT (PMS goal setting , review , final & travel) , BMS(Travel editGrid for web mobile...
- 06:36 PM Bank Kalteng (Phase 2) 2.00 hours (Support #1399 (Closed): [ESS Travel] Mail Notif Supervisor)
- [ESS Travel] Mail Notif Supervisor
- 06:01 PM BANK WOORI SAUDARA 2.00 hours (Project: BANK WOORI SAUDARA)
- Budgeting
- 06:00 PM BANK WOORI SAUDARA 6.00 hours (Project: BANK WOORI SAUDARA)
- Talent Management
- 05:59 PM BANK WOORI SAUDARA 5.00 hours (Project: BANK WOORI SAUDARA)
- PMS
- 05:58 PM BANK KALTENG 3.00 hours (Project: BANK KALTENG)
- Meeting BKT
- 05:56 PM BANK WOORI SAUDARA 8.00 hours (Project: BANK WOORI SAUDARA)
- BWS
- 05:26 PM PT ARITA 8.00 hours (Project: PT ARITA)
- User Manual
- 04:56 PM Minova ERP Internal 2.50 hours (Bug #1416 (Closed): [Sales Order] Field Total Amount tercalculate otomatis)
- Fixing Total Amount Sales
- 04:51 PM TUGU PRATAMA INDONESIA (TPI) 5.50 hours (Bug #1411 (Closed): Generate User dengan user name menggunakan email)
- Fixing Generate User With Email
- 04:50 PM TUGU PRATAMA INDONESIA (TPI) 5.50 hours (Bug #1411 (Closed): Generate User dengan user name menggunakan email)
- Fixing Generate User With Email
- 04:39 PM MINOVAES - PRODUCT 2.00 hours (Bug #1415 (Closed): [HR-BUDGET] Perhitungan dan Report Budget )
- Fixing Budget Calculation & Report
- 02:56 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Pendampingan Trial Phase 1 BKT
- 02:55 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Pendampingan Trial Phase 1 BKT
- 02:49 PM Bank Kalteng (Phase 2) 2.00 hours (Project: Bank Kalteng (Phase 2))
- Zoom Meeting Progress BKT
- 02:48 PM Bank Kalteng (Phase 2) 3.00 hours (Project: Bank Kalteng (Phase 2))
- Testing & Persiapan meeting Pre-UAT Bank Kalteng modul Talent & Training
- 02:41 PM Bank Kalteng (Phase 2) 3.00 hours (Project: Bank Kalteng (Phase 2))
- Zoom meeting Pre-UAT Bank Kalteng modul PMS & Compensation
- 02:39 PM Bank Kalteng (Phase 2) 3.00 hours (Project: Bank Kalteng (Phase 2))
- Zoom meeting Pre-UAT Bank Kalteng modul PMS & Compensation
- 02:39 PM Bank Kalteng (Phase 2) 3.00 hours (Project: Bank Kalteng (Phase 2))
- Testing & Persiapan Pre-UAT Bank Kalteng modul PMS & Compensation
- 02:32 PM Bank Kalteng (Phase 2) 4.00 hours (Project: Bank Kalteng (Phase 2))
- Testing & Persiapan Pre-UAT Bank Kalteng modul Budgeting & Recruitment
- 02:31 PM Bank Kalteng (Phase 2) 3.00 hours (Project: Bank Kalteng (Phase 2))
- Zoom Pre-UAT Bank Kalteng modul Budgeting & Recruitment
- 02:27 PM Bank Kalteng (Phase 2) 4.00 hours (Project: Bank Kalteng (Phase 2))
- Testing & preparation PRE-UAT Mecical & Travel
- 02:24 PM Bank Kalteng (Phase 2) 3.00 hours (Project: Bank Kalteng (Phase 2))
- Zoom Bank Kalteng Pre-UAT Modul Medical & Travel
- 12:26 PM BANK WOORI SAUDARA 8.00 hours (Project: BANK WOORI SAUDARA)
- BWS (Modul Training & performance ) , BMS (modul Travel , Performance & Training ) & Aceh (modul HR Administration)
- 12:18 PM Bank Aceh 1.00 hour (Support #1036 (Closed): [Bank Aceh] - Bug Report Year of service )
- [Bank Aceh] - Bug Report Year of service
- 12:15 PM Bank Aceh 1.00 hour (Support #1035 (Closed): [Bank Aceh] - Custom Amployee)
- [Bank Aceh] - Custom Amployee
- 12:13 PM Bank Kalteng (Phase 2) 4.00 hours (Feature #1402 (Closed): [ESS PMS] Bobot Perhitungan KPI dan Competency)
- [ESS PMS] Bobot Perhitungan KPI dan Competency
- 09:14 AM PT ARITA 2.00 hours (Project: PT ARITA)
- ESS Exit Clearance
07/27/2022
- 07:08 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 06:51 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 05:31 PM PT BMS MIGRATION & ENHANCEMENT 5.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 05:22 PM Phase 2 2.00 hours (Bug #1394 (QA Test): [ HR ] - Performance Report Individu)
- [ HR ] - Performance Report Individu
- 05:12 PM BANK KALTENG 3.00 hours (Project: BANK KALTENG)
- BKT Rekruitmen
- 04:02 PM MINOVAES - PRODUCT 2.00 hours (Project: MINOVAES - PRODUCT)
- Design Mock up Mini Product
- 03:56 PM Phase 2 1.00 hour (Bug #1370 (QA Test): [ HR ] - Report Training "Training List By Job")
- [ HR ] - Report Training "Training List By Job"
- 03:50 PM Phase 2 1.00 hour (Bug #1369 (QA Test): [ HR ] - Report Training "Cost Realization")
- [ HR ] - Report Training "Cost Realization"
- 03:36 PM Phase 2 1.00 hour (Bug #1368 (QA Test): [ HR ] - Report Training "Training Implementation")
- [ HR ] - Report Training "Training Implementation"
- 03:25 PM Phase 2 1.00 hour (Bug #1367 (QA Test): [ HR ] - Report Training "Instructor Evaluation Training")
- [ HR ] - Report Training "Instructor Evaluation Training"
- 02:40 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 02:38 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 02:22 PM Phase 2 4.00 hours (Project: Phase 2)
- 02:21 PM BANK MEGA SYARIAH - ES 4.00 hours (Project: BANK MEGA SYARIAH - ES)
- 11:43 AM Bank Kalteng (Phase 2) 4.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Travel
- 09:47 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- ess travel , PMS , report2
07/26/2022
- 05:43 PM BANK MEGA SYARIAH - ES 4.00 hours (Project: BANK MEGA SYARIAH - ES)
- 05:43 PM Phase 2 4.00 hours (Project: Phase 2)
- 05:42 PM BANK MEGA SYARIAH - ES 8.00 hours (Project: BANK MEGA SYARIAH - ES)
- 05:42 PM BANK WOORI SAUDARA 8.00 hours (Project: BANK WOORI SAUDARA)
- 04:54 PM Bank Kalteng (Phase 2) 4.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Travel
- 04:54 PM Bank Kalteng (Phase 2) 4.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Medical
- 03:31 PM MINOVAES - PRODUCT 2.00 hours (Bug #1336 (Closed): [HR-COMPENSATION] Calculation masih ada yg kurang sesuai)
- Fixing Compensation Calculate & Report
- 03:30 PM Minova ERP Internal 3.00 hours (Project: Minova ERP Internal)
- Meeting Koordinasi
- 03:29 PM MINOVA DEMO 2.00 hours (Bug #1337 (Closed): [HR-COMPENSATION] Calculation masih ada yg kurang sesuai)
- Fixing Compensation Calculate & Report
- 03:09 PM MINOVA DEMO 4.00 hours (Bug #1337 (Closed): [HR-COMPENSATION] Calculation masih ada yg kurang sesuai)
- Fixing Compensation Calculate & Report
- 03:26 PM IMFI 3.00 hours (Feature #1364 (Closed): [CR] Perubahan field no_tht pada payroll basic data menjadi NPWP Name)
- Perubahan Nama NPWP IMFI
- 03:24 PM CNAF 3.00 hours (Project: CNAF)
- Fixing & Checking Prorate BPJS CNAF
- 03:23 PM Phase 2 2.00 hours (Feature #1375 (QA Test): [ HR ] - Compensation Report)
- Fixing Compensation Report
- 03:21 PM Phase 2 2.50 hours (Feature #1373 (QA Test): [ HR ] Compensation - Perhitungan)
- Fixing Compensation Calculate
- 03:14 PM MINOVA DEMO 4.00 hours (Feature #1393 (Closed): Modul HR Budgeting & Competasion)
- Fixing Budget Calculation & Report
- 01:44 PM Bank Kalteng (Phase 2) 2.30 hours (Support #1395 (Closed): [ESS Travel] Orgnization Level Direksi)
- [ESS Travel] Orgnization Level Direksi
- 01:44 PM Bank Kalteng (Phase 2) 2.00 hours (Support #1400 (Closed): [ESS Travel] Task Condition)
- [ESS Travel] Task Condition
- 01:43 PM Bank Kalteng (Phase 2) 1.00 hour (Support #1407 (Closed): [ESS Travel] - Settlement)
- [ESS Travel] - Settlement
- 09:52 AM PT BIA 8.00 hours (Project: PT BIA)
- VISIT BIA
- 09:51 AM PT BIA 8.00 hours (Project: PT BIA)
- VISIT BIA
- 09:50 AM PT BIA 8.00 hours (Project: PT BIA)
- VISIT BIA
- 09:50 AM PT BIA 8.00 hours (Project: PT BIA)
- VISIT BIA
- 09:49 AM PT BIA 8.00 hours (Project: PT BIA)
- VISIT BIA
- 09:49 AM PT BIA 8.00 hours (Project: PT BIA)
- VISIT BIA
- 09:01 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 08:48 AM Bank Kalteng (Phase 2) 4.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Travel
07/25/2022
- 06:53 PM Bank Kalteng (Phase 2) 2.00 hours (Support #1406 (Closed): [ESS Travel] - Validasi Requester)
- [ESS Travel] - Validasi Requester
- 11:58 AM MINOVAES - PRODUCT 4.00 hours (Project: MINOVAES - PRODUCT)
- Design News Update Menu
- 11:38 AM Bank Kalteng (Phase 2) 1.00 hour (Support #1401 (Closed): [ESS Travel] Delete Button Add Delete)
- [ESS Travel] Delete Button Add Delete
- 11:27 AM Bank Kalteng (Phase 2) 2.30 hours (Project: Bank Kalteng (Phase 2))
- Report Bank Aceh (All Employee & Years Of Service)
- 09:49 AM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
- Visit Client
- 09:48 AM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
- Testing & Demo Aplikasi
- 09:46 AM MINOVA DEMO 9.50 hours (Project: MINOVA DEMO)
- Testing & Demo Aplikasi
- 09:45 AM MINOVA DEMO 10.00 hours (Project: MINOVA DEMO)
- Testing & Demo Aplikasi
- 09:00 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
07/22/2022
- 05:20 PM Bank Kalteng (Phase 2) 4.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Travel
- 03:44 PM MINOVA DEMO 3.00 hours (Project: MINOVA DEMO)
- Fixing Save Document ERP
- 03:00 PM MINOVA DEMO 4.00 hours (Project: MINOVA DEMO)
- ESS Purchase Requisition
- 09:53 AM MINOVA DEMO 2.00 hours (Project: MINOVA DEMO)
- ESS Purchase Requisition
- 09:45 AM MINOVA DEMO 2.30 hours (Support #1389 (Closed): Vendor Selection Report)
- Vendor Selection Report
- 08:47 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 05:17 AM Bank Kalteng (Phase 2) 2.30 hours (Bug #1398 (Closed): [Report PMS] Menampilkan Report PMS per Individu)
- [Report PMS] Menampilkan Report PMS per Individu
07/21/2022
- 03:11 PM Bank Kalteng (Phase 2) 6.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Travel
- 02:46 PM Phase 2 2.00 hours (Feature #1374 (QA Test): [ HR ] - Budgeting Report)
- Fixing Report Budget
- 02:45 PM Phase 2 2.00 hours (Feature #1371 (QA Test): [ HR ] Budgeting - Perhitungan)
- Fixing Budget Calculation
- 02:44 PM MINOVA DEMO 4.00 hours (Bug #1391 (Closed): [DOCUMENT] Create Ref masih belum bisa dilakukan)
- Fixing Doc Ref
- 10:39 AM Phase 2 8.00 hours (Project: Phase 2)
- 10:07 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
07/20/2022
- 11:15 PM Bank Kalteng (Phase 2) 1.00 hour (Feature #1388 (Closed): ESS Travel )
- ESS Travel
- 05:49 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
- 05:18 PM Bank Kalteng (Phase 2) 2.00 hours (Bug #1372 (Closed): [HR-PMS] Data tidak Tampil di UI)
- [HR-PMS] Data tidak Tampil di UI
- 05:17 PM IMFI 1.00 hour (Bug #1390 (Closed): Report Overtime)
- Report Overtime
- 10:36 AM BANK FAMA 8.00 hours (Project: BANK FAMA)
- Fixing Pajak Init Paycumm
- 10:34 AM BANK KALTENG 8.00 hours (Bug #1327 (Closed): [HR-COMPENSATION] Calculation masih ada yg kurang sesuai)
- Fixing Report Compensation
- 09:44 AM BANK KALTENG 8.00 hours (Bug #1327 (Closed): [HR-COMPENSATION] Calculation masih ada yg kurang sesuai)
- Fixing Compensation Calculate
- 09:38 AM BANK KALTENG 8.00 hours (Bug #1327 (Closed): [HR-COMPENSATION] Calculation masih ada yg kurang sesuai)
- Fixing Compensation Calculate
- 10:31 AM Bank Kalteng (Phase 2) 8.00 hours (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
- Fixing Budget Calculation
- 10:21 AM Bank Kalteng (Phase 2) 4.00 hours (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
- Fixing Budget Calculation
- 10:29 AM Bank Kalteng (Phase 2) 8.00 hours (Bug #1352 (Closed): [HR Assessment] Data tidak ke save ke DB, sehingga tidak tampil di HR )
- Fixing Assesment
- 09:49 AM BANK KALTENG 4.00 hours (Bug #1354 (Closed): [HR-BUDGET] Report Error)
- Fixing Report Budget
- 08:49 AM MINOVA DEMO 4.00 hours (Project: MINOVA DEMO)
- Demo PT Wika
07/19/2022
- 05:42 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 05:42 PM Phase 2 4.00 hours (Project: Phase 2)
- 11:52 AM PT ARITA 4.00 hours (Project: PT ARITA)
- ESS PMS
- 11:01 AM Bank Kalteng (Phase 2) 2.30 hours (Support #1362 (Closed): ESS Travel)
- ESS Travel
07/18/2022
- 05:24 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Membuat Script UAT BKT Phase 2 dan Memperbaiki Settingan PMS
- 05:16 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:10 PM PT ARITA 6.00 hours (Project: PT ARITA)
- ESS PMS
- 01:50 PM Bank Kalteng (Phase 2) 2.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Medical
- 11:51 AM Bank Kalteng (Phase 2) 1.00 hour (Bug #1363 (Closed): [ESS PMS] PMS Review Phase 2 - Hilangkan Button Add & Delete)
- [ESS PMS] PMS Review Phase 2 - Hilangkan Button Add & Delete
- 11:38 AM Bank Kalteng (Phase 2) 1.30 hour (Bug #1361 (Closed): Error Claim Status)
- Error Claim Status
- 10:36 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 10:05 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Setting PMS BKT Phase 2
- 10:05 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Setting PMS BKT Phase 2
- 10:03 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Setting PMS di project BKT
- 10:03 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Testing BKT dan Setting Phase 2
- 10:02 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Testing BKT dan Setting Phase 2
- 10:02 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Testing BKT dan Setting Phase 2
- 10:02 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Testing BKT dan Setting Phase 2
- 09:57 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Setting PMS di project BKT
- 09:57 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 09:56 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 09:56 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 09:56 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 09:56 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 09:55 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 09:55 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 09:54 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 09:54 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 09:54 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 09:54 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Visit BMS
- 09:53 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 09:52 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 09:51 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Visit to Client BMS
- 09:47 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 09:46 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Visit to Client BMS
- 08:31 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
07/15/2022
- 05:09 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- ESS - Travel
- 03:59 PM Bank Kalteng (Phase 2) 7.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Travel
- 02:50 PM MINOVAES - PRODUCT 1.00 hour (Project: MINOVAES - PRODUCT)
- Variant, Cost Element
07/14/2022
- 06:11 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- ESS - Travel
- 05:13 PM PT ARITA 1.00 hour (Support #1357 (Closed): ESS Exit Clearance )
- ESS Exit Clearance
- 05:00 PM Bank Kalteng (Phase 2) 2.00 hours (Bug #1274 (Closed): [ESS PMS] Validasi KPI Score di PMS Final)
- [ESS PMS] Validasi KPI Score di PMS Final
- 04:45 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1360 (Closed): [ Report ] - Overtime Recap)
- [ Report ] - Overtime Recap
- 04:44 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1359 (Closed): [ Report ] - Travel Recap Loading lama)
- [ Report ] - Travel Recap Loading lama
- 03:13 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1356 (Closed): [ HR - Total Cost ] - Amount kelebihan NOL)
- [ HR - Total Cost ] - Amount kelebihan NOL
- 02:56 PM Bank Kalteng (Phase 2) 3.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Medical
- 02:39 PM MINOVA DEMO 4.00 hours (Project: MINOVA DEMO)
- Setting PT Wika Purchase Structure
- 12:02 PM PT ARITA 1.00 hour (Project: PT ARITA)
- ESS Exit Clearance
- 11:56 AM PT ARITA 1.30 hour (Feature #1304 (Closed): ESS Exit Clearance - Autofill Field)
- ESS Exit Clearance - Autofill Field
- 11:45 AM PT ARITA 1.30 hour (Feature #1305 (Closed): ESS Exit Clearance - Autofill Field)
- ESS Exit Clearance - Autofill Field
07/13/2022
- 03:06 PM Bank Kalteng (Phase 2) 2.30 hours (Feature #1353 (Closed): kalkulasi pada form travel)
- kalkulasi pada form travel
- 02:56 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
- Setting PT Wika Purchase Structure
- 11:31 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
07/12/2022
- 05:50 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- ESS - Travel
- 05:49 PM MINOVA DEMO 7.00 hours (Project: MINOVA DEMO)
- ESS Purchase Requisition - PT WIKA
- 04:20 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 02:34 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Mutation
- 02:05 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 11:40 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Help Business development
- 11:39 AM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
- Help Business development
- 11:38 AM Minova Corp Affairs 6.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 11:38 AM Minova ERP Internal 4.00 hours (Project: Minova ERP Internal)
- Finance
- 11:37 AM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
- Help Business development
- 11:36 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 11:36 AM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
- Help Business development
- 11:35 AM Minova Corp Affairs 6.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 10:50 AM PT BMS MIGRATION & ENHANCEMENT 1.30 hour (Bug #1342 (Closed): Training List By Job)
- Training List By Job
07/11/2022
- 05:44 PM PT BIA 8.00 hours (Project: PT BIA)
- Mapping data
- 05:37 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1345 (Closed): [ESS] - Promotion )
- [ESS] - Promotion
- 04:49 PM PT BIA 8.00 hours (Project: PT BIA)
- OM BIA
- 04:38 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Feature #1343 (Closed): [ ESS - Overtime ] - Condition Back Date & Condition Day Type)
- [ ESS - Overtime ] - Condition Back Date & Condition Day Type
- 11:03 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
07/08/2022
- 05:12 PM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Promotion
- 05:12 PM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 05:11 PM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
- Meeting Internal
- 05:11 PM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
- Sharing Internal
- 04:10 PM PT BIA 5.00 hours (Project: PT BIA)
- OM BIA
- 04:10 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Mutation
- 04:10 PM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
- Sharing Internal
- 10:34 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1341 (Closed): [ESS] - Mutation)
- [ESS] - Mutation
- 10:33 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1340 (Closed): [ESS] - Promotion )
- [ESS] - Promotion
- 08:58 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
07/07/2022
- 05:26 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 05:26 PM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Promotion
- 05:26 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- visit BMS
- 05:24 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
- Meeting - Pembahasan Modul Travel HRIS PT Bank Kalteng
- 04:42 PM PT BIA 6.00 hours (Project: PT BIA)
- OM BIA
- 02:47 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Mutation
- 02:38 PM Bank Kalteng (Phase 2) 8.00 hours (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
- Fixing Budget Calculation
- 02:34 PM BANK KALTENG 8.00 hours (Bug #1327 (Closed): [HR-COMPENSATION] Calculation masih ada yg kurang sesuai)
- Fixing Compensation Calculate
- 11:59 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1338 (Closed): ESS Mutation - Autofill field)
- ESS Mutation - Autofill field
- 11:35 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1339 (Closed): [ESS] - Promotion )
- [ESS] - Promotion
07/06/2022
- 06:01 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 05:55 PM PT BIA 2.00 hours (Project: PT BIA)
- Mapping data
- 05:54 PM BANK KALTENG 6.00 hours (Project: BANK KALTENG)
- ESS - Travel
- 05:25 PM PT BIA 8.00 hours (Project: PT BIA)
- OM BIA
- 05:08 PM Bank Kalteng (Phase 2) 1.00 hour (Bug #1297 (Closed): [ESS] - Travel)
- [ESS] - Travel
- 04:16 PM Bank Kalteng (Phase 2) 2.00 hours (Feature #1295 (Closed): [ESS PMS] PMS Final Phase 2)
- [ESS PMS] PMS Final Phase 2
- 03:28 PM Bank Kalteng (Phase 2) 4.00 hours (Feature #1291 (Closed): [ESS PMS] PMS Review Phase 2)
- [ESS PMS] PMS Review Phase 2
- 02:41 PM BANK KALTENG 5.00 hours (Bug #1327 (Closed): [HR-COMPENSATION] Calculation masih ada yg kurang sesuai)
- Fixing Compensation Calculate