M Azid Wahyudi's activity
From 06/27/2022 to 07/26/2022
07/26/2022
- 01:44 PM Bank Kalteng (Phase 2) Support #1395: [ESS Travel] Orgnization Level Direksi
- dear fiona , untuk redmine ini udah bisa di test ya
makasih - 01:44 PM Bank Kalteng (Phase 2) 2.30 hours (Support #1395 (Closed): [ESS Travel] Orgnization Level Direksi)
- [ESS Travel] Orgnization Level Direksi
- 01:44 PM Bank Kalteng (Phase 2) 2.00 hours (Support #1400 (Closed): [ESS Travel] Task Condition)
- [ESS Travel] Task Condition
- 01:44 PM Bank Kalteng (Phase 2) Support #1400: [ESS Travel] Task Condition
- dear fiona , untuk redmine ini udah bisa di test ya
makasih - 01:43 PM Bank Kalteng (Phase 2) 1.00 hour (Support #1407 (Closed): [ESS Travel] - Settlement)
- [ESS Travel] - Settlement
- 01:43 PM Bank Kalteng (Phase 2) Support #1407 (QA Test): [ESS Travel] - Settlement
- dear fiona , untuk issue ini udah bisa di test ya
makasih
07/25/2022
- 06:55 PM Bank Kalteng (Phase 2) Support #1400 (QA Test): [ESS Travel] Task Condition
- dear fio , untuk Direksi , coba test dulu takutnya udah di kerjain sama mang wanto
makasih - 06:55 PM Bank Kalteng (Phase 2) Support #1395 (QA Test): [ESS Travel] Orgnization Level Direksi
- dear fio , untuk Direksi , coba test dulu takutnya udah di kerjain sama mang wanto
makasih - 06:53 PM Bank Kalteng (Phase 2) Support #1406 (QA Test): [ESS Travel] - Validasi Requester
- dear fiona , untuk validasi ini udah bisa di test ya
makasih - 06:53 PM Bank Kalteng (Phase 2) 2.00 hours (Support #1406 (Closed): [ESS Travel] - Validasi Requester)
- [ESS Travel] - Validasi Requester
- 11:38 AM Bank Kalteng (Phase 2) 1.00 hour (Support #1401 (Closed): [ESS Travel] Delete Button Add Delete)
- [ESS Travel] Delete Button Add Delete
- 11:38 AM Bank Kalteng (Phase 2) Support #1401 (QA Test): [ESS Travel] Delete Button Add Delete
- dear fiona , untuk redmine ini udah bisa di test ya
makasih - 11:27 AM Bank Kalteng (Phase 2) 2.30 hours (Project: Bank Kalteng (Phase 2))
- Report Bank Aceh (All Employee & Years Of Service)
07/22/2022
- 09:45 AM MINOVA DEMO 2.30 hours (Support #1389 (Closed): Vendor Selection Report)
- Vendor Selection Report
- 09:45 AM MINOVA DEMO Support #1389 (QA Test): Vendor Selection Report
- dear fiona , untuk reoirt ini udah bisa di test ya
makasih - 05:17 AM Bank Kalteng (Phase 2) 2.30 hours (Bug #1398 (Closed): [Report PMS] Menampilkan Report PMS per Individu)
- [Report PMS] Menampilkan Report PMS per Individu
- 05:17 AM Bank Kalteng (Phase 2) Bug #1398 (QA Test): [Report PMS] Menampilkan Report PMS per Individu
- dear mega , untuk report ini udah di deploy di sini ya
karena server db kalteng belom up jadi di deploy di port k...
07/20/2022
- 11:15 PM Bank Kalteng (Phase 2) Feature #1388 (QA Test): ESS Travel
- dear fiona , untuk feature ini udah bisa di test
makasih - 11:15 PM Bank Kalteng (Phase 2) 1.00 hour (Feature #1388 (Closed): ESS Travel )
- ESS Travel
- 05:18 PM Bank Kalteng (Phase 2) 2.00 hours (Bug #1372 (Closed): [HR-PMS] Data tidak Tampil di UI)
- [HR-PMS] Data tidak Tampil di UI
- 05:18 PM Bank Kalteng (Phase 2) Bug #1372 (QA Test): [HR-PMS] Data tidak Tampil di UI
- dear mega , untuk issue ini udah bisa di test ya
makasih - 05:17 PM IMFI Bug #1390 (QA Test): Report Overtime
- dear bang daud, untuk issue ini udah bisa di cek di prod kita
RDL : Rpt_INFI_TM_Overtime_dur.rdl
makasih - 05:17 PM IMFI 1.00 hour (Bug #1390 (Closed): Report Overtime)
- Report Overtime
07/19/2022
- 11:01 AM Bank Kalteng (Phase 2) Support #1362 (QA Test): ESS Travel
- dear fiona , untuk redmine ini udah bisa di test ya
makasih - 11:01 AM Bank Kalteng (Phase 2) 2.30 hours (Support #1362 (Closed): ESS Travel)
- ESS Travel
07/18/2022
- 11:51 AM Bank Kalteng (Phase 2) Bug #1363 (QA Test): [ESS PMS] PMS Review Phase 2 - Hilangkan Button Add & Delete
- dear mega , untuk redmine ini udah bisa di test ya
makesure dulu untuk yg Skala Penilaian Hasil Kerja , kalau di ... - 11:51 AM Bank Kalteng (Phase 2) 1.00 hour (Bug #1363 (Closed): [ESS PMS] PMS Review Phase 2 - Hilangkan Button Add & Delete)
- [ESS PMS] PMS Review Phase 2 - Hilangkan Button Add & Delete
- 11:38 AM Bank Kalteng (Phase 2) 1.30 hour (Bug #1361 (Closed): Error Claim Status)
- Error Claim Status
- 11:38 AM Bank Kalteng (Phase 2) Bug #1361 (QA Test): Error Claim Status
- dear fiona , untuk issue ini udah bisa di test ya
makasih
07/14/2022
- 05:13 PM PT ARITA Support #1357 (QA Test): ESS Exit Clearance
- dear fiona , untuk issue ini udah bisa di test ya
makasih - 05:13 PM PT ARITA 1.00 hour (Support #1357 (Closed): ESS Exit Clearance )
- ESS Exit Clearance
- 05:00 PM Bank Kalteng (Phase 2) 2.00 hours (Bug #1274 (Closed): [ESS PMS] Validasi KPI Score di PMS Final)
- [ESS PMS] Validasi KPI Score di PMS Final
- 05:00 PM Bank Kalteng (Phase 2) Bug #1274 (QA Test): [ESS PMS] Validasi KPI Score di PMS Final
- dear mega , untuk issue ini udah bisa di test ya
makasih - 04:45 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1360 (Closed): [ Report ] - Overtime Recap)
- [ Report ] - Overtime Recap
- 04:45 PM PT BMS MIGRATION & ENHANCEMENT Bug #1360 (QA Test): [ Report ] - Overtime Recap
- dear erik , untuk issue ini udah bisa di test ya
makasih - 04:44 PM PT BMS MIGRATION & ENHANCEMENT Bug #1359 (QA Test): [ Report ] - Travel Recap Loading lama
- dear erik , untuk issue ini udah bisa di test ya
makasih - 04:44 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1359 (Closed): [ Report ] - Travel Recap Loading lama)
- [ Report ] - Travel Recap Loading lama
- 03:13 PM PT BMS MIGRATION & ENHANCEMENT Bug #1356 (QA Test): [ HR - Total Cost ] - Amount kelebihan NOL
- dear erik , untuk ini udah bisa di test ya
Note fix:
- di iis
UI & API2 di setting globalization > cult... - 03:13 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1356 (Closed): [ HR - Total Cost ] - Amount kelebihan NOL)
- [ HR - Total Cost ] - Amount kelebihan NOL
- 11:56 AM PT ARITA Feature #1304 (QA Test): ESS Exit Clearance - Autofill Field
- dear fiona , untuk redmine ini udah bisa di test ya
harap lengkapi datanya di phrpa0014
makasih - 11:56 AM PT ARITA 1.30 hour (Feature #1304 (Closed): ESS Exit Clearance - Autofill Field)
- ESS Exit Clearance - Autofill Field
- 11:45 AM PT ARITA 1.30 hour (Feature #1305 (Closed): ESS Exit Clearance - Autofill Field)
- ESS Exit Clearance - Autofill Field
- 11:45 AM PT ARITA Feature #1305 (QA Test): ESS Exit Clearance - Autofill Field
- dear fiona , untuk redmine ini udah bisa di test ya
makasih
07/13/2022
- 03:06 PM Bank Kalteng (Phase 2) 2.30 hours (Feature #1353 (Closed): kalkulasi pada form travel)
- kalkulasi pada form travel
- 03:06 PM Bank Kalteng (Phase 2) Feature #1353 (QA Test): kalkulasi pada form travel
- dear bang fahrul , udah bisa di test ya
makasih
07/12/2022
- 10:50 AM PT BMS MIGRATION & ENHANCEMENT Bug #1342 (QA Test): Training List By Job
- dear sergio , untuk ini udah bisa di test ya
makasih - 10:50 AM PT BMS MIGRATION & ENHANCEMENT 1.30 hour (Bug #1342 (Closed): Training List By Job)
- Training List By Job
07/11/2022
- 05:37 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1345 (Closed): [ESS] - Promotion )
- [ESS] - Promotion
- 05:37 PM PT BMS MIGRATION & ENHANCEMENT Bug #1345 (QA Test): [ESS] - Promotion
- dear johanes , untuk ini udah bisa di test ya
makasih - 04:38 PM PT BMS MIGRATION & ENHANCEMENT Feature #1343 (QA Test): [ ESS - Overtime ] - Condition Back Date & Condition Day Type
- dear mang erik , untuk cond ini udah bisa di test semua ya
makasih - 04:38 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Feature #1343 (Closed): [ ESS - Overtime ] - Condition Back Date & Condition Day Type)
- [ ESS - Overtime ] - Condition Back Date & Condition Day Type
07/08/2022
- 10:34 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1341 (Closed): [ESS] - Mutation)
- [ESS] - Mutation
- 10:34 AM PT BMS MIGRATION & ENHANCEMENT Bug #1341 (QA Test): [ESS] - Mutation
- dear fiona , untuk issue ini udah bisa di test ya
makasih - 10:33 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1340 (Closed): [ESS] - Promotion )
- [ESS] - Promotion
- 10:33 AM PT BMS MIGRATION & ENHANCEMENT Bug #1340 (QA Test): [ESS] - Promotion
- dear johanes ,, untuk issue inin udah bisa di test ya
makasih
07/07/2022
- 11:59 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1338 (Closed): ESS Mutation - Autofill field)
- ESS Mutation - Autofill field
- 11:59 AM PT BMS MIGRATION & ENHANCEMENT Feature #1338 (QA Test): ESS Mutation - Autofill field
- dear fiona , untuk ini udaah bisa di test ya
makasih - 11:35 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1339 (Closed): [ESS] - Promotion )
- [ESS] - Promotion
- 11:35 AM PT BMS MIGRATION & ENHANCEMENT Bug #1339 (QA Test): [ESS] - Promotion
- dear johanes , untuk issue ini udah bisa di test ya
makasih
07/06/2022
- 05:08 PM Bank Kalteng (Phase 2) Bug #1297 (QA Test): [ESS] - Travel
- 05:08 PM Bank Kalteng (Phase 2) 1.00 hour (Bug #1297 (Closed): [ESS] - Travel)
- [ESS] - Travel
- 05:08 PM Bank Kalteng (Phase 2) Bug #1297: [ESS] - Travel
- dear johanes , untuk issue ini udah bisa di test ya
makasih - 04:30 PM Bank Kalteng (Phase 2) Feature #1298 (QA Test): [ESS] - Travel
- 04:30 PM Bank Kalteng (Phase 2) Feature #1298: [ESS] - Travel
- dear johanes , untuk issue ini udah bisa di test ya
makasih - 04:16 PM Bank Kalteng (Phase 2) Feature #1295 (QA Test): [ESS PMS] PMS Final Phase 2
- dear mega , untuk ini udah bisa di test ya
makasih - 04:16 PM Bank Kalteng (Phase 2) 2.00 hours (Feature #1295 (Closed): [ESS PMS] PMS Final Phase 2)
- [ESS PMS] PMS Final Phase 2
- 03:28 PM Bank Kalteng (Phase 2) 4.00 hours (Feature #1291 (Closed): [ESS PMS] PMS Review Phase 2)
- [ESS PMS] PMS Review Phase 2
- 03:28 PM Bank Kalteng (Phase 2) Feature #1291 (QA Test): [ESS PMS] PMS Review Phase 2
- dear mega ,, udah bisa di test ya
makasih
07/05/2022
- 05:47 PM PT BMS MIGRATION & ENHANCEMENT Feature #1311 (QA Test): ESS Exit Clearance - Show Deskripsi
- dear fiona , untuk ini udah bisa di test ya
makasih - 05:47 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1311 (Closed): ESS Exit Clearance - Show Deskripsi)
- ESS Exit Clearance - Show Deskrips
- 05:35 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1312 (Closed): ESS Mutation - Autofill field)
- ESS Mutation - Autofill field
- 05:35 PM PT BMS MIGRATION & ENHANCEMENT Feature #1312 (QA Test): ESS Mutation - Autofill field
- dear fiona , udah bisa di test ya
makasih - 04:43 PM PT BMS MIGRATION & ENHANCEMENT Bug #1333 (QA Test): [ESS] - Mutation
- dear fiona , untuk issue ini udah bisa di test ya
makasih - 04:43 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1333 (Closed): [ESS] - Mutation)
- [ESS] - Mutation
- 04:42 PM PT BMS MIGRATION & ENHANCEMENT Bug #1332 (QA Test): [ESS] - Exit Clearance
- dear fiona , untuk issue ini udah bisa di test ya
makasih - 04:42 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1332 (Closed): [ESS] - Exit Clearance)
- [ESS] - Exit Clearance
- 04:41 PM PT BMS MIGRATION & ENHANCEMENT Bug #1331 (QA Test): [ESS] - Promotion
- dear johanes,, udah bisa di test ya
makasih - 04:41 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1331 (Closed): [ESS] - Promotion )
- [ESS] - Promotion
- 03:15 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Bug #1231 (Closed): [ Report ] - Performance Report Monitoring)
- [ Report ] - Performance Report Monitoring
- 03:15 PM PT BMS MIGRATION & ENHANCEMENT Bug #1231 (QA Test): [ Report ] - Performance Report Monitoring
- dear mang eric , untuk report ini udah bisa di test ya
makasih
07/04/2022
- 06:31 PM PT BMS MIGRATION & ENHANCEMENT 1.30 hour (Feature #1319 (Closed): [ESS] - Promotion - Autofill )
- [ESS] - Promotion - Autofill
- 06:31 PM PT BMS MIGRATION & ENHANCEMENT Feature #1319 (QA Test): [ESS] - Promotion - Autofill
- dear johanes , udah bisa di test ya
ini di set value berdasarkan employee area dan employee office
makasih
07/01/2022
- 05:39 PM PT BMS MIGRATION & ENHANCEMENT Bug #1307 (QA Test): [ESS] - Promotion
- deaar jo , udah bisa di test ya
\
makasih - 05:39 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1307 (Closed): [ESS] - Promotion )
- [ESS] - Promotion
- 05:38 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1315 (Closed): [ESS - Promotion] - Autofill )
- [ESS - Promotion] - Autofill
- 05:38 PM PT BMS MIGRATION & ENHANCEMENT Feature #1315 (QA Test): [ESS - Promotion] - Autofill
- dear jo , udah bisa di test ya
makasih - 05:36 PM PT BMS MIGRATION & ENHANCEMENT Feature #1313 (QA Test): [ESS] - Promotion - Autofill
- dear jo, udah bisa di test ya
makasih - 05:36 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1313 (Closed): [ESS] - Promotion - Autofill )
- [ESS] - Promotion - Autofill
06/30/2022
- 01:54 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1231 (Closed): [ Report ] - Performance Report Monitoring)
- [ Report ] - Performance Report Monitoring
- 01:54 PM PT BMS MIGRATION & ENHANCEMENT Bug #1231 (QA Test): [ Report ] - Performance Report Monitoring
- dear mang erik , udah bisa di test ya
makasih - 11:22 AM PT BMS MIGRATION & ENHANCEMENT Bug #1210 (QA Test): [ Report ] - Performace Report Individu
- dear erik , udah semua ya , udah bisa di test
makasih - 11:22 AM PT BMS MIGRATION & ENHANCEMENT 1.30 hour (Bug #1210 (Closed): [ Report ] - Performace Report Individu)
- [ Report ] - Performace Report Individu
06/29/2022
- 12:18 PM CNAF 1.30 hour (Bug #1293 (Developing): Report Posting to GL filter Employee Office, EmployeeID from dan EmployeeID to tidak berfungsi )
- Report Posting to GL filter Employee Office, EmployeeID from dan EmployeeID to tidak berfungsi
- 12:18 PM CNAF Bug #1293 (Developing): Report Posting to GL filter Employee Office, EmployeeID from dan EmployeeID to tidak berfungsi
- dear masbin ,, udah bisa di test ya
berikut ini yang harus di deploy :
SP : Rpt_CNAF_HR_PY_PostToGL
workbench... - 07:21 AM PT BMS MIGRATION & ENHANCEMENT Bug #1231: [ Report ] - Performance Report Monitoring
- dear mang erik , itu data sesuai ketentuan di taks idnya data yg kosong jadi harus fixed pakenya yg mana
untuk in... - 07:21 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1231 (Closed): [ Report ] - Performance Report Monitoring)
- [ Report ] - Performance Report Monitoring
- 07:16 AM PT BMS MIGRATION & ENHANCEMENT 1.30 hour (Bug #1210 (Closed): [ Report ] - Performace Report Individu)
- [ Report ] - Performace Report Individu
- 07:16 AM PT BMS MIGRATION & ENHANCEMENT Bug #1210: [ Report ] - Performace Report Individu
- dear erik ,, udah bisa di cek
1. jabatan dll engga ada di omnya startdatenya 2022
2. formulir adjusted tablenya... - 03:53 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1283 (Closed): ESS Mutation - Autofill field)
- ESS Mutation - Autofill field
- 03:53 AM PT BMS MIGRATION & ENHANCEMENT Feature #1283 (QA Test): ESS Mutation - Autofill field
- dear fiona , udah bisa di test ya
makasih - 03:44 AM PT BMS MIGRATION & ENHANCEMENT Feature #1284 (QA Test): ESS Exit Clearance - Autofill field
- dear fiona , udah bisa di test ya
makasih - 03:44 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1284 (Closed): ESS Exit Clearance - Autofill field)
- ESS Exit Clearance - Autofill field
06/28/2022
- 05:38 PM Bank Kalteng (Phase 2) Support #1286 (QA Test): ESS Medical - StartDate
- dear fiona , untuk issue ini udah bisa di test ya
makasih - 05:38 PM Bank Kalteng (Phase 2) 1.00 hour (Support #1286 (Closed): ESS Medical - StartDate)
- ESS Medical - StartDate
- 03:47 PM Bank Kalteng (Phase 2) Bug #1273 (QA Test): [ESS PMS] Appraisal Peroid tidak Tampil
- dear mega , udah bisa di test ya
makasih - 03:47 PM Bank Kalteng (Phase 2) 1.30 hour (Bug #1273 (Closed): [ESS PMS] Appraisal Peroid tidak Tampil)
- [ESS PMS] Appraisal Peroid tidak Tampil
- 02:44 PM Bank Kalteng (Phase 2) Bug #1273: [ESS PMS] Appraisal Peroid tidak Tampil
- dear mega , untuk autofill itu udah ada codingannya dan pas di cek datanya employee tersebut tidak ada
jadi harap... - 11:34 AM Bank Kalteng (Phase 2) 1.30 hour (Bug #1273 (Closed): [ESS PMS] Appraisal Peroid tidak Tampil)
- [ESS PMS] Appraisal Peroid tidak Tampil
- 11:34 AM Bank Kalteng (Phase 2) Bug #1273: [ESS PMS] Appraisal Peroid tidak Tampil
- dear mega , untuk issue ini udah bisa di test ya
makasih - 03:14 PM MINOVA DEMO 1.00 hour (Feature #1240 (Closed): Costum Report Recruitment best on job)
- Costum Report Recruitment best on job
- 03:14 PM MINOVA DEMO Feature #1240: Costum Report Recruitment best on job
- dear fernando udah bisa di test ya
Makasih
06/27/2022
- 06:32 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
- BMS(Report&ESS), Demo(Report)
- 05:31 PM PT BMS MIGRATION & ENHANCEMENT Feature #1275 (QA Test): ESS Mutation - Autofill field
- dear fiona , udah bisa di test ya
makasih - 05:31 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1275 (Closed): ESS Mutation - Autofill field)
- ESS Mutation - Autofill field
- 02:54 PM PT BMS MIGRATION & ENHANCEMENT Feature #1268 (QA Test): ESS Promosi - Autofill
- dear johanes , untuk ini udah bisa di test ya
makasih - 02:54 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1268 (Closed): ESS Promosi - Autofill)
- ESS Promosi - Autofill
- 12:48 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1269 (Closed): ESS Exit Clearance )
- ESS Exit Clearance
- 12:48 PM PT BMS MIGRATION & ENHANCEMENT Bug #1269 (QA Test): ESS Exit Clearance
- dear fiona , untuk ini udah bisa di test ya
makasih
Also available in: Atom