07/18/2022

05:24 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
Membuat Script UAT BKT Phase 2 dan Memperbaiki Settingan PMS Mega Yunita
05:16 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:10 PM PT ARITA 6.00 hours (Project: PT ARITA)
ESS PMS Fiona Avangeline Jonathan
01:50 PM Bank Kalteng (Phase 2) 2.00 hours (Project: Bank Kalteng (Phase 2))
ESS Medical Fiona Avangeline Jonathan
11:51 AM Bank Kalteng (Phase 2) 1.00 hour (Bug #1363 (Closed): [ESS PMS] PMS Review Phase 2 - Hilangkan Button Add & Delete)
[ESS PMS] PMS Review Phase 2 - Hilangkan Button Add & Delete M Azid Wahyudi
11:38 AM Bank Kalteng (Phase 2) 1.30 hour (Bug #1361 (Closed): Error Claim Status)
Error Claim Status M Azid Wahyudi
10:36 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
10:05 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
Setting PMS BKT Phase 2 Mega Yunita
10:05 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
Setting PMS BKT Phase 2 Mega Yunita
10:03 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
Setting PMS di project BKT Mega Yunita
10:03 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
Testing BKT dan Setting Phase 2 Mega Yunita
10:02 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
Testing BKT dan Setting Phase 2 Mega Yunita
10:02 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
Testing BKT dan Setting Phase 2 Mega Yunita
10:02 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
Testing BKT dan Setting Phase 2 Mega Yunita
09:57 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
Setting PMS di project BKT Mega Yunita
09:57 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
09:56 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
09:56 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
09:56 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
09:56 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
09:55 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
09:55 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
09:54 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
09:54 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
09:54 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
09:54 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Visit BMS fernando sergio rumbayan
09:53 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
09:52 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
09:51 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Visit to Client BMS ericsson ericsson
09:47 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
09:46 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Visit to Client BMS ericsson ericsson
08:31 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana

07/15/2022

05:09 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
ESS - Travel Johanes Christian Kurni
03:59 PM Bank Kalteng (Phase 2) 7.00 hours (Project: Bank Kalteng (Phase 2))
ESS Travel Fiona Avangeline Jonathan
02:50 PM MINOVAES - PRODUCT 1.00 hour (Project: MINOVAES - PRODUCT)
Variant, Cost Element Fiona Avangeline Jonathan

07/14/2022

06:11 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
ESS - Travel Johanes Christian Kurni
05:13 PM PT ARITA 1.00 hour (Support #1357 (Closed): ESS Exit Clearance )
ESS Exit Clearance M Azid Wahyudi
05:00 PM Bank Kalteng (Phase 2) 2.00 hours (Bug #1274 (Closed): [ESS PMS] Validasi KPI Score di PMS Final)
[ESS PMS] Validasi KPI Score di PMS Final M Azid Wahyudi
04:45 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1360 (Closed): [ Report ] - Overtime Recap)
[ Report ] - Overtime Recap M Azid Wahyudi
04:44 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1359 (Closed): [ Report ] - Travel Recap Loading lama)
[ Report ] - Travel Recap Loading lama M Azid Wahyudi
03:13 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1356 (Closed): [ HR - Total Cost ] - Amount kelebihan NOL)
[ HR - Total Cost ] - Amount kelebihan NOL M Azid Wahyudi
02:56 PM Bank Kalteng (Phase 2) 3.00 hours (Project: Bank Kalteng (Phase 2))
ESS Medical Fiona Avangeline Jonathan
02:39 PM MINOVA DEMO 4.00 hours (Project: MINOVA DEMO)
Setting PT Wika Purchase Structure Fiona Avangeline Jonathan
12:02 PM PT ARITA 1.00 hour (Project: PT ARITA)
ESS Exit Clearance Fiona Avangeline Jonathan
11:56 AM PT ARITA 1.30 hour (Feature #1304 (Closed): ESS Exit Clearance - Autofill Field)
ESS Exit Clearance - Autofill Field M Azid Wahyudi
11:45 AM PT ARITA 1.30 hour (Feature #1305 (Closed): ESS Exit Clearance - Autofill Field)
ESS Exit Clearance - Autofill Field M Azid Wahyudi

07/13/2022

03:06 PM Bank Kalteng (Phase 2) 2.30 hours (Feature #1353 (Closed): kalkulasi pada form travel)
kalkulasi pada form travel M Azid Wahyudi
02:56 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
Setting PT Wika Purchase Structure Fiona Avangeline Jonathan
11:31 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana

07/12/2022

05:50 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
ESS - Travel Johanes Christian Kurni
05:49 PM MINOVA DEMO 7.00 hours (Project: MINOVA DEMO)
ESS Purchase Requisition - PT WIKA Fiona Avangeline Jonathan
04:20 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
02:34 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Mutation Fiona Avangeline Jonathan
02:05 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana
11:40 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Help Business development Maulina Hali
11:39 AM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
Help Business development Maulina Hali
11:38 AM Minova Corp Affairs 6.00 hours (Project: Minova Corp Affairs)
Finance & Admin Maulina Hali
11:38 AM Minova ERP Internal 4.00 hours (Project: Minova ERP Internal)
Finance Maulina Hali
11:37 AM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
Help Business development Maulina Hali
11:36 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Finance & Admin Maulina Hali
11:36 AM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
Help Business development Maulina Hali
11:35 AM Minova Corp Affairs 6.00 hours (Project: Minova Corp Affairs)
Finance & Admin Maulina Hali
10:50 AM PT BMS MIGRATION & ENHANCEMENT 1.30 hour (Bug #1342 (Closed): Training List By Job)
Training List By Job M Azid Wahyudi

07/11/2022

05:44 PM PT BIA 8.00 hours (Project: PT BIA)
Mapping data Johanes Christian Kurni
05:37 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1345 (Closed): [ESS] - Promotion )
[ESS] - Promotion M Azid Wahyudi
04:49 PM PT BIA 8.00 hours (Project: PT BIA)
OM BIA Fiona Avangeline Jonathan
04:38 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Feature #1343 (Closed): [ ESS - Overtime ] - Condition Back Date & Condition Day Type)
[ ESS - Overtime ] - Condition Back Date & Condition Day Type M Azid Wahyudi
11:03 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana

07/08/2022

05:12 PM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS - Promotion Johanes Christian Kurni
05:12 PM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
05:11 PM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
Meeting Internal fernando sergio rumbayan
05:11 PM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
Sharing Internal Johanes Christian Kurni
04:10 PM PT BIA 5.00 hours (Project: PT BIA)
OM BIA Fiona Avangeline Jonathan
04:10 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Mutation Fiona Avangeline Jonathan
04:10 PM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
Sharing Internal Fiona Avangeline Jonathan
10:34 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1341 (Closed): [ESS] - Mutation)
[ESS] - Mutation M Azid Wahyudi
10:33 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1340 (Closed): [ESS] - Promotion )
[ESS] - Promotion M Azid Wahyudi
08:58 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana

07/07/2022

05:26 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
05:26 PM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS - Promotion Johanes Christian Kurni
05:26 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
visit BMS fernando sergio rumbayan
05:24 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
Meeting - Pembahasan Modul Travel HRIS PT Bank Kalteng Johanes Christian Kurni
04:42 PM PT BIA 6.00 hours (Project: PT BIA)
OM BIA Fiona Avangeline Jonathan
02:47 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Mutation Fiona Avangeline Jonathan
02:38 PM Bank Kalteng (Phase 2) 8.00 hours (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
Fixing Budget Calculation Tri Rizqiaty
02:34 PM BANK KALTENG 8.00 hours (Bug #1327 (Closed): [HR-COMPENSATION] Calculation masih ada yg kurang sesuai)
Fixing Compensation Calculate Tri Rizqiaty
11:59 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1338 (Closed): ESS Mutation - Autofill field)
ESS Mutation - Autofill field M Azid Wahyudi
11:35 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1339 (Closed): [ESS] - Promotion )
[ESS] - Promotion M Azid Wahyudi

07/06/2022

06:01 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana
05:55 PM PT BIA 2.00 hours (Project: PT BIA)
Mapping data Johanes Christian Kurni
05:54 PM BANK KALTENG 6.00 hours (Project: BANK KALTENG)
ESS - Travel Johanes Christian Kurni
05:25 PM PT BIA 8.00 hours (Project: PT BIA)
OM BIA Fiona Avangeline Jonathan
05:08 PM Bank Kalteng (Phase 2) 1.00 hour (Bug #1297 (Closed): [ESS] - Travel)
[ESS] - Travel M Azid Wahyudi
04:16 PM Bank Kalteng (Phase 2) 2.00 hours (Feature #1295 (Closed): [ESS PMS] PMS Final Phase 2)
[ESS PMS] PMS Final Phase 2 M Azid Wahyudi
03:28 PM Bank Kalteng (Phase 2) 4.00 hours (Feature #1291 (Closed): [ESS PMS] PMS Review Phase 2)
[ESS PMS] PMS Review Phase 2 M Azid Wahyudi
02:41 PM BANK KALTENG 5.00 hours (Bug #1327 (Closed): [HR-COMPENSATION] Calculation masih ada yg kurang sesuai)
Fixing Compensation Calculate Tri Rizqiaty

07/05/2022

05:52 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS - Staff Requisition Johanes Christian Kurni
05:52 PM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS - Promotion Johanes Christian Kurni
05:47 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1311 (Closed): ESS Exit Clearance - Show Deskripsi)
ESS Exit Clearance - Show Deskrips M Azid Wahyudi
05:41 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana
05:35 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1312 (Closed): ESS Mutation - Autofill field)
ESS Mutation - Autofill field M Azid Wahyudi
04:57 PM BANK KALTENG 8.00 hours (Bug #1327 (Closed): [HR-COMPENSATION] Calculation masih ada yg kurang sesuai)
Fixing Compensation Calculate Tri Rizqiaty
04:52 PM BANK KALTENG 8.00 hours (Bug #1327 (Closed): [HR-COMPENSATION] Calculation masih ada yg kurang sesuai)
Fixing Compensation Calculate Tri Rizqiaty
04:43 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1333 (Closed): [ESS] - Mutation)
[ESS] - Mutation M Azid Wahyudi
04:42 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1332 (Closed): [ESS] - Exit Clearance)
[ESS] - Exit Clearance M Azid Wahyudi
04:41 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1331 (Closed): [ESS] - Promotion )
[ESS] - Promotion M Azid Wahyudi
04:35 PM MINOVAES - PRODUCT 1.00 hour (Project: MINOVAES - PRODUCT)
Design Mock up Mini Product Fiona Avangeline Jonathan
03:57 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:57 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:57 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:56 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:55 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:55 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:54 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:49 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:49 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:49 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:48 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:48 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:47 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:47 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:46 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:45 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS fernando sergio rumbayan
03:44 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:44 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:43 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:43 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:43 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:43 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:43 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:42 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:42 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:42 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:40 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:40 PM PT BIA 8.00 hours (Project: PT BIA)
VISIT BIA fernando sergio rumbayan
03:40 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:40 PM PT BIA 8.00 hours (Project: PT BIA)
VISIT BIA fernando sergio rumbayan
03:38 PM PT BIA 8.00 hours (Project: PT BIA)
VISIT BIA fernando sergio rumbayan
03:37 PM PT BIA 8.00 hours (Project: PT BIA)
VISIT BIA fernando sergio rumbayan
03:36 PM PT BIA 8.00 hours (Project: PT BIA)
VISIT BIA fernando sergio rumbayan
03:36 PM PT BIA 8.00 hours (Project: PT BIA)
VISIT BIA fernando sergio rumbayan
03:30 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:29 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
Membuat Script UAT BKT Phase 2 Mega Yunita
03:29 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:29 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
Setting PMS BKT Phase 2 Mega Yunita
03:29 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:28 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
03:28 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
Testing BKT dan Setting Phase 2 Mega Yunita
03:27 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
Testing BKT dan Setting Phase 2 Mega Yunita
03:27 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
Testing BKT Phase 2 Mega Yunita
03:27 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
Setting PMS di project BKT Mega Yunita
03:26 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
Testing PMS BKT Phase 2 Mega Yunita
03:26 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
Testing BKT dan Setting Phase 2 Mega Yunita
03:25 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
Testing BKT dan Setting Phase 2 Mega Yunita
03:25 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
Testing BKT dan Setting Phase 2 Mega Yunita
03:24 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
Testing BKT dan Setting Phase 2 Mega Yunita
03:23 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
Testing BKT Phase 2 Mega Yunita
03:23 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
Testing dan Setting BKT Phase 2 Mega Yunita
03:22 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
Testing dan Setting BKT Phase 2 Mega Yunita
03:21 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
Testing BKT Phase 2 Mega Yunita
03:15 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Bug #1231 (Closed): [ Report ] - Performance Report Monitoring)
[ Report ] - Performance Report Monitoring M Azid Wahyudi
03:15 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
UAT Script Fiona Avangeline Jonathan
03:14 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Promotion Fiona Avangeline Jonathan
10:41 AM PT ARITA 0.30 hour (Project: PT ARITA)
Muhammad Bintar
10:40 AM HINO Bugs 1.00 hour (Project: HINO Bugs)
pengecekan employee yang tidak ketemu atasan nya Muhammad Bintar
10:33 AM HINO Bugs 2.00 hours (Project: HINO Bugs)
pengecekan untuk deploy service generate cuti prorate Muhammad Bintar
10:28 AM PERTALIFE 2.00 hours (Project: PERTALIFE)
pengecekan aplikasi mobile karena tidak ada history di menu attendance history. Muhammad Bintar
08:24 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana

07/04/2022

06:31 PM PT BMS MIGRATION & ENHANCEMENT 1.30 hour (Feature #1319 (Closed): [ESS] - Promotion - Autofill )
[ESS] - Promotion - Autofill M Azid Wahyudi
05:46 PM MINOVAES - PRODUCT 3.00 hours (Project: MINOVAES - PRODUCT)
Design Mock up Mini Product Fiona Avangeline Jonathan
05:37 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS - Promotion Johanes Christian Kurni
01:48 PM PT ARITA 1.00 hour (Project: PT ARITA)
ESS Exit Clearance Fiona Avangeline Jonathan
11:51 AM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Mutation Fiona Avangeline Jonathan
11:51 AM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Exit Clearance Fiona Avangeline Jonathan
11:48 AM PT BMS MIGRATION & ENHANCEMENT 5.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS - Staff Requisition Johanes Christian Kurni
11:47 AM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS - Promotion Johanes Christian Kurni
11:45 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS - Staff Requisition Johanes Christian Kurni
11:45 AM PT BMS MIGRATION & ENHANCEMENT 7.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS - Promotion Johanes Christian Kurni
11:42 AM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS - Staff Requisition Johanes Christian Kurni
11:42 AM PT BMS MIGRATION & ENHANCEMENT 5.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS - Promotion Johanes Christian Kurni
11:40 AM PT BIA 1.00 hour (Project: PT BIA)
Hide menu OM dan Personal Administration Johanes Christian Kurni
11:37 AM PT BMS MIGRATION & ENHANCEMENT 5.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS - Promotion Johanes Christian Kurni
11:35 AM BANK KALTENG 3.00 hours (Project: BANK KALTENG)
ESS - Travel Johanes Christian Kurni
11:30 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS - Promotion] Johanes Christian Kurni
11:26 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Finance & Admin Maulina Hali
11:25 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Finance & Admin Maulina Hali
11:25 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Admin Maulina Hali
11:24 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Finance & Admin Maulina Hali
11:24 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Finance & Admin Maulina Hali
11:23 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Finance & Admin Maulina Hali
11:10 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Finance & Admin Maulina Hali
11:09 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Finance & Admin Maulina Hali

07/01/2022

05:49 PM PT BIA 3.00 hours (Project: PT BIA)
OM Fiona Avangeline Jonathan
05:39 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1307 (Closed): [ESS] - Promotion )
[ESS] - Promotion M Azid Wahyudi
05:38 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1315 (Closed): [ESS - Promotion] - Autofill )
[ESS - Promotion] - Autofill M Azid Wahyudi
05:37 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Exit Clearance Fiona Avangeline Jonathan
05:36 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1313 (Closed): [ESS] - Promotion - Autofill )
[ESS] - Promotion - Autofill M Azid Wahyudi
05:35 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Internal UAT ESS Fiona Avangeline Jonathan
05:31 PM Bank Kalteng (Phase 2) 1.00 hour (Bug #1308 (Closed): [HR PMS] Hide Action Add)
Fixing Hide Button PMS HR Tri Rizqiaty
05:23 PM Bank Kalteng (Phase 2) 6.00 hours (Bug #1308 (Closed): [HR PMS] Hide Action Add)
Fixing Hide Button PMS HR Tri Rizqiaty
05:29 PM CNAF 1.00 hour (Project: CNAF)
Checking Selisih GL CNAF Tri Rizqiaty
10:20 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana

06/30/2022

05:24 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Travel Fiona Avangeline Jonathan
03:40 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Bug #1296 (Closed): Training Management)
Fixing Instructor Evaluation Training Tri Rizqiaty
03:36 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1299 (Closed): Job Catalog )
Fixing Proficiency Qual Di Job Catalog Tri Rizqiaty
03:35 PM PT BMS MIGRATION & ENHANCEMENT 1.50 hour (Bug #1299 (Closed): Job Catalog )
Fixing Proficiency Qual Di Job Catalog Tri Rizqiaty
02:35 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Mutation Fiona Avangeline Jonathan
02:35 PM PT ARITA 5.00 hours (Project: PT ARITA)
ESS Exit Clearance Fiona Avangeline Jonathan
01:54 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1231 (Closed): [ Report ] - Performance Report Monitoring)
[ Report ] - Performance Report Monitoring M Azid Wahyudi
11:22 AM PT BMS MIGRATION & ENHANCEMENT 1.30 hour (Bug #1210 (Closed): [ Report ] - Performace Report Individu)
[ Report ] - Performace Report Individu M Azid Wahyudi
09:39 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana

06/29/2022

04:32 PM CNAF 6.50 hours (Bug #1262 (Deploy): [PAYROLL] Prorate BPJS Pensiun)
Fixing Prorate BPJS CNAF Tri Rizqiaty
04:07 PM Bank Kalteng (Phase 2) 5.00 hours (Project: Bank Kalteng (Phase 2))
ESS Medical Fiona Avangeline Jonathan
12:18 PM CNAF 1.30 hour (Bug #1293 (Developing): Report Posting to GL filter Employee Office, EmployeeID from dan EmployeeID to tidak berfungsi )
Report Posting to GL filter Employee Office, EmployeeID from dan EmployeeID to tidak berfungsi M Azid Wahyudi
10:13 AM BANK FAMA 8.00 hours (Bug #1263 (Deploy): [PAYROLL] Perhitungan Functional Cost untuk case periode payroll tengah bulan)
Fixing Perhitungan Periode Awal Pajak, Angka Pajak, FCR, Hiring, Terminate (Period Payrol 16-15) Tri Rizqiaty
10:12 AM BANK FAMA 5.00 hours (Bug #1263 (Deploy): [PAYROLL] Perhitungan Functional Cost untuk case periode payroll tengah bulan)
Fixing Perhitungan Periode Awal Pajak, Angka Pajak, FCR, Hiring, Terminate (Period Payrol 16-15) Tri Rizqiaty
10:07 AM BANK FAMA 8.00 hours (Bug #1263 (Deploy): [PAYROLL] Perhitungan Functional Cost untuk case periode payroll tengah bulan)
Fixing Perhitungan Periode Awal Pajak, Angka Pajak, FCR, Hiring, Terminate (Period Payrol 16-15) Tri Rizqiaty
10:06 AM BANK FAMA 8.00 hours (Bug #1263 (Deploy): [PAYROLL] Perhitungan Functional Cost untuk case periode payroll tengah bulan)
Fixing Perhitungan Periode Awal Pajak, Angka Pajak, FCR, Hiring (Period Payrol 16-15) Tri Rizqiaty
10:05 AM BANK FAMA 8.00 hours (Bug #1263 (Deploy): [PAYROLL] Perhitungan Functional Cost untuk case periode payroll tengah bulan)
Fixing Perhitungan Periode Awal Pajak & FCR (Period Payrol 16-15) Tri Rizqiaty
10:10 AM Minova ERP Internal 3.00 hours (Project: Minova ERP Internal)
Meeting Koordinasi Tri Rizqiaty
10:03 AM Bank Kalteng (Phase 2) 8.00 hours (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
Fixing Report Budget Tri Rizqiaty
10:02 AM Bank Kalteng (Phase 2) 8.00 hours (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
Fixing Budget Calculation & Report Budget Tri Rizqiaty
09:54 AM Bank Kalteng (Phase 2) 8.00 hours (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
Fixing Budget Calculation Tri Rizqiaty
09:55 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana
07:21 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1231 (Closed): [ Report ] - Performance Report Monitoring)
[ Report ] - Performance Report Monitoring M Azid Wahyudi
07:16 AM PT BMS MIGRATION & ENHANCEMENT 1.30 hour (Bug #1210 (Closed): [ Report ] - Performace Report Individu)
[ Report ] - Performace Report Individu M Azid Wahyudi
03:53 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1283 (Closed): ESS Mutation - Autofill field)
ESS Mutation - Autofill field M Azid Wahyudi
03:44 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1284 (Closed): ESS Exit Clearance - Autofill field)
ESS Exit Clearance - Autofill field M Azid Wahyudi

06/28/2022

05:53 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Mutation Fiona Avangeline Jonathan
05:52 PM Bank Kalteng (Phase 2) 4.00 hours (Project: Bank Kalteng (Phase 2))
ESS Medical Fiona Avangeline Jonathan
05:38 PM Bank Kalteng (Phase 2) 1.00 hour (Support #1286 (Closed): ESS Medical - StartDate)
ESS Medical - StartDate M Azid Wahyudi
03:47 PM Bank Kalteng (Phase 2) 1.30 hour (Bug #1273 (Closed): [ESS PMS] Appraisal Peroid tidak Tampil)
[ESS PMS] Appraisal Peroid tidak Tampil M Azid Wahyudi
11:34 AM Bank Kalteng (Phase 2) 1.30 hour (Bug #1273 (Closed): [ESS PMS] Appraisal Peroid tidak Tampil)
[ESS PMS] Appraisal Peroid tidak Tampil M Azid Wahyudi
03:14 PM MINOVA DEMO 1.00 hour (Feature #1240 (Closed): Costum Report Recruitment best on job)
Costum Report Recruitment best on job M Azid Wahyudi

06/27/2022

06:32 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
BMS(Report&ESS), Demo(Report) M Azid Wahyudi
05:33 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Mutation Fiona Avangeline Jonathan
05:33 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Exit Clearance Fiona Avangeline Jonathan
05:31 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1275 (Closed): ESS Mutation - Autofill field)
ESS Mutation - Autofill field M Azid Wahyudi
05:27 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
Seeting & Testing Recruitment & Master Data fernando sergio rumbayan
02:54 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1268 (Closed): ESS Promosi - Autofill)
ESS Promosi - Autofill M Azid Wahyudi
12:48 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1269 (Closed): ESS Exit Clearance )
ESS Exit Clearance M Azid Wahyudi
08:51 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana

06/24/2022

07:10 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1251 (Closed): [ESS] - Staff Requisition )
[ESS] - Staff Requisition M Azid Wahyudi
07:03 PM PT BMS MIGRATION & ENHANCEMENT 1.30 hour (Feature #1267 (Closed): ESS Exit Clearance, ESS Mutasi - Autofill )
ESS Exit Clearance, ESS Mutasi - Autofill M Azid Wahyudi
04:59 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Staff Requisition Johanes Christian Kurni
04:58 PM PT BMS MIGRATION & ENHANCEMENT 5.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Promotion Johanes Christian Kurni
04:58 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Mutation Fiona Avangeline Jonathan
04:58 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Exit Clearance Fiona Avangeline Jonathan
04:58 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Travel Johanes Christian Kurni
03:58 PM Bank Kalteng (Phase 2) 2.00 hours (Project: Bank Kalteng (Phase 2))
ESS Medical Fiona Avangeline Jonathan
03:55 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Travel Fiona Avangeline Jonathan
02:15 PM PT BMS MIGRATION & ENHANCEMENT 7.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Promotion Johanes Christian Kurni
02:14 PM BANK KALTENG 1.00 hour (Project: BANK KALTENG)
Organization Structure Johanes Christian Kurni
11:10 AM BANK FAMA 1.00 hour (Bug #1215 (QA Test): Report Leave - Kuota Cuti Exist Double di report)
Report Leave - Kuota Cuti Exist Double di report M Azid Wahyudi
10:30 AM BANK FAMA 1.00 hour (Bug #1229 (Deploy): Report All Employee - Data KTP Tidak masuk ke Report Tapi data ada di Master Data Employee PHRPA0001)
Report All Employee - Data KTP Tidak masuk ke Report Tapi data ada di Master Data Employee PHRPA0001 M Azid Wahyudi

06/23/2022

10:32 PM HINO Bugs 1.00 hour (Feature #1266 (Closed): [CR] ESS Overtime untuk merubah validasi pemilihan startdate pengajuan menjadi 60 hari backdate)
[CR] ESS Overtime untuk merubah validasi pemilihan startdate pengajuan menjadi 60 hari backdate M Azid Wahyudi
05:36 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana
05:29 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Bug #1251 (Closed): [ESS] - Staff Requisition )
[ESS] - Staff Requisition M Azid Wahyudi
05:27 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
Report PMS Fiona Avangeline Jonathan
05:26 PM PT BMS MIGRATION & ENHANCEMENT 5.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Fiona Avangeline Jonathan
10:36 AM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
Organization Structure Fiona Avangeline Jonathan
10:04 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana

06/22/2022

11:43 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Bug #1231 (Closed): [ Report ] - Performance Report Monitoring)
[ Report ] - Performance Report Monitoring M Azid Wahyudi
05:52 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Promotion Johanes Christian Kurni
05:51 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Travel Johanes Christian Kurni
05:50 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Staff Requisition Johanes Christian Kurni
05:50 PM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Promotion Johanes Christian Kurni
05:43 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Exit Clearance Fiona Avangeline Jonathan
05:02 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Finance & Admin Maulina Hali
05:01 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Finance Maulina Hali
05:00 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Finance & Admin Maulina Hali
04:59 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Finance Maulina Hali
04:59 PM Minova Corp Affairs 6.00 hours (Project: Minova Corp Affairs)
HR & Support Marketing Maulina Hali
04:58 PM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
Meeting Karyawan Juni 2022 Maulina Hali
04:20 PM PT BMS MIGRATION & ENHANCEMENT 1.30 hour (Feature #1258 (Closed): ESS Mutation - Autofill field)
ESS Mutation - Autofill field M Azid Wahyudi
09:42 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
ESS Medical Fiona Avangeline Jonathan
08:38 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana

06/21/2022

08:32 PM CLIENT SUPPORT 8.00 hours (Project: CLIENT SUPPORT)
CS Support User ikawati basri
08:31 PM CLIENT SUPPORT 8.00 hours (Project: CLIENT SUPPORT)
CS Support User ikawati basri
08:31 PM CLIENT SUPPORT 8.00 hours (Project: CLIENT SUPPORT)
CS Support User ikawati basri
08:31 PM CLIENT SUPPORT 8.00 hours (Project: CLIENT SUPPORT)
CS Support User ikawati basri
08:31 PM CLIENT SUPPORT 8.00 hours (Project: CLIENT SUPPORT)
CS Support User ikawati basri
08:30 PM CLIENT SUPPORT 8.00 hours (Project: CLIENT SUPPORT)
CS Support User ikawati basri
05:17 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
Data Migrasi Johanes Christian Kurni
05:16 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Promotion Johanes Christian Kurni
05:15 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Staff Requisition Johanes Christian Kurni
05:14 PM BANK KALTENG 1.00 hour (Project: BANK KALTENG)
Data Migrasi Johanes Christian Kurni
05:12 PM PT BMS MIGRATION & ENHANCEMENT 7.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
[ESS] - Staff Requisition Johanes Christian Kurni
11:07 AM ROHTO 6.00 hours (Feature #1172 (Closed): [CR] Penambahan Menu Report Leave Khusus Rohto)
[CR] Penambahan Menu Report Leave Khusus Rohto M Azid Wahyudi
08:45 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana
03:10 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1253 (Closed): ESS Mutation - Lookup Employee ID)
ESS Mutation - Lookup Employee ID M Azid Wahyudi

06/20/2022

05:19 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ESS Mutation Fiona Avangeline Jonathan
02:12 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana
01:56 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
Data Migration Fiona Avangeline Jonathan
11:12 AM Bank Kalteng (Phase 2) 8.00 hours (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
Fixing Budget Calculation Tri Rizqiaty
11:11 AM Bank Kalteng (Phase 2) 8.00 hours (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
Fixing Budget Calculation Tri Rizqiaty
11:09 AM Bank Kalteng (Phase 2) 1.00 hour (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
Fixing Budget Calculation Tri Rizqiaty
11:09 AM Minova ERP Internal 2.50 hours (Project: Minova ERP Internal)
Meeting Karyawan Tri Rizqiaty
09:12 AM Asuransi Bintang - Existing 1.00 hour (Feature #1249 (QA Test): Penambahan Kolom pada report " Job Desc Individu ")
Penambahan Kolom pada report " Job Desc Individu " M Azid Wahyudi
 