- 05:24 PM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Membuat Script UAT BKT Phase 2 dan Memperbaiki Settingan PMS
- 05:16 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:10 PM PT ARITA 6.00 hours (Project: PT ARITA)
- ESS PMS
- 01:50 PM Bank Kalteng (Phase 2) 2.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Medical
- 11:51 AM Bank Kalteng (Phase 2) 1.00 hour (Bug #1363 (Closed): [ESS PMS] PMS Review Phase 2 - Hilangkan Button Add & Delete)
- [ESS PMS] PMS Review Phase 2 - Hilangkan Button Add & Delete
- 11:38 AM Bank Kalteng (Phase 2) 1.30 hour (Bug #1361 (Closed): Error Claim Status)
- Error Claim Status
- 10:36 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 10:05 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Setting PMS BKT Phase 2
- 10:05 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Setting PMS BKT Phase 2
- 10:03 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Setting PMS di project BKT
- 10:03 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Testing BKT dan Setting Phase 2
- 10:02 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Testing BKT dan Setting Phase 2
- 10:02 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Testing BKT dan Setting Phase 2
- 10:02 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Testing BKT dan Setting Phase 2
- 09:57 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- Setting PMS di project BKT
- 09:57 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 09:56 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 09:56 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 09:56 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 09:56 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 09:55 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 09:55 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 09:54 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 09:54 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 09:54 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 09:54 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Visit BMS
- 09:53 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 09:52 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 09:51 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Visit to Client BMS
- 09:47 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 09:46 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Visit to Client BMS
- 08:31 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
07/15/2022
- 05:09 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- ESS - Travel
- 03:59 PM Bank Kalteng (Phase 2) 7.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Travel
- 02:50 PM MINOVAES - PRODUCT 1.00 hour (Project: MINOVAES - PRODUCT)
- Variant, Cost Element
07/14/2022
- 06:11 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- ESS - Travel
- 05:13 PM PT ARITA 1.00 hour (Support #1357 (Closed): ESS Exit Clearance )
- ESS Exit Clearance
- 05:00 PM Bank Kalteng (Phase 2) 2.00 hours (Bug #1274 (Closed): [ESS PMS] Validasi KPI Score di PMS Final)
- [ESS PMS] Validasi KPI Score di PMS Final
- 04:45 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1360 (Closed): [ Report ] - Overtime Recap)
- [ Report ] - Overtime Recap
- 04:44 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1359 (Closed): [ Report ] - Travel Recap Loading lama)
- [ Report ] - Travel Recap Loading lama
- 03:13 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1356 (Closed): [ HR - Total Cost ] - Amount kelebihan NOL)
- [ HR - Total Cost ] - Amount kelebihan NOL
- 02:56 PM Bank Kalteng (Phase 2) 3.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Medical
- 02:39 PM MINOVA DEMO 4.00 hours (Project: MINOVA DEMO)
- Setting PT Wika Purchase Structure
- 12:02 PM PT ARITA 1.00 hour (Project: PT ARITA)
- ESS Exit Clearance
- 11:56 AM PT ARITA 1.30 hour (Feature #1304 (Closed): ESS Exit Clearance - Autofill Field)
- ESS Exit Clearance - Autofill Field
- 11:45 AM PT ARITA 1.30 hour (Feature #1305 (Closed): ESS Exit Clearance - Autofill Field)
- ESS Exit Clearance - Autofill Field
07/13/2022
- 03:06 PM Bank Kalteng (Phase 2) 2.30 hours (Feature #1353 (Closed): kalkulasi pada form travel)
- kalkulasi pada form travel
- 02:56 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
- Setting PT Wika Purchase Structure
- 11:31 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
07/12/2022
- 05:50 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- ESS - Travel
- 05:49 PM MINOVA DEMO 7.00 hours (Project: MINOVA DEMO)
- ESS Purchase Requisition - PT WIKA
- 04:20 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 02:34 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Mutation
- 02:05 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 11:40 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Help Business development
- 11:39 AM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
- Help Business development
- 11:38 AM Minova Corp Affairs 6.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 11:38 AM Minova ERP Internal 4.00 hours (Project: Minova ERP Internal)
- Finance
- 11:37 AM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
- Help Business development
- 11:36 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 11:36 AM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
- Help Business development
- 11:35 AM Minova Corp Affairs 6.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 10:50 AM PT BMS MIGRATION & ENHANCEMENT 1.30 hour (Bug #1342 (Closed): Training List By Job)
- Training List By Job
07/11/2022
- 05:44 PM PT BIA 8.00 hours (Project: PT BIA)
- Mapping data
- 05:37 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1345 (Closed): [ESS] - Promotion )
- [ESS] - Promotion
- 04:49 PM PT BIA 8.00 hours (Project: PT BIA)
- OM BIA
- 04:38 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Feature #1343 (Closed): [ ESS - Overtime ] - Condition Back Date & Condition Day Type)
- [ ESS - Overtime ] - Condition Back Date & Condition Day Type
- 11:03 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
07/08/2022
- 05:12 PM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Promotion
- 05:12 PM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 05:11 PM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
- Meeting Internal
- 05:11 PM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
- Sharing Internal
- 04:10 PM PT BIA 5.00 hours (Project: PT BIA)
- OM BIA
- 04:10 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Mutation
- 04:10 PM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
- Sharing Internal
- 10:34 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1341 (Closed): [ESS] - Mutation)
- [ESS] - Mutation
- 10:33 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1340 (Closed): [ESS] - Promotion )
- [ESS] - Promotion
- 08:58 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
07/07/2022
- 05:26 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 05:26 PM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Promotion
- 05:26 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- visit BMS
- 05:24 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
- Meeting - Pembahasan Modul Travel HRIS PT Bank Kalteng
- 04:42 PM PT BIA 6.00 hours (Project: PT BIA)
- OM BIA
- 02:47 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Mutation
- 02:38 PM Bank Kalteng (Phase 2) 8.00 hours (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
- Fixing Budget Calculation
- 02:34 PM BANK KALTENG 8.00 hours (Bug #1327 (Closed): [HR-COMPENSATION] Calculation masih ada yg kurang sesuai)
- Fixing Compensation Calculate
- 11:59 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1338 (Closed): ESS Mutation - Autofill field)
- ESS Mutation - Autofill field
- 11:35 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1339 (Closed): [ESS] - Promotion )
- [ESS] - Promotion
07/06/2022
- 06:01 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 05:55 PM PT BIA 2.00 hours (Project: PT BIA)
- Mapping data
- 05:54 PM BANK KALTENG 6.00 hours (Project: BANK KALTENG)
- ESS - Travel
- 05:25 PM PT BIA 8.00 hours (Project: PT BIA)
- OM BIA
- 05:08 PM Bank Kalteng (Phase 2) 1.00 hour (Bug #1297 (Closed): [ESS] - Travel)
- [ESS] - Travel
- 04:16 PM Bank Kalteng (Phase 2) 2.00 hours (Feature #1295 (Closed): [ESS PMS] PMS Final Phase 2)
- [ESS PMS] PMS Final Phase 2
- 03:28 PM Bank Kalteng (Phase 2) 4.00 hours (Feature #1291 (Closed): [ESS PMS] PMS Review Phase 2)
- [ESS PMS] PMS Review Phase 2
- 02:41 PM BANK KALTENG 5.00 hours (Bug #1327 (Closed): [HR-COMPENSATION] Calculation masih ada yg kurang sesuai)
- Fixing Compensation Calculate
07/05/2022
- 05:52 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Staff Requisition
- 05:52 PM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Promotion
- 05:47 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1311 (Closed): ESS Exit Clearance - Show Deskripsi)
- ESS Exit Clearance - Show Deskrips
- 05:41 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 05:35 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1312 (Closed): ESS Mutation - Autofill field)
- ESS Mutation - Autofill field
- 04:57 PM BANK KALTENG 8.00 hours (Bug #1327 (Closed): [HR-COMPENSATION] Calculation masih ada yg kurang sesuai)
- Fixing Compensation Calculate
- 04:52 PM BANK KALTENG 8.00 hours (Bug #1327 (Closed): [HR-COMPENSATION] Calculation masih ada yg kurang sesuai)
- Fixing Compensation Calculate
- 04:43 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1333 (Closed): [ESS] - Mutation)
- [ESS] - Mutation
- 04:42 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1332 (Closed): [ESS] - Exit Clearance)
- [ESS] - Exit Clearance
- 04:41 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1331 (Closed): [ESS] - Promotion )
- [ESS] - Promotion
- 04:35 PM MINOVAES - PRODUCT 1.00 hour (Project: MINOVAES - PRODUCT)
- Design Mock up Mini Product
- 03:57 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:57 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:57 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:56 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:55 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:55 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:54 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:49 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:49 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:49 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:48 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:48 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:47 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:47 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:46 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:45 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:44 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:44 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:43 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:43 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:43 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:43 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:43 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:42 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:42 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:42 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:40 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:40 PM PT BIA 8.00 hours (Project: PT BIA)
- VISIT BIA
- 03:40 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:40 PM PT BIA 8.00 hours (Project: PT BIA)
- VISIT BIA
- 03:38 PM PT BIA 8.00 hours (Project: PT BIA)
- VISIT BIA
- 03:37 PM PT BIA 8.00 hours (Project: PT BIA)
- VISIT BIA
- 03:36 PM PT BIA 8.00 hours (Project: PT BIA)
- VISIT BIA
- 03:36 PM PT BIA 8.00 hours (Project: PT BIA)
- VISIT BIA
- 03:30 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:29 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Membuat Script UAT BKT Phase 2
- 03:29 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:29 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Setting PMS BKT Phase 2
- 03:29 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:28 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:28 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing BKT dan Setting Phase 2
- 03:27 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing BKT dan Setting Phase 2
- 03:27 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing BKT Phase 2
- 03:27 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Setting PMS di project BKT
- 03:26 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing PMS BKT Phase 2
- 03:26 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing BKT dan Setting Phase 2
- 03:25 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing BKT dan Setting Phase 2
- 03:25 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing BKT dan Setting Phase 2
- 03:24 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing BKT dan Setting Phase 2
- 03:23 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing BKT Phase 2
- 03:23 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing dan Setting BKT Phase 2
- 03:22 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing dan Setting BKT Phase 2
- 03:21 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing BKT Phase 2
- 03:15 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Bug #1231 (Closed): [ Report ] - Performance Report Monitoring)
- [ Report ] - Performance Report Monitoring
- 03:15 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- UAT Script
- 03:14 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Promotion
- 10:41 AM PT ARITA 0.30 hour (Project: PT ARITA)
- 10:40 AM HINO Bugs 1.00 hour (Project: HINO Bugs)
- pengecekan employee yang tidak ketemu atasan nya
- 10:33 AM HINO Bugs 2.00 hours (Project: HINO Bugs)
- pengecekan untuk deploy service generate cuti prorate
- 10:28 AM PERTALIFE 2.00 hours (Project: PERTALIFE)
- pengecekan aplikasi mobile karena tidak ada history di menu attendance history.
- 08:24 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
07/04/2022
- 06:31 PM PT BMS MIGRATION & ENHANCEMENT 1.30 hour (Feature #1319 (Closed): [ESS] - Promotion - Autofill )
- [ESS] - Promotion - Autofill
- 05:46 PM MINOVAES - PRODUCT 3.00 hours (Project: MINOVAES - PRODUCT)
- Design Mock up Mini Product
- 05:37 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Promotion
- 01:48 PM PT ARITA 1.00 hour (Project: PT ARITA)
- ESS Exit Clearance
- 11:51 AM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Mutation
- 11:51 AM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Exit Clearance
- 11:48 AM PT BMS MIGRATION & ENHANCEMENT 5.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Staff Requisition
- 11:47 AM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Promotion
- 11:45 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Staff Requisition
- 11:45 AM PT BMS MIGRATION & ENHANCEMENT 7.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Promotion
- 11:42 AM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Staff Requisition
- 11:42 AM PT BMS MIGRATION & ENHANCEMENT 5.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Promotion
- 11:40 AM PT BIA 1.00 hour (Project: PT BIA)
- Hide menu OM dan Personal Administration
- 11:37 AM PT BMS MIGRATION & ENHANCEMENT 5.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Promotion
- 11:35 AM BANK KALTENG 3.00 hours (Project: BANK KALTENG)
- ESS - Travel
- 11:30 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS - Promotion]
- 11:26 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 11:25 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 11:25 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Admin
- 11:24 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 11:24 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 11:23 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 11:10 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 11:09 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
07/01/2022
- 05:49 PM PT BIA 3.00 hours (Project: PT BIA)
- OM
- 05:39 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1307 (Closed): [ESS] - Promotion )
- [ESS] - Promotion
- 05:38 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1315 (Closed): [ESS - Promotion] - Autofill )
- [ESS - Promotion] - Autofill
- 05:37 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Exit Clearance
- 05:36 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1313 (Closed): [ESS] - Promotion - Autofill )
- [ESS] - Promotion - Autofill
- 05:35 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Internal UAT ESS
- 05:31 PM Bank Kalteng (Phase 2) 1.00 hour (Bug #1308 (Closed): [HR PMS] Hide Action Add)
- Fixing Hide Button PMS HR
- 05:23 PM Bank Kalteng (Phase 2) 6.00 hours (Bug #1308 (Closed): [HR PMS] Hide Action Add)
- Fixing Hide Button PMS HR
- 05:29 PM CNAF 1.00 hour (Project: CNAF)
- Checking Selisih GL CNAF
- 10:20 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
06/30/2022
- 05:24 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Travel
- 03:40 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Bug #1296 (Closed): Training Management)
- Fixing Instructor Evaluation Training
- 03:36 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1299 (Closed): Job Catalog )
- Fixing Proficiency Qual Di Job Catalog
- 03:35 PM PT BMS MIGRATION & ENHANCEMENT 1.50 hour (Bug #1299 (Closed): Job Catalog )
- Fixing Proficiency Qual Di Job Catalog
- 02:35 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Mutation
- 02:35 PM PT ARITA 5.00 hours (Project: PT ARITA)
- ESS Exit Clearance
- 01:54 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1231 (Closed): [ Report ] - Performance Report Monitoring)
- [ Report ] - Performance Report Monitoring
- 11:22 AM PT BMS MIGRATION & ENHANCEMENT 1.30 hour (Bug #1210 (Closed): [ Report ] - Performace Report Individu)
- [ Report ] - Performace Report Individu
- 09:39 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
06/29/2022
- 04:32 PM CNAF 6.50 hours (Bug #1262 (Deploy): [PAYROLL] Prorate BPJS Pensiun)
- Fixing Prorate BPJS CNAF
- 04:07 PM Bank Kalteng (Phase 2) 5.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Medical
- 12:18 PM CNAF 1.30 hour (Bug #1293 (Developing): Report Posting to GL filter Employee Office, EmployeeID from dan EmployeeID to tidak berfungsi )
- Report Posting to GL filter Employee Office, EmployeeID from dan EmployeeID to tidak berfungsi
- 10:13 AM BANK FAMA 8.00 hours (Bug #1263 (Deploy): [PAYROLL] Perhitungan Functional Cost untuk case periode payroll tengah bulan)
- Fixing Perhitungan Periode Awal Pajak, Angka Pajak, FCR, Hiring, Terminate (Period Payrol 16-15)
- 10:12 AM BANK FAMA 5.00 hours (Bug #1263 (Deploy): [PAYROLL] Perhitungan Functional Cost untuk case periode payroll tengah bulan)
- Fixing Perhitungan Periode Awal Pajak, Angka Pajak, FCR, Hiring, Terminate (Period Payrol 16-15)
- 10:07 AM BANK FAMA 8.00 hours (Bug #1263 (Deploy): [PAYROLL] Perhitungan Functional Cost untuk case periode payroll tengah bulan)
- Fixing Perhitungan Periode Awal Pajak, Angka Pajak, FCR, Hiring, Terminate (Period Payrol 16-15)
- 10:06 AM BANK FAMA 8.00 hours (Bug #1263 (Deploy): [PAYROLL] Perhitungan Functional Cost untuk case periode payroll tengah bulan)
- Fixing Perhitungan Periode Awal Pajak, Angka Pajak, FCR, Hiring (Period Payrol 16-15)
- 10:05 AM BANK FAMA 8.00 hours (Bug #1263 (Deploy): [PAYROLL] Perhitungan Functional Cost untuk case periode payroll tengah bulan)
- Fixing Perhitungan Periode Awal Pajak & FCR (Period Payrol 16-15)
- 10:10 AM Minova ERP Internal 3.00 hours (Project: Minova ERP Internal)
- Meeting Koordinasi
- 10:03 AM Bank Kalteng (Phase 2) 8.00 hours (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
- Fixing Report Budget
- 10:02 AM Bank Kalteng (Phase 2) 8.00 hours (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
- Fixing Budget Calculation & Report Budget
- 09:54 AM Bank Kalteng (Phase 2) 8.00 hours (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
- Fixing Budget Calculation
- 09:55 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 07:21 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1231 (Closed): [ Report ] - Performance Report Monitoring)
- [ Report ] - Performance Report Monitoring
- 07:16 AM PT BMS MIGRATION & ENHANCEMENT 1.30 hour (Bug #1210 (Closed): [ Report ] - Performace Report Individu)
- [ Report ] - Performace Report Individu
- 03:53 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1283 (Closed): ESS Mutation - Autofill field)
- ESS Mutation - Autofill field
- 03:44 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1284 (Closed): ESS Exit Clearance - Autofill field)
- ESS Exit Clearance - Autofill field
06/28/2022
- 05:53 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Mutation
- 05:52 PM Bank Kalteng (Phase 2) 4.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Medical
- 05:38 PM Bank Kalteng (Phase 2) 1.00 hour (Support #1286 (Closed): ESS Medical - StartDate)
- ESS Medical - StartDate
- 03:47 PM Bank Kalteng (Phase 2) 1.30 hour (Bug #1273 (Closed): [ESS PMS] Appraisal Peroid tidak Tampil)
- [ESS PMS] Appraisal Peroid tidak Tampil
- 11:34 AM Bank Kalteng (Phase 2) 1.30 hour (Bug #1273 (Closed): [ESS PMS] Appraisal Peroid tidak Tampil)
- [ESS PMS] Appraisal Peroid tidak Tampil
- 03:14 PM MINOVA DEMO 1.00 hour (Feature #1240 (Closed): Costum Report Recruitment best on job)
- Costum Report Recruitment best on job
06/27/2022
- 06:32 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
- BMS(Report&ESS), Demo(Report)
- 05:33 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Mutation
- 05:33 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Exit Clearance
- 05:31 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1275 (Closed): ESS Mutation - Autofill field)
- ESS Mutation - Autofill field
- 05:27 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
- Seeting & Testing Recruitment & Master Data
- 02:54 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1268 (Closed): ESS Promosi - Autofill)
- ESS Promosi - Autofill
- 12:48 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1269 (Closed): ESS Exit Clearance )
- ESS Exit Clearance
- 08:51 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
06/24/2022
- 07:10 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1251 (Closed): [ESS] - Staff Requisition )
- [ESS] - Staff Requisition
- 07:03 PM PT BMS MIGRATION & ENHANCEMENT 1.30 hour (Feature #1267 (Closed): ESS Exit Clearance, ESS Mutasi - Autofill )
- ESS Exit Clearance, ESS Mutasi - Autofill
- 04:59 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Staff Requisition
- 04:58 PM PT BMS MIGRATION & ENHANCEMENT 5.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Promotion
- 04:58 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Mutation
- 04:58 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Exit Clearance
- 04:58 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Travel
- 03:58 PM Bank Kalteng (Phase 2) 2.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Medical
- 03:55 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Travel
- 02:15 PM PT BMS MIGRATION & ENHANCEMENT 7.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Promotion
- 02:14 PM BANK KALTENG 1.00 hour (Project: BANK KALTENG)
- Organization Structure
- 11:10 AM BANK FAMA 1.00 hour (Bug #1215 (QA Test): Report Leave - Kuota Cuti Exist Double di report)
- Report Leave - Kuota Cuti Exist Double di report
- 10:30 AM BANK FAMA 1.00 hour (Bug #1229 (Deploy): Report All Employee - Data KTP Tidak masuk ke Report Tapi data ada di Master Data Employee PHRPA0001)
- Report All Employee - Data KTP Tidak masuk ke Report Tapi data ada di Master Data Employee PHRPA0001
06/23/2022
- 10:32 PM HINO Bugs 1.00 hour (Feature #1266 (Closed): [CR] ESS Overtime untuk merubah validasi pemilihan startdate pengajuan menjadi 60 hari backdate)
- [CR] ESS Overtime untuk merubah validasi pemilihan startdate pengajuan menjadi 60 hari backdate
- 05:36 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 05:29 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Bug #1251 (Closed): [ESS] - Staff Requisition )
- [ESS] - Staff Requisition
- 05:27 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
- Report PMS
- 05:26 PM PT BMS MIGRATION & ENHANCEMENT 5.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS
- 10:36 AM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
- Organization Structure
- 10:04 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
06/22/2022
- 11:43 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Bug #1231 (Closed): [ Report ] - Performance Report Monitoring)
- [ Report ] - Performance Report Monitoring
- 05:52 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Promotion
- 05:51 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Travel
- 05:50 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Staff Requisition
- 05:50 PM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Promotion
- 05:43 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Exit Clearance
- 05:02 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 05:01 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance
- 05:00 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 04:59 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance
- 04:59 PM Minova Corp Affairs 6.00 hours (Project: Minova Corp Affairs)
- HR & Support Marketing
- 04:58 PM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
- Meeting Karyawan Juni 2022
- 04:20 PM PT BMS MIGRATION & ENHANCEMENT 1.30 hour (Feature #1258 (Closed): ESS Mutation - Autofill field)
- ESS Mutation - Autofill field
- 09:42 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Medical
- 08:38 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
06/21/2022
- 08:32 PM CLIENT SUPPORT 8.00 hours (Project: CLIENT SUPPORT)
- CS Support User
- 08:31 PM CLIENT SUPPORT 8.00 hours (Project: CLIENT SUPPORT)
- CS Support User
- 08:31 PM CLIENT SUPPORT 8.00 hours (Project: CLIENT SUPPORT)
- CS Support User
- 08:31 PM CLIENT SUPPORT 8.00 hours (Project: CLIENT SUPPORT)
- CS Support User
- 08:31 PM CLIENT SUPPORT 8.00 hours (Project: CLIENT SUPPORT)
- CS Support User
- 08:30 PM CLIENT SUPPORT 8.00 hours (Project: CLIENT SUPPORT)
- CS Support User
- 05:17 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
- Data Migrasi
- 05:16 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Promotion
- 05:15 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Staff Requisition
- 05:14 PM BANK KALTENG 1.00 hour (Project: BANK KALTENG)
- Data Migrasi
- 05:12 PM PT BMS MIGRATION & ENHANCEMENT 7.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Staff Requisition
- 11:07 AM ROHTO 6.00 hours (Feature #1172 (Closed): [CR] Penambahan Menu Report Leave Khusus Rohto)
- [CR] Penambahan Menu Report Leave Khusus Rohto
- 08:45 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 03:10 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1253 (Closed): ESS Mutation - Lookup Employee ID)
- ESS Mutation - Lookup Employee ID
06/20/2022
- 05:19 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Mutation
- 02:12 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 01:56 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
- Data Migration
- 11:12 AM Bank Kalteng (Phase 2) 8.00 hours (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
- Fixing Budget Calculation
- 11:11 AM Bank Kalteng (Phase 2) 8.00 hours (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
- Fixing Budget Calculation
- 11:09 AM Bank Kalteng (Phase 2) 1.00 hour (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
- Fixing Budget Calculation
- 11:09 AM Minova ERP Internal 2.50 hours (Project: Minova ERP Internal)
- Meeting Karyawan
- 09:12 AM Asuransi Bintang - Existing 1.00 hour (Feature #1249 (QA Test): Penambahan Kolom pada report " Job Desc Individu ")
- Penambahan Kolom pada report " Job Desc Individu "