Activity
From 06/06/2022 to 07/05/2022
07/05/2022
- 05:52 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Staff Requisition
- 05:52 PM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Promotion
- 05:47 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1311 (Closed): ESS Exit Clearance - Show Deskripsi)
- ESS Exit Clearance - Show Deskrips
- 05:41 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 05:35 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1312 (Closed): ESS Mutation - Autofill field)
- ESS Mutation - Autofill field
- 04:57 PM BANK KALTENG 8.00 hours (Bug #1327 (Closed): [HR-COMPENSATION] Calculation masih ada yg kurang sesuai)
- Fixing Compensation Calculate
- 04:52 PM BANK KALTENG 8.00 hours (Bug #1327 (Closed): [HR-COMPENSATION] Calculation masih ada yg kurang sesuai)
- Fixing Compensation Calculate
- 04:43 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1333 (Closed): [ESS] - Mutation)
- [ESS] - Mutation
- 04:42 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1332 (Closed): [ESS] - Exit Clearance)
- [ESS] - Exit Clearance
- 04:41 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1331 (Closed): [ESS] - Promotion )
- [ESS] - Promotion
- 04:35 PM MINOVAES - PRODUCT 1.00 hour (Project: MINOVAES - PRODUCT)
- Design Mock up Mini Product
- 03:57 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:57 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:57 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:56 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:55 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:55 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:54 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:49 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:49 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:49 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:48 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:48 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:47 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:47 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:46 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:45 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:44 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:44 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:43 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:43 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:43 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:43 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:43 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:42 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:42 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:42 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:40 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:40 PM PT BIA 8.00 hours (Project: PT BIA)
- VISIT BIA
- 03:40 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:40 PM PT BIA 8.00 hours (Project: PT BIA)
- VISIT BIA
- 03:38 PM PT BIA 8.00 hours (Project: PT BIA)
- VISIT BIA
- 03:37 PM PT BIA 8.00 hours (Project: PT BIA)
- VISIT BIA
- 03:36 PM PT BIA 8.00 hours (Project: PT BIA)
- VISIT BIA
- 03:36 PM PT BIA 8.00 hours (Project: PT BIA)
- VISIT BIA
- 03:30 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:29 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Membuat Script UAT BKT Phase 2
- 03:29 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:29 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Setting PMS BKT Phase 2
- 03:29 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:28 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 03:28 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing BKT dan Setting Phase 2
- 03:27 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing BKT dan Setting Phase 2
- 03:27 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing BKT Phase 2
- 03:27 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Setting PMS di project BKT
- 03:26 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing PMS BKT Phase 2
- 03:26 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing BKT dan Setting Phase 2
- 03:25 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing BKT dan Setting Phase 2
- 03:25 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing BKT dan Setting Phase 2
- 03:24 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing BKT dan Setting Phase 2
- 03:23 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing BKT Phase 2
- 03:23 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing dan Setting BKT Phase 2
- 03:22 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing dan Setting BKT Phase 2
- 03:21 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing BKT Phase 2
- 03:15 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Bug #1231 (Closed): [ Report ] - Performance Report Monitoring)
- [ Report ] - Performance Report Monitoring
- 03:15 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- UAT Script
- 03:14 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Promotion
- 10:41 AM PT ARITA 0.30 hour (Project: PT ARITA)
- 10:40 AM HINO Bugs 1.00 hour (Project: HINO Bugs)
- pengecekan employee yang tidak ketemu atasan nya
- 10:33 AM HINO Bugs 2.00 hours (Project: HINO Bugs)
- pengecekan untuk deploy service generate cuti prorate
- 10:28 AM PERTALIFE 2.00 hours (Project: PERTALIFE)
- pengecekan aplikasi mobile karena tidak ada history di menu attendance history.
- 08:24 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
07/04/2022
- 06:31 PM PT BMS MIGRATION & ENHANCEMENT 1.30 hour (Feature #1319 (Closed): [ESS] - Promotion - Autofill )
- [ESS] - Promotion - Autofill
- 05:46 PM MINOVAES - PRODUCT 3.00 hours (Project: MINOVAES - PRODUCT)
- Design Mock up Mini Product
- 05:37 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Promotion
- 01:48 PM PT ARITA 1.00 hour (Project: PT ARITA)
- ESS Exit Clearance
- 11:51 AM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Mutation
- 11:51 AM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Exit Clearance
- 11:48 AM PT BMS MIGRATION & ENHANCEMENT 5.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Staff Requisition
- 11:47 AM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Promotion
- 11:45 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Staff Requisition
- 11:45 AM PT BMS MIGRATION & ENHANCEMENT 7.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Promotion
- 11:42 AM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Staff Requisition
- 11:42 AM PT BMS MIGRATION & ENHANCEMENT 5.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Promotion
- 11:40 AM PT BIA 1.00 hour (Project: PT BIA)
- Hide menu OM dan Personal Administration
- 11:37 AM PT BMS MIGRATION & ENHANCEMENT 5.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Promotion
- 11:35 AM BANK KALTENG 3.00 hours (Project: BANK KALTENG)
- ESS - Travel
- 11:30 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS - Promotion]
- 11:26 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 11:25 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 11:25 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Admin
- 11:24 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 11:24 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 11:23 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 11:10 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 11:09 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
07/01/2022
- 05:49 PM PT BIA 3.00 hours (Project: PT BIA)
- OM
- 05:39 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1307 (Closed): [ESS] - Promotion )
- [ESS] - Promotion
- 05:38 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1315 (Closed): [ESS - Promotion] - Autofill )
- [ESS - Promotion] - Autofill
- 05:37 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Exit Clearance
- 05:36 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1313 (Closed): [ESS] - Promotion - Autofill )
- [ESS] - Promotion - Autofill
- 05:35 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Internal UAT ESS
- 05:31 PM Bank Kalteng (Phase 2) 1.00 hour (Bug #1308 (Closed): [HR PMS] Hide Action Add)
- Fixing Hide Button PMS HR
- 05:23 PM Bank Kalteng (Phase 2) 6.00 hours (Bug #1308 (Closed): [HR PMS] Hide Action Add)
- Fixing Hide Button PMS HR
- 05:29 PM CNAF 1.00 hour (Project: CNAF)
- Checking Selisih GL CNAF
- 10:20 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
06/30/2022
- 05:24 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Travel
- 03:40 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Bug #1296 (Closed): Training Management)
- Fixing Instructor Evaluation Training
- 03:36 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1299 (Closed): Job Catalog )
- Fixing Proficiency Qual Di Job Catalog
- 03:35 PM PT BMS MIGRATION & ENHANCEMENT 1.50 hour (Bug #1299 (Closed): Job Catalog )
- Fixing Proficiency Qual Di Job Catalog
- 02:35 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Mutation
- 02:35 PM PT ARITA 5.00 hours (Project: PT ARITA)
- ESS Exit Clearance
- 01:54 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1231 (Closed): [ Report ] - Performance Report Monitoring)
- [ Report ] - Performance Report Monitoring
- 11:22 AM PT BMS MIGRATION & ENHANCEMENT 1.30 hour (Bug #1210 (Closed): [ Report ] - Performace Report Individu)
- [ Report ] - Performace Report Individu
- 09:39 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
06/29/2022
- 04:32 PM CNAF 6.50 hours (Bug #1262 (Deploy): [PAYROLL] Prorate BPJS Pensiun)
- Fixing Prorate BPJS CNAF
- 04:07 PM Bank Kalteng (Phase 2) 5.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Medical
- 12:18 PM CNAF 1.30 hour (Bug #1293 (Developing): Report Posting to GL filter Employee Office, EmployeeID from dan EmployeeID to tidak berfungsi )
- Report Posting to GL filter Employee Office, EmployeeID from dan EmployeeID to tidak berfungsi
- 10:13 AM BANK FAMA 8.00 hours (Bug #1263 (Deploy): [PAYROLL] Perhitungan Functional Cost untuk case periode payroll tengah bulan)
- Fixing Perhitungan Periode Awal Pajak, Angka Pajak, FCR, Hiring, Terminate (Period Payrol 16-15)
- 10:12 AM BANK FAMA 5.00 hours (Bug #1263 (Deploy): [PAYROLL] Perhitungan Functional Cost untuk case periode payroll tengah bulan)
- Fixing Perhitungan Periode Awal Pajak, Angka Pajak, FCR, Hiring, Terminate (Period Payrol 16-15)
- 10:07 AM BANK FAMA 8.00 hours (Bug #1263 (Deploy): [PAYROLL] Perhitungan Functional Cost untuk case periode payroll tengah bulan)
- Fixing Perhitungan Periode Awal Pajak, Angka Pajak, FCR, Hiring, Terminate (Period Payrol 16-15)
- 10:06 AM BANK FAMA 8.00 hours (Bug #1263 (Deploy): [PAYROLL] Perhitungan Functional Cost untuk case periode payroll tengah bulan)
- Fixing Perhitungan Periode Awal Pajak, Angka Pajak, FCR, Hiring (Period Payrol 16-15)
- 10:05 AM BANK FAMA 8.00 hours (Bug #1263 (Deploy): [PAYROLL] Perhitungan Functional Cost untuk case periode payroll tengah bulan)
- Fixing Perhitungan Periode Awal Pajak & FCR (Period Payrol 16-15)
- 10:10 AM Minova ERP Internal 3.00 hours (Project: Minova ERP Internal)
- Meeting Koordinasi
- 10:03 AM Bank Kalteng (Phase 2) 8.00 hours (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
- Fixing Report Budget
- 10:02 AM Bank Kalteng (Phase 2) 8.00 hours (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
- Fixing Budget Calculation & Report Budget
- 09:54 AM Bank Kalteng (Phase 2) 8.00 hours (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
- Fixing Budget Calculation
- 09:55 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 07:21 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1231 (Closed): [ Report ] - Performance Report Monitoring)
- [ Report ] - Performance Report Monitoring
- 07:16 AM PT BMS MIGRATION & ENHANCEMENT 1.30 hour (Bug #1210 (Closed): [ Report ] - Performace Report Individu)
- [ Report ] - Performace Report Individu
- 03:53 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1283 (Closed): ESS Mutation - Autofill field)
- ESS Mutation - Autofill field
- 03:44 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1284 (Closed): ESS Exit Clearance - Autofill field)
- ESS Exit Clearance - Autofill field
06/28/2022
- 05:53 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Mutation
- 05:52 PM Bank Kalteng (Phase 2) 4.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Medical
- 05:38 PM Bank Kalteng (Phase 2) 1.00 hour (Support #1286 (Closed): ESS Medical - StartDate)
- ESS Medical - StartDate
- 03:47 PM Bank Kalteng (Phase 2) 1.30 hour (Bug #1273 (Closed): [ESS PMS] Appraisal Peroid tidak Tampil)
- [ESS PMS] Appraisal Peroid tidak Tampil
- 11:34 AM Bank Kalteng (Phase 2) 1.30 hour (Bug #1273 (Closed): [ESS PMS] Appraisal Peroid tidak Tampil)
- [ESS PMS] Appraisal Peroid tidak Tampil
- 03:14 PM MINOVA DEMO 1.00 hour (Feature #1240 (Closed): Costum Report Recruitment best on job)
- Costum Report Recruitment best on job
06/27/2022
- 06:32 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
- BMS(Report&ESS), Demo(Report)
- 05:33 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Mutation
- 05:33 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Exit Clearance
- 05:31 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1275 (Closed): ESS Mutation - Autofill field)
- ESS Mutation - Autofill field
- 05:27 PM MINOVA DEMO 8.00 hours (Project: MINOVA DEMO)
- Seeting & Testing Recruitment & Master Data
- 02:54 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1268 (Closed): ESS Promosi - Autofill)
- ESS Promosi - Autofill
- 12:48 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1269 (Closed): ESS Exit Clearance )
- ESS Exit Clearance
- 08:51 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
06/24/2022
- 07:10 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1251 (Closed): [ESS] - Staff Requisition )
- [ESS] - Staff Requisition
- 07:03 PM PT BMS MIGRATION & ENHANCEMENT 1.30 hour (Feature #1267 (Closed): ESS Exit Clearance, ESS Mutasi - Autofill )
- ESS Exit Clearance, ESS Mutasi - Autofill
- 04:59 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Staff Requisition
- 04:58 PM PT BMS MIGRATION & ENHANCEMENT 5.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Promotion
- 04:58 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Mutation
- 04:58 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Exit Clearance
- 04:58 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Travel
- 03:58 PM Bank Kalteng (Phase 2) 2.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Medical
- 03:55 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Travel
- 02:15 PM PT BMS MIGRATION & ENHANCEMENT 7.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Promotion
- 02:14 PM BANK KALTENG 1.00 hour (Project: BANK KALTENG)
- Organization Structure
- 11:10 AM BANK FAMA 1.00 hour (Bug #1215 (Closed): Report Leave - Kuota Cuti Exist Double di report)
- Report Leave - Kuota Cuti Exist Double di report
- 10:30 AM BANK FAMA 1.00 hour (Bug #1229 (Deploy): Report All Employee - Data KTP Tidak masuk ke Report Tapi data ada di Master Data Employee PHRPA0001)
- Report All Employee - Data KTP Tidak masuk ke Report Tapi data ada di Master Data Employee PHRPA0001
06/23/2022
- 10:32 PM HINO Bugs 1.00 hour (Feature #1266 (Closed): [CR] ESS Overtime untuk merubah validasi pemilihan startdate pengajuan menjadi 60 hari backdate)
- [CR] ESS Overtime untuk merubah validasi pemilihan startdate pengajuan menjadi 60 hari backdate
- 05:36 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 05:29 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Bug #1251 (Closed): [ESS] - Staff Requisition )
- [ESS] - Staff Requisition
- 05:27 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
- Report PMS
- 05:26 PM PT BMS MIGRATION & ENHANCEMENT 5.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS
- 10:36 AM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
- Organization Structure
- 10:04 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
06/22/2022
- 11:43 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Bug #1231 (Closed): [ Report ] - Performance Report Monitoring)
- [ Report ] - Performance Report Monitoring
- 05:52 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Promotion
- 05:51 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Travel
- 05:50 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Staff Requisition
- 05:50 PM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Promotion
- 05:43 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Exit Clearance
- 05:02 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 05:01 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance
- 05:00 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 04:59 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance
- 04:59 PM Minova Corp Affairs 6.00 hours (Project: Minova Corp Affairs)
- HR & Support Marketing
- 04:58 PM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
- Meeting Karyawan Juni 2022
- 04:20 PM PT BMS MIGRATION & ENHANCEMENT 1.30 hour (Feature #1258 (Closed): ESS Mutation - Autofill field)
- ESS Mutation - Autofill field
- 09:42 AM Bank Kalteng (Phase 2) 8.00 hours (Project: Bank Kalteng (Phase 2))
- ESS Medical
- 08:38 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
06/21/2022
- 08:32 PM CLIENT SUPPORT 8.00 hours (Project: CLIENT SUPPORT)
- CS Support User
- 08:31 PM CLIENT SUPPORT 8.00 hours (Project: CLIENT SUPPORT)
- CS Support User
- 08:31 PM CLIENT SUPPORT 8.00 hours (Project: CLIENT SUPPORT)
- CS Support User
- 08:31 PM CLIENT SUPPORT 8.00 hours (Project: CLIENT SUPPORT)
- CS Support User
- 08:31 PM CLIENT SUPPORT 8.00 hours (Project: CLIENT SUPPORT)
- CS Support User
- 08:30 PM CLIENT SUPPORT 8.00 hours (Project: CLIENT SUPPORT)
- CS Support User
- 05:17 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
- Data Migrasi
- 05:16 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Promotion
- 05:15 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Staff Requisition
- 05:14 PM BANK KALTENG 1.00 hour (Project: BANK KALTENG)
- Data Migrasi
- 05:12 PM PT BMS MIGRATION & ENHANCEMENT 7.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Staff Requisition
- 11:07 AM ROHTO 6.00 hours (Feature #1172 (Closed): [CR] Penambahan Menu Report Leave Khusus Rohto)
- [CR] Penambahan Menu Report Leave Khusus Rohto
- 08:45 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 03:10 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1253 (Closed): ESS Mutation - Lookup Employee ID)
- ESS Mutation - Lookup Employee ID
06/20/2022
- 05:19 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Mutation
- 02:12 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 01:56 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
- Data Migration
- 11:12 AM Bank Kalteng (Phase 2) 8.00 hours (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
- Fixing Budget Calculation
- 11:11 AM Bank Kalteng (Phase 2) 8.00 hours (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
- Fixing Budget Calculation
- 11:09 AM Bank Kalteng (Phase 2) 1.00 hour (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
- Fixing Budget Calculation
- 11:09 AM Minova ERP Internal 2.50 hours (Project: Minova ERP Internal)
- Meeting Karyawan
- 09:12 AM Asuransi Bintang - Existing 1.00 hour (Feature #1249 (Closed): Penambahan Kolom pada report " Job Desc Individu ")
- Penambahan Kolom pada report " Job Desc Individu "
06/17/2022
- 05:13 PM BANK KALTENG 1.00 hour (Project: BANK KALTENG)
- Data Migration
- 05:12 PM PT BMS MIGRATION & ENHANCEMENT 7.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Mutation
- 04:24 PM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
- Meeting Karyawan
- 10:45 AM PT BMS MIGRATION & ENHANCEMENT 1.30 hour (Feature #1250 (Closed): ESS Mutation)
- ESS Mutation
- 09:31 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
06/16/2022
- 05:07 PM MINOVA DEMO 1.00 hour (Feature #1240 (Closed): Costum Report Recruitment best on job)
- Costum Report Recruitment best on job
- 05:03 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Staff Requisition
- 05:02 PM Minova ERP Internal 6.00 hours (Project: Minova ERP Internal)
- Meeting BIA
- 05:01 PM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Exit Clearance
- 05:01 PM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
- Sharing Modul HR
- 05:00 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Mutation
- 04:59 PM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Staff Requisition
- 04:59 PM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
- Project Module HR
- 03:42 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Feature #1226 (Closed): ESS - Promotion)
- ESS - Promotion
- 03:40 PM Asuransi Bintang - Existing 1.00 hour (Feature #1249 (Closed): Penambahan Kolom pada report " Job Desc Individu ")
- Penambahan Kolom pada report " Job Desc Individu "
- 10:56 AM Minova Corp Affairs 6.50 hours (Project: Minova Corp Affairs)
- Finance & HR
- 10:53 AM Minova Corp Affairs 1.50 hour (Project: Minova Corp Affairs)
- Meeting Internal Finance & Admin - Financial Plan 2022
- 10:53 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance
- 10:52 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Admin
- 10:52 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Admin
- 10:51 AM Minova Corp Affairs 2.50 hours (Project: Minova Corp Affairs)
- Sharing Session with pak Heriyas Project Management
- 10:50 AM Minova Corp Affairs 5.50 hours (Project: Minova Corp Affairs)
- Finance
- 10:49 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance, HR & Admin
- 10:48 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 10:48 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance & Admin
- 09:42 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
06/15/2022
- 10:15 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1235 (Closed): ESS Mutation)
- ESS Mutation
- 06:15 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
- 06:14 PM CNAF 1.00 hour (Project: CNAF)
- 06:13 PM HINO 1.00 hour (Project: HINO)
- 02:43 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Feature #1226 (Closed): ESS - Promotion)
- ESS - Promotion
- 12:19 PM IMFI 1.00 hour (Project: IMFI)
- 11:39 AM LPPOM HALAL bugs 0.30 hour (Project: LPPOM HALAL bugs)
06/14/2022
- 09:02 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 05:10 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Mutation
- 03:57 PM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
- Meeting Karyawan
- 02:20 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Exit Clearance
- 01:48 PM PT ARITA 1.00 hour (Project: PT ARITA)
- Generate User Login
- 10:08 AM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Bug #1210 (Closed): [ Report ] - Performace Report Individu)
- [ Report ] - Performace Report Individu
- 07:28 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
06/13/2022
- 05:36 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Staff Requisition
- 05:35 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Staff Requisition
- 05:34 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Staff Requisition
- 05:34 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Mutation
- 05:07 PM Bank Kalteng (Phase 2) 2.00 hours (Bug #1203 (Closed): [Budgeting] Budget Calulation tidak bisa Execute)
- Fixing Budget Calculation
- 05:06 PM Bank Kalteng (Phase 2) 3.00 hours (Bug #1177 (Closed): [Training Management] Training Data (DE) - Action tidak berfungsi)
- Fixing Action Training
- 12:46 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Feature #1181 (Closed): ESS Exit Clearance )
- ESS Exit Clearance
- 11:17 AM Bank Kalteng (Phase 2) 1.00 hour (Bug #1166 (Closed): [Training Management] Training Data (DE) - Attendee tidak dapat diupdate )
- Fixing Attende BKT
- 11:10 AM TUGU PRATAMA INDONESIA (TPI) 2.00 hours (Bug #1225 (Closed): Engine Payroll bug)
- Fixing Running Payroll TPI
- 10:26 AM TUGU PRATAMA INDONESIA (TPI) 8.00 hours (Bug #1225 (Closed): Engine Payroll bug)
- Fixing Payroll & Posting GL
- 11:09 AM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
- Ujian Sertifikasi HR Phase 1
- 11:04 AM Bank Kalteng (Phase 2) 2.00 hours (Bug #1165 (Closed): [Training Management] Training Data (DE) - Instuctor Evaluation)
- Fixing Instructor Evaluation Training
- 08:04 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 08:02 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
06/10/2022
- 05:47 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Staff Requisition
- 05:27 PM BANK KALTENG 2.00 hours (Feature #571 (Closed): [Benefit Administration] Medical Master Data)
- [Benefit Administration] Medical Master Data
- 03:44 PM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Exit Clearance
- 10:53 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #1222 (Closed): ESS Exit Clearance - Autofill Field)
- ESS Exit Clearance - Autofill Field
- 09:00 AM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
- Testing Import Data
- 08:59 AM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Exit Clearance
06/09/2022
- 05:23 PM Asuransi Bintang - Existing 2.00 hours (Support #1223 (Closed): Perubahan untuk membaca data berdasarkan data terupdate pada startdate di Menu Report Employee Profile)
- Perubahan untuk membaca data berdasarkan data terupdate pada startdate di Menu Report Employee Profile
- 05:15 PM PERTALIFE 8.00 hours (Project: PERTALIFE)
- 05:14 PM PERTALIFE 8.00 hours (Project: PERTALIFE)
- 04:13 PM Bank Kalteng (Phase 2) 2.00 hours (Bug #1155 (Closed): [HR Strategic] Talent Management - Talent Master Data)
- Fixing Talent Combo
- 03:02 PM TUGU PRATAMA INDONESIA (TPI) 3.00 hours (Bug #1225 (Closed): Engine Payroll bug)
- Fixing Running Payroll TPI
- 02:58 PM TUGU PRATAMA INDONESIA (TPI) 4.00 hours (Bug #1225 (Closed): Engine Payroll bug)
- Fixing Running Payroll TPI
- 12:08 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Bug #1210 (Closed): [ Report ] - Performace Report Individu)
- [ Report ] - Performace Report Individu
- 10:31 AM Minova ERP Internal 1.30 hour (Project: Minova ERP Internal)
- Ujian Sertifikasi
- 07:41 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
06/08/2022
- 05:32 PM PT BMS MIGRATION & ENHANCEMENT 6.30 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Staff Requisition
- 05:32 PM Minova ERP Internal 1.30 hour (Project: Minova ERP Internal)
- Ujian Sertifikasi MinovaHR 2022
- 05:03 PM PT BMS MIGRATION & ENHANCEMENT 6.30 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Exit Clearance
- 12:43 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 10:52 AM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Staff Requisition
- 10:51 AM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
- Project Management Sharing
- 10:02 AM BANK FAMA 8.00 hours (Bug #1120 (Closed): Upload InIt Paycumm tidak dapat menimpa Data saat melakukan upload data yang akan dikoreksi)
- Fixing Init Paycum FAMA
- 09:04 AM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
- Project Management Sharing
- 09:04 AM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Exit Clearance
06/07/2022
- 05:29 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Promosi Form
- 05:28 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Promosi
- 05:27 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS - Promosi
- 04:38 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Staff Requisition
- 04:24 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
06/06/2022
- 10:33 PM PERTALIFE Bugs 2.00 hours (Support #1208 (Closed): Update Filter Data untuk Report Late Report)
- Update Filter Data untuk Report Late Report
- 05:32 PM BANK FAMA 1.50 hour (Bug #1168 (Closed): Case Kalkulasi Biaya Jabatan Yang Belum sesuai dengan Regulasi)
- Fixing Payroll Fama
- 05:18 PM PERTALIFE 1.00 hour (Bug #1192 (Closed): [Purchase Report] NPP Report)
- [Purchase Report] NPP Report
- 04:55 PM Asuransi Bintang - Existing 1.00 hour (Bug #1178 (Closed): Report Employee Profile masih salah untuk mengambil data score)
- Report Employee Profile masih salah untuk mengambil data score
- 04:19 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- ESS Exit Clearance
- 04:06 PM PT BMS MIGRATION & ENHANCEMENT 7.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- [ESS] - Staff Requisition
- 04:04 PM BANK KALTENG 1.00 hour (Project: BANK KALTENG)
- Mapping data migrasi BKT
- 03:43 PM Bank Kalteng (Phase 2) 1.00 hour (Bug #1197 (Closed): [Travel Management ] Travel Reports - Travel Employee (Individu))
- [Travel Management ] Travel Reports - Travel Employee (Individu)
- 03:28 PM Bank Kalteng (Phase 2) 1.00 hour (Bug #1197 (Closed): [Travel Management ] Travel Reports - Travel Employee (Individu))
- [Travel Management ] Travel Reports - Travel Employee (Individu)
- 03:42 PM Bank Kalteng (Phase 2) 1.00 hour (Bug #1202 (Closed): [Budgeting Report] Report tidak tampil)
- [Budgeting Report] Report tidak tampil
- 02:26 PM Bank Kalteng (Phase 2) 1.00 hour (Bug #1202 (Closed): [Budgeting Report] Report tidak tampil)
- [Budgeting Report] Report tidak tampil
- 02:49 PM Bank Kalteng (Phase 2) 1.00 hour (Bug #1154 (Closed): [ HR ] Recruitment Management - Report - Applicant Activity By Assignment)
- [ HR ] Recruitment Management - Report - Applicant Activity By Assignment
- 02:46 PM Bank Kalteng (Phase 2) 1.00 hour (Bug #1162 (Closed): [Medical Report] Logo Report belum diganti dengan Logo Bank Kalteng)
- [Medical Report] Logo Report belum diganti dengan Logo Bank Kalteng
- 02:22 PM Minova ERP Internal 2.30 hours (Project: Minova ERP Internal)
- Meeting Koordinasi
- 02:21 PM BANK FAMA 1.00 hour (Bug #1117 (QA Test): Proses Generate Absence Quota Proses Tidak Selesai)
- Fixing Generate Absence Quota
- 02:03 PM Bank Kalteng (Phase 2) 1.00 hour (Bug #1199 (Closed): [Recruitment Report] Logo Report belum diganti dengan Logo Bank Kalteng)
- [Recruitment Report] Logo Report belum diganti dengan Logo Bank Kalteng
- 12:41 PM BANK FAMA 1.00 hour (Bug #1205 (Closed): Upload File Data - Error)
- Upload File Data - Error
- 11:35 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Bug #1127 (Closed): [ HR ] - PMS - KPI - Calculated Weighted Score)
- Fixing HR PMS
- 11:34 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Bug #1127 (Closed): [ HR ] - PMS - KPI - Calculated Weighted Score)
- Fixing HR PMS
- 11:31 AM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Bug #1136 (Closed): [ HR ] - PMS KPI)
- Fixing HR PMS
- 11:29 AM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Bug #1137 (Closed): [ HR ] - PMS - Core Values)
- Fixing HR PMS
- 11:26 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Bug #1128 (Closed): [ HR ] - PMS - Maintain Core values (Add/Delete/edit))
- Fixing HR PMS
- 11:25 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Bug #1128 (Closed): [ HR ] - PMS - Maintain Core values (Add/Delete/edit))
- Fixing HR PMS
- 10:57 AM BANK FAMA 3.00 hours (Bug #1130 (QA Test): Case Perhitungan Pajak Karyawan Resign)
- Fixing SPT Karyawan Resign
- 08:57 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Also available in: Atom