Activity
From 03/23/2022 to 04/21/2022
04/21/2022
- 05:00 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 04:53 PM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
- Fixing Asset Internal
- 04:47 PM BANK FAMA 2.00 hours (Project: BANK FAMA)
- Testing Penyeseuaian User dengan skema Profile Baru
- 04:22 PM CLIENT SUPPORT 6.00 hours (Project: CLIENT SUPPORT)
- Update Laporan Log Issue Klien
- 04:20 PM Asuransi Bintang - Existing 1.00 hour (Bug #1084 (User Test): Report Vacancy List beberapa Field tidak menampilkan data)
- Replace RDL & SP
- 12:43 PM Asuransi Bintang - Existing 1.30 hour (Bug #1084 (User Test): Report Vacancy List beberapa Field tidak menampilkan data)
- Report Vacancy List beberapa Field tidak menampilkan data
- 10:06 AM Asuransi Bintang - Existing 3.00 hours (Bug #1084 (User Test): Report Vacancy List beberapa Field tidak menampilkan data)
- Check Data dan testing Untuk analisa issue & ambil data table Applicant
- 04:17 PM CNAF 0.50 hour (Project: CNAF)
- Support Mas Adit Buatkan Template Upload data Assignment empmd0002
- 03:20 PM MINOVAES - PRODUCT 2.00 hours (Project: MINOVAES - PRODUCT)
- Design Mock up BI Dashboard
- 03:10 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
- Input Data Qualification BKT
- 02:46 PM PT BMS MIGRATION & ENHANCEMENT 3.50 hours (Bug #1082 (Closed): [ ESS Travel ] - Travel Provider & Travel Class)
- Fixing ESS Travel Combo
- 02:19 PM BANK WOORI SAUDARA 1.00 hour (Bug #1070 (Closed): [ Rec ] - Startdate Applicant Movement)
- 02:18 PM CNAF 0.50 hour (Project: CNAF)
- Support Template Assignment Upload Data
- 02:03 PM BANK FAMA 1.00 hour (Bug #1090 (Closed): Init Payroll Cummulation - Data Previous Income & Previous Tax tidak masuk ke eSPT tahunan setelah upload Data & Running Payroll)
- create testing data - case Init Payroll Cummulation - Data Previous Income & Previous Tax tidak masuk ke eSPT tahunan...
- 12:12 PM PERTALIFE Bugs 0.50 hour (Project: PERTALIFE Bugs)
- Support Payroll - Selisih
- 12:10 PM BANK FAMA 0.50 hour (Project: BANK FAMA)
- QA Hasil Update New WT penyesuauian Pajak Fama dari manual mereka ke sistem
- 12:07 PM BANK FAMA 1.00 hour (Project: BANK FAMA)
- Guide User untuk Payroll BPJS
- 12:04 PM BANK FAMA 1.50 hour (Project: BANK FAMA)
- Proofing Pajak Bulanan - BANK FAMA INTERNATIONAL
- 10:48 AM Minova Corp Affairs 7.00 hours (Project: Minova Corp Affairs)
- Finance, GA
- 10:44 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance, GA
- 10:41 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance, GA
- 10:36 AM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Bug #1080 (Closed): [ HR Travel ] - Travel Provider)
- Fixing Transport Provider Travel
- 10:32 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance, GA
- 10:31 AM TUGU PRATAMA INDONESIA (TPI) 3.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Fixing Migrasi Payroll TPI
- 10:29 AM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Bug #1079 (Closed): Talent Master Data)
- Fixing Talent Combo
- 10:21 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Taxation, GA
- 10:04 AM Asuransi Bintang - Existing 4.00 hours (Bug #1083 (QA Test): Report Aplicant Activity Tidak Menampilkan Data)
- Check Data dan testing Untuk analisa issue
- 09:12 AM PERTALIFE Bugs 1.00 hour (Bug #1069 (Closed): Init Payroll Cummulation - Data Previous Income & Previous Tax tidak masuk ke eSPT tahunan setelah upload Data & Running Payroll)
- Update Testing - Init Payroll Cummulation - Data Previous Income & Previous Tax tidak masuk ke eSPT tahunan setelah u...
- 09:08 AM BANK FAMA 1.00 hour (Project: BANK FAMA)
- Case ESS Payslip - Payslip yang keluar punya BBG
- 09:05 AM BBG 0.50 hour (Project: BBG)
- Case Error Running Payroll - Payroll Group Head Office
- 09:03 AM HINO 1.00 hour (Project: HINO)
- Case Absence Quota Prorate - belum ada validasi di ESS
- 09:02 AM BANK FAMA 0.50 hour (Project: BANK FAMA)
- Create New Profile & Update User Profile Susana
- 09:00 AM BANK FAMA 1.50 hour (Project: BANK FAMA)
- Update Wage Type Baru untuk Pengembalian Pajak & Petongan Pajak (Direct)
- 08:59 AM PERTALIFE Bugs 1.50 hour (Project: PERTALIFE Bugs)
- Case employee ID generate Aplikasi tidak sesuai dengan manual Tugu Mandiri - update data employee
- 08:57 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 08:55 AM PERTALIFE Bugs 1.00 hour (Project: PERTALIFE Bugs)
- Support Payroll- Selisih hasil running
04/20/2022
- 04:54 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 04:53 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- bms
- 04:52 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 04:50 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 04:50 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance, GA
- 04:50 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 04:49 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 04:49 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- 04:43 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
- Input Data Qualification BKT
- 04:33 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Taxation, GA
- 04:25 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance, GA, Tax
- 04:23 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance, GA
- 02:18 PM BANK WOORI SAUDARA 3.50 hours (Bug #1070 (Closed): [ Rec ] - Startdate Applicant Movement)
- Fixing StartDate Transfer To Emp
- 02:15 PM MINOVAES - PRODUCT 4.00 hours (Project: MINOVAES - PRODUCT)
- Design Mock up BI Dashboard
- 01:57 PM BANK KALTENG 2.00 hours (Support #1045 (Closed): ESS Leave - Validasi Wajib melakukan Attachment File)
- ESS Leave - Validasi Wajib melakukan Attachment File
- 11:20 AM BANK FAMA 1.00 hour (Bug #1075 (Closed): Report Payslip Logo nya BBG - harus diganti ke logo FAMA)
- Report Payslip Logo nya BBG - harus diganti ke logo FAMA
- 11:18 AM BANK FAMA 1.00 hour (Bug #1068 (Closed): Payroll Report - eSPT Tahunan (Export) tidak berfungsi)
- Payroll Report - eSPT Tahunan (Export) tidak berfungsi
- 10:09 AM MINOVA DEMO 2.00 hours (Project: MINOVA DEMO)
- Testing Modul Sales, Purchasing dan Asset Management Port 61124
- 10:08 AM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
- HR - Memo Internal Cutber 2022
- 10:07 AM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
- HR - Proses Rekrutmen
- 09:49 AM BBG Bugs 1.00 hour (Bug #1041 (Closed): Assignment Employee Pensiun, Relasi ke ORM seharusnya terputus tapi membentuk relasi baru)
- QA test & Update Table Employee Status 00-resign menjadi 04-resign
- 09:47 AM BBG Bugs 1.00 hour (Bug #960 (Closed): [HR-Benefit Loan] Loan Balance Selalu Error)
- QA Test Loan BBG - Deploy Fixing File ke BBG Prod
- 08:38 AM PERTALIFE Bugs 3.00 hours (Project: PERTALIFE Bugs)
- support payroll bulan april & guide user terkait cara maintain data yang belum diketahui user
- 08:38 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 08:36 AM BANK FAMA 1.50 hour (Project: BANK FAMA)
- Case ESS Epayslip - payslip yang keluar tidak sesaui
- 08:33 AM BANK FAMA 1.50 hour (Project: BANK FAMA)
- Case InIt Payroll Cummulation tidak berfungsi
04/19/2022
- 04:45 PM LPPOM HALAL bugs 3.00 hours (Project: LPPOM HALAL bugs)
- Seting Sertifikat SSL
- 04:43 PM LPPOM HALAL bugs 3.00 hours (Bug #1076 (Assigned): Tambah Komponen Gaji / Wage Type Rapel Direct (+) Not in out)
- Support Ninis IHATEC Tentang Payroll Additional Rapel dan BPJS minimum
- 04:41 PM BANK KALTENG 1.00 hour (Project: BANK KALTENG)
- Mapping Data Bank Kalteng
- 04:40 PM BANK KALTENG 1.00 hour (Project: BANK KALTENG)
- Mapping data BKT
- 04:39 PM BANK WOORI SAUDARA 1.00 hour (Project: BANK WOORI SAUDARA)
- Follow up hasil testing BWS
- 04:37 PM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Testing Report BMS
- 04:36 PM BBG Bugs 1.50 hour (Bug #1065 (Deploy): ESS Overtime Action Reject dan Revisi Tidak aktif)
- Proses Check dan Deploy
- 04:32 PM PT ARITA 3.50 hours (Bug #1020 (QA Test): Validasi Loan)
- Fixing Loan
- 04:29 PM TUGU PRATAMA INDONESIA (TPI) 4.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Meeting & Setting Employee assiment
- 04:27 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Training Management
- 04:23 PM TUGU PRATAMA INDONESIA (TPI) 8.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Report Payslip & Wage type Recap
- 04:22 PM TUGU PRATAMA INDONESIA (TPI) 8.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Report Payslip
- 04:20 PM TUGU PRATAMA INDONESIA (TPI) 8.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Report Payslip
- 04:16 PM TUGU PRATAMA INDONESIA (TPI) 8.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Payroll Posting to GL Costum & Testing
- 04:16 PM TUGU PRATAMA INDONESIA (TPI) 8.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Payroll Posting to GL
- 04:14 PM TUGU PRATAMA INDONESIA (TPI) 8.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Payroll Posting to GL & Payslip
- 04:13 PM MINOVAES - PRODUCT 7.00 hours (Project: MINOVAES - PRODUCT)
- Design Mock up BI Dashboard
- 04:11 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Training Management
- 04:10 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Training Management
- 04:06 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Report Recruitment
- 04:03 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Recruitment
- 04:03 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Recruitment
- 04:01 PM BANK KALTENG 7.00 hours (Project: BANK KALTENG)
- Input Job Catalog BKT
- 04:01 PM BANK KALTENG 1.00 hour (Project: BANK KALTENG)
- Memperbaiki FRD Pertalife
- 04:00 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 04:00 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Bug Fixing after Training BKT
- 03:57 PM TUGU PRATAMA INDONESIA (TPI) 12.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- VISIT TPI
- 02:57 PM BANK KALTENG 1.00 hour (Bug #1061 (Closed): Generate Absence Quota tidak Berfungsi)
- Fixing Generate Quota
- 12:10 PM BBG Bugs 3.00 hours (Bug #1041 (Closed): Assignment Employee Pensiun, Relasi ke ORM seharusnya terputus tapi membentuk relasi baru)
- Fixing Relasi OM Resign BBG
- 10:05 AM BANK WOORI SAUDARA 1.00 hour (Project: BANK WOORI SAUDARA)
- Meeting BWS Follow up hasil testing
- 10:03 AM BANK KALTENG 7.00 hours (Project: BANK KALTENG)
- Mapping data BKT PHRPA0002
- 09:50 AM Minova ERP Internal 7.50 hours (Project: Minova ERP Internal)
- FIxing Asset Internal
- 09:47 AM BBG Bugs 7.50 hours (Bug #960 (Closed): [HR-Benefit Loan] Loan Balance Selalu Error)
- Fixing Error Loan
- 08:54 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
04/18/2022
- 05:02 PM MINOVAES - PRODUCT 2.00 hours (Project: MINOVAES - PRODUCT)
- Business Intelligence Dashboard
- 05:00 PM BANK KALTENG 6.00 hours (Project: BANK KALTENG)
- Data Migration Bank Kalteng PA02
- 04:57 PM Asuransi Bintang - Existing 1.00 hour (Project: Asuransi Bintang - Existing)
- Join Meeting Training Asbi
- 04:57 PM PERTALIFE Bugs 0.50 hour (Project: PERTALIFE Bugs)
- Date Specification - Hiring Date
- 04:55 PM PERTALIFE Bugs 0.50 hour (Project: PERTALIFE Bugs)
- Create Template Upload THR & Testing Upload Data dengan Template yang dibuat
- 04:54 PM HINO Bugs 0.50 hour (Bug #1063 (QA Test): Report Generator - Tidak Dapat Generate Data)
- QA Testing Modul Report Generator - Tarik Report OM Recap
- 04:52 PM HINO Bugs 2.00 hours (Bug #1064 (Deploy): Kolom Is Terminate & Terminate Date NULL di table PCMEPOMRECAP)
- Case Kolom Is Terminate & Terminate Date NULL di table PCMEPOMRECAP
- 04:08 PM BBG Bugs 2.00 hours (Bug #1065 (Deploy): ESS Overtime Action Reject dan Revisi Tidak aktif)
- Cek Data Flow ESS Overtime
- 03:41 PM HINO 2.50 hours (Bug #980 (Closed): [ESS - Leave] Develop Service Generate Absence Quota)
- Deploy SP dan Buat JOB SQL
- 02:20 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- HR, GA & Admin
- 02:19 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- HR, GA & Admin
- 01:42 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Bug Fixing after Training BKT
- 01:41 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Bug Fixing after Training BKT
- 12:06 PM BANK KALTENG 2.00 hours (Feature #1033 (Closed): My WorkPlace - Report My CV)
- My WorkPlace - Report My CV
- 11:23 AM LPPOM HALAL bugs 2.00 hours (Project: LPPOM HALAL bugs)
- Support Ninis IHATEC Finish Payroll Error
- 09:38 AM LPPOM HALAL 1.00 hour (Project: LPPOM HALAL)
- Case User Ter-Lock & Create Tutorial UNLOCK user
- 09:34 AM HINO 1.00 hour (Project: HINO)
- Case Attendance employee Tidak ada Data bulan Maret
- 09:33 AM Asuransi Bintang - Existing 3.00 hours (Project: Asuransi Bintang - Existing)
- Training - Recruitment Management
- 09:31 AM HINO 1.00 hour (Project: HINO)
- Case Data Attendace Maret Tidak ada
- 09:29 AM HINO 1.00 hour (Project: HINO)
- Support testing file upload additional Payroll
- 09:27 AM BBG Bugs 1.00 hour (Bug #1024 (Closed): Gagal View Report Leave - waiting tidak selesai sampai 30 menit)
- Testing & Discuss Case di pembacaan Report Leave BBG
- 08:56 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
04/14/2022
- 04:46 PM BANK WOORI SAUDARA 2.00 hours (Project: BANK WOORI SAUDARA)
- Follow up hasil testing BWS
- 04:45 PM BANK KALTENG 6.00 hours (Project: BANK KALTENG)
- Mapping data BKT
- 04:44 PM TUGU PRATAMA INDONESIA (TPI) 4.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Mapping dan import data TPI
- 04:42 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
- Mapping data BKT
- 04:42 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Data ORM BKT, Import Data Cabang Kasongan
- 04:40 PM BANK WOORI SAUDARA 2.00 hours (Project: BANK WOORI SAUDARA)
- Follow up hasil testing BWS
- 03:02 PM BANK KALTENG 1.00 hour (Feature #1047 (Closed): Payroll Report - Wage Type Recap - Penambahan Filter Employee Office)
- Payroll Report - Wage Type Recap - Penambahan Filter Employee Office
- 12:04 PM BBG Bugs 1.00 hour (Bug #1024 (Closed): Gagal View Report Leave - waiting tidak selesai sampai 30 menit)
- Deploy RDL dan SP ke server DB Live/Prod BBG
- 10:10 AM BBG Bugs 1.00 hour (Bug #1024 (Closed): Gagal View Report Leave - waiting tidak selesai sampai 30 menit)
- Gagal View Report Leave - waiting tidak selesai sampai 30 menit
- 10:50 AM CNAF 1.00 hour (Project: CNAF)
- Support Mas Adit Cek Employee 00006874 ada Wagetype MIT
- 10:41 AM Bank Mega Syariah Existing 0.50 hour (Project: Bank Mega Syariah Existing)
- Support Mas Pendi Guide Error is Full Due do to LOG_BACKUP
- 10:31 AM BANK WOORI SAUDARA 1.00 hour (Bug #1050 (Closed): [BWS] - fixing report CV Bahasa Inggtis Convert to PDF)
- [BWS] - fixing report CV Bahasa Inggtis Convert to PDF
- 09:59 AM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
- Finance - Rekap dan Followup Bukti Potong pph 23 periode 2021
- 09:58 AM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
- Finance - Rekap Bukti Transaksi Bank Mandiri Jan - Maret 2022
- 08:55 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
04/13/2022
- 05:03 PM BANK KALTENG 3.00 hours (Project: BANK KALTENG)
- Mapping Data Bank Kalteng
- 04:33 PM BANK KALTENG 2.00 hours (Bug #1048 (Closed): ESS Leave - Penambahan Alert dan Button Create tidak Berfungsi)
- ESS Leave - Penambahan Alert dan Button Create tidak Berfungsi
- 04:18 PM MINOVAES - PRODUCT 7.50 hours (Support #312 (Assigned): [FIN] Closing Period Accounting)
- Fixing Closing SL Internal
- 04:16 PM MINOVAES - PRODUCT 2.00 hours (Support #312 (Assigned): [FIN] Closing Period Accounting)
- Fixing Closing SL Internal
- 04:16 PM MINOVAES - PRODUCT 3.00 hours (Support #312 (Assigned): [FIN] Closing Period Accounting)
- Fixing Closing SL Internal
- 04:11 PM Minova ERP Internal 5.50 hours (Project: Minova ERP Internal)
- FIxing Asset Internal
- 04:11 PM Minova ERP Internal 7.50 hours (Project: Minova ERP Internal)
- FIxing Asset Internal
- 04:09 PM Minova ERP Internal 4.50 hours (Project: Minova ERP Internal)
- FIxing Asset Internal
- 04:08 PM Minova ERP Internal 2.50 hours (Project: Minova ERP Internal)
- Meeting Koordinasi
- 03:59 PM BANK KALTENG 2.00 hours (Bug #1038 (Closed): [Employee Administration] Custom External ID)
- Fixing External ID BKT
- 02:40 PM TUGU PRATAMA INDONESIA (TPI) 5.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Payroll TPI
04/12/2022
- 05:09 PM BANK WOORI SAUDARA 1.00 hour (Bug #1043 (Closed): [BW] - fixing report CV bahasa inonesia dan bahasa inggris di menu report )
- [BW] - fixing report CV bahasa inonesia dan bahasa inggris di menu report
- 04:50 PM BBG Bugs 1.00 hour (Bug #1041 (Closed): Assignment Employee Pensiun, Relasi ke ORM seharusnya terputus tapi membentuk relasi baru)
- Assignment Employee Pensiun, Relasi ke ORM seharusnya terputus tapi membentuk relasi baru
- 04:45 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 04:40 PM BANK WOORI SAUDARA 2.00 hours (Project: BANK WOORI SAUDARA)
- Follow up hasil testing BWS
- 04:34 PM TUGU PRATAMA INDONESIA (TPI) 2.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Mapping Data Payroll
- 04:31 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
- [BKT] - Mapping data PersonalID, Assignment
- 04:26 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- [BKT] - Mapping data Payroll Reguler, Payroll Basic Data, Adittional Payroll, Payroll Benefit
- 04:13 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Bug Fixing after Training BKT
- 04:03 PM PERTALIFE Bugs 1.00 hour (Project: PERTALIFE Bugs)
- Case Error Finish Payroll - Payroll Grup Permanent
- 04:00 PM PERTALIFE Bugs 0.50 hour (Project: PERTALIFE Bugs)
- Case Employee ID Double untuk orang yang sama
- 03:59 PM BBG Bugs 0.50 hour (Project: BBG Bugs)
- Case Employee Pensiun, terbentuk relasi E-P yang baru yang harusnya terdelimit sesuai tanggal pensiun
- 02:56 PM TUGU PRATAMA INDONESIA (TPI) 3.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Mapping Data Payroll
- 02:53 PM BANK KALTENG 1.00 hour (Feature #1034 (Closed): Report Employee Assignment)
- Report Employee Assignment
- 02:30 PM BANK KALTENG 3.00 hours (Project: BANK KALTENG)
- Mapping Data Bank Kalteng
- 02:28 PM PT ARITA 2.00 hours (Project: PT ARITA)
- Organization Structure PT Arita
- 01:25 PM HINO 1.00 hour (Project: HINO)
- Case THR dibayarkan terpisah dengan Payroll
- 11:50 AM CNAF 1.00 hour (Project: CNAF)
- Case Error running Payroll
- 11:37 AM Asuransi Bintang - Existing 1.00 hour (Bug #1040 (QA Test): Error Report Job Desc Individu)
- Error Report Job Desc Individu
- 11:35 AM BANK KALTENG 1.00 hour (Feature #1032 (Closed): My WorkPlace - My Timesheet)
- My WorkPlace - My Timesheet
- 09:49 AM TUGU PRATAMA INDONESIA (TPI) 1.00 hour (Bug #1039 (Closed): Report Payslip )
- Report Payslip
- 08:48 AM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
- Finance - Rekap Petty Cash Spin
- 08:46 AM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
- Input Jurnal AR Periode April 2022
- 08:45 AM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
- Finance - Invoice dan Faktur Pajak
- 08:45 AM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
- Finance - Lap Keu Investor 2020 s.d Maret 2022
- 08:42 AM Minova Corp Affairs 3.00 hours (Project: Minova Corp Affairs)
- Meeting PM/TL
- 08:34 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
04/11/2022
- 05:36 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Bug Fixing after Training BKT
- 05:36 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 05:36 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Training Phase 1 Project BKT
- 05:36 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- internal meeting
- 05:36 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Training Phase 1 Project BKT
- 05:35 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 05:35 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Training Phase 1 Project BKT
- 05:35 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 05:35 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Training Phase 1 Project BKT
- 05:35 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 05:34 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 05:34 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 05:34 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- UAT PMS BKT
- 05:34 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 05:33 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Setting dan Testing PMS BKT
- 05:33 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 05:33 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 05:32 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 05:02 PM BANK KALTENG 6.00 hours (Project: BANK KALTENG)
- Data Migration Bank Kalteng
- 03:38 PM PERTALIFE Bugs 1.50 hour (Bug #1031 (Closed): [HR-TM] Late Report - Trace Data yang ditarik untuk report)
- Analysis Report & Source Data
- 03:31 PM PERTALIFE Bugs 1.50 hour (Bug #1031 (Closed): [HR-TM] Late Report - Trace Data yang ditarik untuk report)
- Analysis Report & Source Data
- 11:38 AM PERTALIFE Bugs 1.00 hour (Bug #1031 (Closed): [HR-TM] Late Report - Trace Data yang ditarik untuk report)
- [HR-TM] Late Report - Trace Data yang ditarik untuk report
- 03:22 PM CLIENT SUPPORT 0.50 hour (Project: CLIENT SUPPORT)
- Update Case via wa ke email - E-mail ke User User
- 03:19 PM BANK FAMA 1.00 hour (Project: BANK FAMA)
- Case Penggabungan Pajak Employee (Modul Init Payroll Cummulation)
- 03:17 PM CLIENT SUPPORT 2.00 hours (Project: CLIENT SUPPORT)
- Meeting TL
- 03:15 PM CLIENT SUPPORT 1.00 hour (Project: CLIENT SUPPORT)
- Diskusi Internal CS
- 03:13 PM BANK MEGA SYARIAH - ES 0.50 hour (Project: BANK MEGA SYARIAH - ES)
- Support Proofing Pajak
- 03:12 PM PERTALIFE Bugs 1.00 hour (Project: PERTALIFE Bugs)
- Update WS All Employee
- 03:11 PM HINO 0.50 hour (Project: HINO)
- Case BPJS Kes Nilai Double a.n Gilang
- 03:10 PM PERTALIFE Bugs 1.00 hour (Project: PERTALIFE Bugs)
- Update WS All Employee
- 03:09 PM PERTALIFE Bugs 2.00 hours (Project: PERTALIFE Bugs)
- Meeting dengan User
- 03:06 PM HINO 0.50 hour (Project: HINO)
- Create Template Upload THR
- 02:59 PM HINO 0.50 hour (Project: HINO)
- Create Template Upload THR
- 02:56 PM BBG Bugs 0.50 hour (Bug #1024 (Closed): Gagal View Report Leave - waiting tidak selesai sampai 30 menit)
- Gagal View Report Leave - waiting tidak selesai sampai 30 menit
- 02:54 PM HINO 1.00 hour (Project: HINO)
- Case Approval ESS Cuti
- 02:51 PM BANK FAMA 2.00 hours (Project: BANK FAMA)
- Cek Case Selisih Pajak & THP
- 02:46 PM BANK FAMA 2.00 hours (Project: BANK FAMA)
- Cek Case Selisih Pajak - Proofing pajak
- 02:39 PM HINO 2.00 hours (Project: HINO)
- Forwarding Task-Task employee yang mengalami perubahan OM Recap (update terlambat)
- 02:38 PM HINO 0.50 hour (Project: HINO)
- Update Table Om-Recap
- 02:36 PM HINO 0.50 hour (Project: HINO)
- Case Medical family - tidak bisa Claim Medical
- 02:34 PM BBG Bugs 1.00 hour (Project: BBG Bugs)
- Delete All request ID ESS < tahun 2022
- 02:32 PM BBG Bugs 0.50 hour (Project: BBG Bugs)
- Case Delete Request Id Not Responding
- 01:16 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance - Update Cashplan, Tunjangan Maret 2022 dan Transaksi Bangking
- 12:02 PM PT ARITA 2.00 hours (Project: PT ARITA)
- Import New Organization Structure
- 08:52 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #1011 (Closed): Report Recruitment {Applicant Selection Report BMS})
- Report Recruitment {Applicant Selection Report BMS}
- 08:49 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #924 (Closed): [ HR ] - Training - Report Training List By Job)
- [ HR ] - Training - Report Training List By Job
- 08:44 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
04/08/2022
- 05:18 PM BANK WOORI SAUDARA 8.00 hours (Project: BANK WOORI SAUDARA)
- Penyelesaian Testing Report CV
- 05:16 PM PT ARITA 4.00 hours (Project: PT ARITA)
- New Organization Structure
- 05:15 PM TUGU PRATAMA INDONESIA (TPI) 4.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Report Posting to GL
- 03:08 PM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
- Update Rekap Kuota Mandays Client
- 03:07 PM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
- Finance - Rekap Petty Cash Ops
- 03:03 PM Minova Corp Affairs 5.00 hours (Project: Minova Corp Affairs)
- Finance - Rekap Tunjangan Maret 2022
- 01:51 PM BBG Bugs 1.00 hour (Project: BBG Bugs)
- Testing Modul Delete RegID - Error
- 01:45 PM BBG 1.50 hour (Project: BBG)
- Meeting dengan User Terkait ORM
- 01:43 PM CLIENT SUPPORT 1.50 hour (Project: CLIENT SUPPORT)
- Internal Meeting Minova
- 01:42 PM IMFI 1.00 hour (Project: IMFI)
- Cek case Report Training Certificate
- 01:40 PM IMFI 2.00 hours (Project: IMFI)
- Case Report Certificate
- 01:34 PM CLIENT SUPPORT 0.50 hour (Project: CLIENT SUPPORT)
- Diskusi & Info ke all staff untuk user guide case CS
- 01:32 PM IMFI 1.00 hour (Project: IMFI)
- Generate User & set Role
- 01:31 PM HINO 1.00 hour (Project: HINO)
- Back-up App Hino
- 01:29 PM HINO 1.00 hour (Project: HINO)
- Diskusi Case Medical - Generate Quota & ESS approval lainnya
- 01:28 PM HINO 0.50 hour (Project: HINO)
- Case Medical - Medical Plafond
- 01:24 PM PERTALIFE Bugs 1.00 hour (Project: PERTALIFE Bugs)
- Case Error Log in Mobile App
- 01:22 PM HINO 0.50 hour (Project: HINO)
- Update settingan OM Recap - Mandatory field
- 01:21 PM HINO 1.00 hour (Project: HINO)
- Guide update Customization > OM recap
- 11:46 AM CNAF 4.00 hours (Project: CNAF)
- Case ESS Leave - Error Calculate Quota Taken etc.
- 11:34 AM BANK WOORI SAUDARA 1.00 hour (Project: BANK WOORI SAUDARA)
- Cek User Expired BWS & Update User di User management
- 11:32 AM PERTALIFE Bugs 1.00 hour (Project: PERTALIFE Bugs)
- Case gagal log in App Mobile minova
- 11:31 AM PERTALIFE Bugs 2.00 hours (Project: PERTALIFE Bugs)
- Case Bank Data di bank Transfer salah atau tidak ada data
- 11:27 AM PERTALIFE Bugs 1.50 hour (Project: PERTALIFE Bugs)
- Case gagal log in App Mobile minova
- 11:23 AM HINO 1.50 hour (Project: HINO)
- Guide User Update ORM & Assignment
- 11:20 AM BBG Bugs 1.00 hour (Project: BBG Bugs)
- Cek Modul Delete RegID & request perbaikan Modul
- 11:17 AM HINO 1.00 hour (Project: HINO)
- Guide update Customization > OM recap
- 11:12 AM HINO Bugs 5.00 hours (Bug #1027 (Closed): Case OM-Recap Hasil Generate nya tidak sesaui ORM)
- Case approval ESS & Om Recap
- 11:10 AM CNAF 1.00 hour (Project: CNAF)
- Case THR ingin dibayar di masa payroll yang berbeda
- 11:06 AM ROHTO BUGS 1.00 hour (Bug #1028 (Closed): [ESS-LEAVE] validasi untuk backdate maksimal 14 hari tetapi terkadang masih bisa memilih lebih di backdate 15,16 dst)
- [ESS-LEAVE] validasi untuk backdate maksimal 14 hari tetapi terkadang masih bisa memilih lebih di backdate 15,16 dst
- 08:48 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
04/07/2022
- 05:01 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Mapping data BKT Payroll Benefit
- 04:49 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
- Mapping Data Bank Kalteng
- 03:19 PM Minova Corp Affairs 3.00 hours (Project: Minova Corp Affairs)
- HR - Rekap Data Finger Karyawaan Maret 2022
- 03:17 PM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
- Finance - Invoice dan Faktur Pajak
- 03:16 PM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
- Finance - Lap Keu Investor 2020 s.d Maret 2022
- 03:15 PM Minova Corp Affairs 12.00 hours (Project: Minova Corp Affairs)
- Finance - Lap Keu Investor 2020 s.d Maret 2022
- 03:14 PM Minova ERP Internal 9.00 hours (Project: Minova ERP Internal)
- Closing Periode Maret 2022
- 03:14 PM Minova Corp Affairs 7.00 hours (Project: Minova Corp Affairs)
- Finance - Update AP Periode Maret 2022
- 03:13 PM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
- HR - Kontrak Kerja dan NDA
- 03:06 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Feature #1025 (Closed): Report Generator)
- Fixing Look Up Report Generator
- 02:43 PM BBG Bugs 1.00 hour (Bug #1026 (Closed): Report Error - semua Report)
- Report Error - semua Report
- 11:59 AM TUGU PRATAMA INDONESIA (TPI) 1.00 hour (Feature #1023 (Closed): Payroll - Report Posting TO GL)
- Payroll - Report Posting TO GL
- 11:57 AM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Mapping data BKT Rincian gaji
- 11:57 AM TUGU PRATAMA INDONESIA (TPI) 3.00 hours (Bug #1022 (Closed): PA - Report CV )
- PA - Report CV
- 11:54 AM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
- Mapping Data Bank Kalteng
- 11:48 AM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Mapping data BKT
- 11:47 AM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Mapping data BKT dan import data BKT
- 11:42 AM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Mapping data Bank Kanteng (Per wage type)
- 11:38 AM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Mapping data Bank Kanteng (Per wage type)
- 11:30 AM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Mapping data Bank Kanteng
- 11:26 AM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Mapping data BKT
- 11:19 AM BANK KALTENG 6.00 hours (Project: BANK KALTENG)
- Mapping Data Bank Kalteng
- 11:18 AM TUGU PRATAMA INDONESIA (TPI) 2.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Organization Structure TPI
- 11:17 AM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Mapping Data Bank Kalteng
- 11:16 AM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Data Migration Bank Kalteng PA02
- 11:14 AM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Mapping data BKT
- 11:11 AM CLIENT SUPPORT 2.00 hours (Project: CLIENT SUPPORT)
- up aplikasi rohto development di server 77
- 11:09 AM PT ARITA 4.00 hours (Project: PT ARITA)
- Mapping Data PT Arita (ORM)
- 11:07 AM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
- Mapping Data Bank Kalteng (Wage Type)
03/28/2022
- 06:23 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Setting PMS Goal Setting dan Final
- 06:02 PM LPPOM HALAL 5.00 hours (Project: LPPOM HALAL)
- Setting Benefit BPJS Kesehatan Potongan 4% Tidak tampil di Payslip
- 06:00 PM IMFI 1.00 hour (Project: IMFI)
- Support Pak Fajar Setting Roles Matrix
- 05:58 PM HINO 2.00 hours (Feature #1005 (User Test): Enhancement TM To Payroll Employee Yang diberikan Fasititas Mobil Tidak Berhak atas Wifi Allowance & Transport Allowance)
- Deploy & Testing Ke Server Klien HINO
- 05:47 PM PERTALIFE Bugs 0.50 hour (Project: PERTALIFE Bugs)
- Cek Modul di Customization yang Belum Jalan
- 05:46 PM PERTALIFE Bugs 0.50 hour (Project: PERTALIFE Bugs)
- QA Test & Update Perbaikan Customization > Object Catalog Perta Life
- 05:44 PM PERTALIFE Bugs 1.00 hour (Project: PERTALIFE Bugs)
- Learning Talent and Training Management Pertalife
- 05:42 PM HINO 0.50 hour (Project: HINO)
- Case Hirarki Approval ESS
- 05:40 PM CNAF 2.00 hours (Project: CNAF)
- Cek Case ESS Leave - Jelman Nasri
- 05:38 PM PERTALIFE Bugs 0.50 hour (Project: PERTALIFE Bugs)
- Activated User ESS
- 04:56 PM PT ARITA 1.00 hour (Bug #1018 (QA Test): widget)
- widget
- 04:49 PM PT ARITA 1.00 hour (Bug #1017 (QA Test): report Leave)
- report Leave
- 04:29 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 04:29 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 04:27 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 03:47 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Bug #918 (Closed): [ HR ] Training - Report Training Duration)
- [ HR ] Training - Report Training Duration
- 11:30 AM PERTALIFE Bugs 1.00 hour (Bug #1007 (Closed): Customization > Object catalog Belum berfungsi)
- Customization > Object catalog Belum berfungsi
- 11:06 AM CLIENT SUPPORT 0.50 hour (Project: CLIENT SUPPORT)
- Update Status Issue-Issue yang sudah Closed di Redmine
- 10:46 AM PERTALIFE Bugs 0.50 hour (Project: PERTALIFE Bugs)
- Diskusi Pertanyaan User terkait improvement Aplikasi Mobile Attendance
- 10:42 AM PERTALIFE Bugs 0.50 hour (Project: PERTALIFE Bugs)
- Testing unlock User Minova via Aplikasi
- 09:50 AM LPPOM HALAL 0.50 hour (Project: LPPOM HALAL)
- Case Payslip Maret 2022 Double (Retro)
- 09:49 AM CLIENT SUPPORT 1.00 hour (Project: CLIENT SUPPORT)
- Update Time Sheet
- 09:47 AM CLIENT SUPPORT 1.00 hour (Project: CLIENT SUPPORT)
- Diskusi PMS
- 09:46 AM CNAF 1.00 hour (Project: CNAF)
- Case ESS Coaching - Approval employee yang DS1 nya kosong sebelumnya & Baru ditambahkan
- 09:42 AM CNAF 1.50 hour (Project: CNAF)
- Case ESS Coaching - Approval tidak membaca PIC
- 09:32 AM IMFI 2.50 hours (Bug #554 (Closed): ISSUE Payroll THR Direct Minus Akibat Perubahan Work Schedule backdate dari Running Payroll)
- QA Case THR Direct Minus Akibat Perubahan Work Schedule backdate dari Running Payroll
- 09:31 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 09:30 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 09:26 AM HINO 0.50 hour (Project: HINO)
- Case Hirarki Approval ESS - Diskusi dengan User & Remind untuk reply email
- 09:24 AM PERTALIFE Bugs 0.50 hour (Project: PERTALIFE Bugs)
- Create new User ESS
- 08:26 AM PT ARITA 1.00 hour (Bug #1014 (QA Test): Report Absence Recap)
- Report Absence Recap
03/25/2022
- 03:18 PM PT ARITA 5.00 hours (Bug #1001 (QA Test): Time Management - Total Quota Taken)
- Time Management - Total Quota Taken
03/24/2022
- 06:21 PM PERTALIFE Bugs 4.00 hours (Project: PERTALIFE Bugs)
- Analisis Case Selisih payroll Maret 2022- 6 employee
- 05:53 PM CNAF 1.00 hour (Support #1006 (Closed): Create Query untuk mengeluarkan Data Coaching - all Data 2022)
- Create Query untuk mengeluarkan Data Coaching - all Data 2022
- 04:30 PM TUGU PRATAMA INDONESIA (TPI) 1.00 hour (Feature #984 (Closed): Report Posting TO GL (Payroll))
- Testing posting to GL
- 03:08 PM PERTALIFE Bugs 1.00 hour (Project: PERTALIFE Bugs)
- Payroll Error Run 65 Employee
- 03:06 PM CNAF 0.50 hour (Project: CNAF)
- Case Tunjangan Sewa Rumah Angkanya tidak sesuai dengan yang seharusnya
- 03:02 PM CNAF 0.50 hour (Project: CNAF)
- Case Payroll Selisih
- 03:00 PM CNAF 1.00 hour (Project: CNAF)
- TM Data To Payroll Double Amount
- 02:54 PM PERTALIFE Bugs 2.00 hours (Project: PERTALIFE Bugs)
- Update Payroll benefit BPJS Ketenaga Kerjaan
- 10:43 AM HINO 2.50 hours (Feature #1005 (User Test): Enhancement TM To Payroll Employee Yang diberikan Fasititas Mobil Tidak Berhak atas Wifi Allowance & Transport Allowance)
- Fixing TMToPY Facilities Hino
- 09:34 AM HINO Bugs 1.50 hour (Bug #1008 (Closed): [Time Management] - Generate Absence Quota Berdasarkan Hiring Date belum memfilter employee yang status nya active)
- Fixing Generate Quota Emp Active Hino
- 09:31 AM IMFI Bugs 4.50 hours (Bug #720 (Deploy): [HR-PAYROLL] Perhitungan Pajak untuk Skenario Employee Meninggal)
- Fixing Pajak Orang Meninggal IMFI
03/23/2022
- 10:23 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 06:00 PM IMFI 0.50 hour (Bug #554 (Closed): ISSUE Payroll THR Direct Minus Akibat Perubahan Work Schedule backdate dari Running Payroll)
- QA Test Perbaikan
- 05:59 PM CNAF 1.00 hour (Project: CNAF)
- Support Tarik data Coaching all Data
- 05:56 PM HINO 1.00 hour (Project: HINO)
- Create User Manual - Create User
- 05:55 PM BBG Bugs 0.50 hour (Project: BBG Bugs)
- Case Bank Account Name di Bank Transfer Report Salah
- 05:54 PM BANK KALTENG 3.00 hours (Project: BANK KALTENG)
- Training Internal
- 05:52 PM CNAF 0.50 hour (Project: CNAF)
- Support cek error Upload Overtime Data ke Aplikasi & Testing
- 05:52 PM BANK KALTENG 5.00 hours (Project: BANK KALTENG)
- Mapping Master Data BKT (Personal Data dan Employee Assignment)
- 05:51 PM PERTALIFE Bugs 3.00 hours (Bug #1009 (Assigned): [Personal Administration] Generate Employee ID - Employee Hiring)
- Case Employee ID yang tergenerate tidak sesuai format seharusnya
- 05:49 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Meeting Internal
- 05:48 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Setting Training & Talen report
- 05:47 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 05:46 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 05:43 PM CLIENT SUPPORT 4.00 hours (Project: CLIENT SUPPORT)
- Membuat Log Issue All Klien
- 05:42 PM BANK FAMA 3.50 hours (Project: BANK FAMA)
- Support Pak Kevin Working Schedule, Personal Schedule, Public holiday dan Holiday Calender
- 10:52 AM PERTALIFE Bugs 0.50 hour (Project: PERTALIFE Bugs)
- Validate Manual Payroll Calculate AJTM to Minova System
- 10:46 AM BBG Bugs 1.00 hour (Bug #960 (Closed): [HR-Benefit Loan] Loan Balance Selalu Error)
- QA Test Case Loan BBG
- 09:44 AM BBG Bugs 1.00 hour (Bug #960 (Closed): [HR-Benefit Loan] Loan Balance Selalu Error)
- QA BBG Loan Case
- 10:40 AM TUGU PRATAMA INDONESIA (TPI) 1.50 hour (Feature #984 (Closed): Report Posting TO GL (Payroll))
- Fixing Report Posting GL TPI
- 10:38 AM TUGU PRATAMA INDONESIA (TPI) 2.00 hours (Feature #984 (Closed): Report Posting TO GL (Payroll))
- Fixing Report Posting GL TPI
- 09:42 AM CNAF 1.00 hour (Project: CNAF)
- Case Upload Data Additional JP
- 09:39 AM CNAF 0.50 hour (Project: CNAF)
- Overtime Case - Not Calculate in Payroll
- 09:36 AM PERTALIFE Bugs 3.50 hours (Project: PERTALIFE Bugs)
- Checking all difference amount of payroll calculation to manual Pertalife & Solving Case
- 08:02 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Also available in: Atom