Activity
From 02/19/2022 to 03/20/2022
03/19/2022
- 08:05 PM TUGU PRATAMA INDONESIA (TPI) 1.00 hour (Bug #987 (Closed): Report Tugu Employee CV)
- Report Tugu Employee CV
03/18/2022
- 06:32 PM CNAF 1.00 hour (Project: CNAF)
- Cek Case Delegate To ESS Leave
- 06:31 PM BANK FAMA 0.50 hour (Project: BANK FAMA)
- Update penjelasan WT Tunjangan lain lain ke user
- 06:30 PM Asuransi Bintang - Existing 0.50 hour (Project: Asuransi Bintang - Existing)
- Cek Case Grade di Job to Talent Match up
- 06:29 PM PERTALIFE Bugs 4.50 hours (Project: PERTALIFE Bugs)
- Update payroll Tunjangan Cuti - setting parameter & guide user
- 05:47 PM TUGU PRATAMA INDONESIA (TPI) 5.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Setting dan testing payroll ESS payslip & Payroll control
- 05:46 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- User manual & Script
- 05:24 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 04:12 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Setting PMS Review dan Final di project BKT
- 03:55 PM TUGU PRATAMA INDONESIA (TPI) 4.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Payroll Posting to GL & mapping data report Benefit(Medical)
- 03:54 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- User manual & Script
- 10:53 AM ROHTO BUGS 1.00 hour (Bug #983 (QA Test): [HR-TIME DATA] Report Time Sheet Recap masih ada keliru untuk membaca keterlambatan nya)
- [HR-TIME DATA] Report Time Sheet Recap masih ada keliru untuk membaca keterlambatan nya
- 10:50 AM TUGU PRATAMA INDONESIA (TPI) 1.00 hour (Bug #985 (Closed): Report Travel Employee)
- Report Travel Employee
- 09:39 AM HINO 0.50 hour (Project: HINO)
- Case Error saving Education Data - Caused by Year Field Not Defined in PHRPA0008
- 09:19 AM CNAF 1.50 hour (Bug #930 (Closed): ESS Pilihan isi Delegate to tidak sesuai dengan Divisi pada OM)
- Check Case - lokasi code
- 09:07 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
03/17/2022
- 04:52 PM BANK WOORI SAUDARA 0.50 hour (Bug #981 (Closed): Report CV indonesia & inggris)
- Create Redmine & Update info ke User
- 02:59 PM BANK WOORI SAUDARA 1.00 hour (Bug #981 (Closed): Report CV indonesia & inggris)
- Report CV indonesia & inggris
- 04:50 PM BANK WOORI SAUDARA 0.50 hour (Project: BANK WOORI SAUDARA)
- Update untuk Field tanggal Lulus Program" & "HR. Dev Program" di Master Data Employee: Pendidikan Informal
- 04:46 PM PERTALIFE Bugs 2.50 hours (Project: PERTALIFE Bugs)
- Update WT & Payroll Benefit DPLK
- 04:40 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Setting PMS di project BKT
- 04:38 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 04:38 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 04:37 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 04:36 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 04:36 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 11:58 AM HINO 1.00 hour (Bug #980 (Revise): [ESS - Leave] Develop Service Generate Absence Quota)
- Create Instruksi & Requirements develop service Generate Absence Quota
- 11:05 AM BANK FAMA 0.50 hour (Project: BANK FAMA)
- Analisa Case Perhitungan Pajak untuk Benefit Payroll
- 11:04 AM BANK FAMA 0.50 hour (Project: BANK FAMA)
- Buat Tutorial Input Init Payroll agar Pajak/income dari company sebelumnya pajak BFI benar
- 11:01 AM BBG Bugs 1.00 hour (Bug #960 (Closed): [HR-Benefit Loan] Loan Balance Selalu Error)
- Testing hasil perbaikan Error
- 09:12 AM BANK WOORI SAUDARA 0.50 hour (Project: BANK WOORI SAUDARA)
- Diskusi internal & Update Review ke user
03/16/2022
- 06:37 PM CNAF 0.50 hour (Project: CNAF)
- Case data Assignment & Payroll Basic Data tidak masuk
- 06:36 PM HINO 1.00 hour (Project: HINO)
- Create Tutorial Generate Absence Quota
- 06:35 PM CNAF 0.50 hour (Project: CNAF)
- Case payroll - upload data backdated
- 06:33 PM PERTALIFE Bugs 1.50 hour (Project: PERTALIFE Bugs)
- Assisting Update data & upload payroll Reguler
- 06:31 PM BANK FAMA 1.50 hour (Project: BANK FAMA)
- Meeting dengan Tim Payroll FAMA - solving case selisih income & tax
- 06:29 PM PERTALIFE Bugs 0.50 hour (Project: PERTALIFE Bugs)
- Diskusi Case wage type khusus untuk payroll Benefit Direksi Perta Life
- 06:27 PM HINO 0.50 hour (Project: HINO)
- Case Modul generate Absence Quota
- 06:24 PM BANK FAMA 2.00 hours (Project: BANK FAMA)
- Case Selisih THP & Pajak beberapa employee
- 06:20 PM TUGU PRATAMA INDONESIA (TPI) 4.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Meeting & Testing
- 06:19 PM TUGU PRATAMA INDONESIA (TPI) 4.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Setting Prameter Travel
- 06:18 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- User manual
- 06:16 PM TUGU PRATAMA INDONESIA (TPI) 4.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Testing dan setting report posting TO GL & benefit
- 06:15 PM TUGU PRATAMA INDONESIA (TPI) 2.00 hours (Bug #974 (Closed): Report Posting TO GL (Payroll))
- Testing dan setting
- 10:37 AM TUGU PRATAMA INDONESIA (TPI) 2.50 hours (Bug #974 (Closed): Report Posting TO GL (Payroll))
- Fixing Report Posting GL TPI
- 06:09 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
- Setting Formulasi Wage Type Project Arita
- 06:08 PM BANK KALTENG 6.00 hours (Project: BANK KALTENG)
- Setting PMS di project BKT
- 06:08 PM BANK KALTENG 3.00 hours (Project: BANK KALTENG)
- Setting PMS di project BKT
- 12:11 PM BBG Bugs 3.50 hours (Bug #960 (Closed): [HR-Benefit Loan] Loan Balance Selalu Error)
- Fixing Error Loan
- 10:28 AM BBG Bugs 5.00 hours (Bug #960 (Closed): [HR-Benefit Loan] Loan Balance Selalu Error)
- Fixing Error Loan
- 11:01 AM Minova Corp Affairs 6.00 hours (Project: Minova Corp Affairs)
- Finance - Rekap Jurnal Bank Periode Februari 2022
- 10:59 AM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
- HR - Interview BA Batch II
- 10:30 AM HINO Bugs 1.00 hour (Bug #966 (Closed): [Time Management] - Generate Absence Quota Berdasarkan Hiring Date)
- Fixing Generate Quota
- 09:05 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
03/15/2022
- 06:30 PM HINO 0.50 hour (Project: HINO)
- Create Tutorial Employee Hiring
- 06:20 PM BBG 1.50 hour (Bug #975 (New): Medical PlafonRemain & PlafonUsed Tidak Ter update otomatis)
- Update PlafonRemain & PlafonUsed manual Query
- 06:18 PM HINO Bugs 4.00 hours (Project: HINO Bugs)
- Update Query Data Staging MSDAT_EMPASSIGNMENT
- 06:16 PM IMFI Bugs 1.00 hour (Project: IMFI Bugs)
- Add Akun Minova-HR klien Fajar
- 06:13 PM CLIENT SUPPORT 2.00 hours (Project: CLIENT SUPPORT)
- Update Issue Log Tugu Mandiri
- 06:04 PM BANK KALTENG 1.00 hour (Bug #943 (Closed): Pemilihan tanggal Cuti Besar Error)
- Pemilihan tanggal Cuti Besar Error
- 05:53 PM PERTALIFE Bugs 0.50 hour (Project: PERTALIFE Bugs)
- Update LOG Support- Tugu Mandiri 2022
- 05:51 PM CLIENT SUPPORT 0.50 hour (Project: CLIENT SUPPORT)
- Mengisi Log Time dari tanggal 14/03/2022
- 05:49 PM PERTALIFE Bugs 1.00 hour (Project: PERTALIFE Bugs)
- Case Clock in attendance Mobile
- 05:46 PM HINO Bugs 0.50 hour (Project: HINO Bugs)
- Testing perbaikan Modul Generate Absence Quota
- 05:43 PM BBG 0.50 hour (Project: BBG)
- Update assignment employee pensiun employee status ke resign dari pensiun
- 05:39 PM BANK FAMA 0.50 hour (Project: BANK FAMA)
- Case Assignment hiring & re-assignment yang tertukar
- 05:35 PM BANK FAMA 0.50 hour (Project: BANK FAMA)
- Case 1 employee double NIK
- 05:33 PM BANK FAMA 1.00 hour (Project: BANK FAMA)
- Case Additional payroll setting Data
- 05:20 PM BANK FAMA 1.50 hour (Project: BANK FAMA)
- Update Wage Type Tunjangan & Potongan lain-lain di payslip confoguration, wagetype recap detail, MD Sub Configuration
- 05:13 PM BBG 1.50 hour (Project: BBG)
- Update Leave Data di PHRPA0018 & PHRPA0017
- 05:07 PM PERTALIFE Bugs 0.50 hour (Project: PERTALIFE Bugs)
- Permintaan update Overtime menjadi Irreguler Tax, Canceled, Reason: Aligning to Government Regulation (dilakukan berd...
- 05:02 PM HINO 0.50 hour (Project: HINO)
- Redmine Hino untuk fixing modul generate absence Quota
- 04:58 PM HINO 2.00 hours (Project: HINO)
- Discuss Internal Case Skenario Generate Absence Quota Hino & Discuss dengan User
- 04:53 PM BBG 2.00 hours (Project: BBG)
- Testing Perbaikan ESS Leave agar bisa transfer data ke PHRPA0018 & Update PHRPA0017
- 03:50 PM TUGU PRATAMA INDONESIA (TPI) 2.00 hours (Feature #972 (Closed): Report Payslip )
- Report Payslip
- 01:50 PM BANK KALTENG 1.00 hour (Project: BANK KALTENG)
- Membuat user manual untuk project Migration Enhancement BMS
- 01:48 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
- Setting parameter untuk PMS BKT
- 01:45 PM PT BMS MIGRATION & ENHANCEMENT 1.50 hour (Bug #969 (Closed): Generate Absence Quota)
- Checking Generate Absence Quota BMS
- 01:42 PM BANK KALTENG 1.50 hour (Bug #959 (Closed): [Payroll Administration] Report Bekal Cuti )
- Fixing Report Bekal Cuti BKT
- 01:40 PM BBG Bugs 5.00 hours (Bug #960 (Closed): [HR-Benefit Loan] Loan Balance Selalu Error)
- Fixing Error Loan
- 11:56 AM BANK KALTENG 1.30 hour (Feature #957 (Closed): [Time Report] Attandance Recap)
- [Time Report] Attandance Recap
- 10:09 AM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
- Finance - Update AP Feb 2022
- 10:08 AM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
- Finance - Update Biaya Masih Harus Dibayar Periode Maret 2022
- 10:07 AM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
- Finance - Update AR Periode 14 Maret 2022
- 10:07 AM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
- Finance - Invoice dan Faktur Pajak
- 10:06 AM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
- HR - Interview Marcom Batch II
- 08:46 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
03/14/2022
- 06:53 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Setting PMS di project BKT
- 05:32 PM ROHTO BUGS 1.00 hour (Project: ROHTO BUGS)
- 05:31 PM ROHTO BUGS 1.30 hour (Project: ROHTO BUGS)
- 05:30 PM ROHTO BUGS 3.00 hours (Project: ROHTO BUGS)
- 05:26 PM ROHTO BUGS 3.00 hours (Bug #970 (Closed): [HR-TIME DATA] Report Overtime Rohto masih tetap menampilkan employee Head Office padahal filter nya employee Pabrik)
- 12:04 PM ROHTO BUGS 1.00 hour (Bug #970 (Closed): [HR-TIME DATA] Report Overtime Rohto masih tetap menampilkan employee Head Office padahal filter nya employee Pabrik)
- [HR-TIME DATA] Report Overtime Rohto masih tetap menampilkan employee Head Office padahal filter nya employee Pabrik
- 05:23 PM IMFI Bugs 1.50 hour (Project: IMFI Bugs)
- Support IMFI Jennifer & Fajar
- 05:10 PM BBG Bugs 1.00 hour (Project: BBG Bugs)
- Setting Benefit BPJS-TK Pensiun Max Base maret 2022 ( 9.077.600 )
- 04:53 PM PT BMS MIGRATION & ENHANCEMENT 5.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Membuat User Manual & Meeting
- 04:52 PM TUGU PRATAMA INDONESIA (TPI) 3.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Setting Payslip
- 04:28 PM HINO Bugs 1.00 hour (Project: HINO Bugs)
- Meeting Online Issue Data Staging
- 04:26 PM Bank Mega 1.00 hour (Project: Bank Mega)
- Meeting Online dengan Tim Bank Mega
- 04:25 PM CLIENT SUPPORT 1.00 hour (Bug #971 (QA Test): [HR-TIME DATA] Report Overtime Rohto masih tetap menampilkan employee Head Office padahal filter nya employee Pabrik)
- [HR-TIME DATA] Report Overtime Rohto masih tetap menampilkan employee Head Office padahal filter nya employee Pabrik
- 10:47 AM HINO Bugs 0.50 hour (Project: HINO Bugs)
- Create Redmine - Case Generate Absence Quota Hino
- 10:44 AM BBG Bugs 1.00 hour (Project: BBG Bugs)
- Meeting BBG - Case Server Rusak
- 10:42 AM BBG Bugs 2.00 hours (Project: BBG Bugs)
- Meeting Zoom dengan Tim BBG
- 10:40 AM BANK KALTENG 1.00 hour (Bug #963 (Closed): Report Attendance - Sequance tidak mulai dari 1 pada employee selanjutnya)
- Report Attendance - Sequance tidak mulai dari 1 pada employee selanjutnya
- 09:59 AM BANK KALTENG 1.00 hour (Feature #962 (Closed): [Employee Report] Report Secondary Job)
- [Employee Report] Report Secondary Job
- 09:12 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
03/13/2022
- 09:54 PM IMFI Bugs 2.00 hours (Bug #936 (Closed): Employee Payroll Report Tidak dapat menampilkan Report)
- Cek Report data Employee Payroll Report Tidak dapat menampilkan Report
- 09:45 PM HINO 2.50 hours (Project: HINO)
- Setting Employee Office & Tax Office
- 09:37 PM HINO 1.00 hour (Project: HINO)
- Setting Maximal Base BPJS-TK Pensiun
- 09:31 PM PERTALIFE Bugs 2.00 hours (Project: PERTALIFE Bugs)
- Support Pak Alam Cek Access akun minova Gilang Pradityo
- 09:27 PM PERTALIFE Bugs 1.50 hour (Project: PERTALIFE Bugs)
- Support Pak Yahmin Update EmployeeID menyesuaikan data yang di kirim excel
- 09:21 PM ALIF ( Al Ijarah Indonesia Finance ) 1.50 hour (Project: ALIF ( Al Ijarah Indonesia Finance ))
- Setting Maximal Base BPJS-TK Pensiun
- 09:16 PM CLIENT SUPPORT 2.00 hours (Project: CLIENT SUPPORT)
- Meeting Koordinasi Leader dan PM
- 09:13 PM BANK FAMA 2.00 hours (Project: BANK FAMA)
- Setting Maximal Base BPJS-TK Pensiun
- 09:09 PM Asuransi Bintang - Existing 1.00 hour (Project: Asuransi Bintang - Existing)
- Support mbak Lala Employee Resign masih ada di OM
- 09:00 PM Asuransi Bintang - Existing 1.50 hour (Project: Asuransi Bintang - Existing)
- Meeting Koordinasi dengan Tim Asuransi Bintang
- 08:37 PM Asuransi Bintang - Existing 6.50 hours (Project: Asuransi Bintang - Existing)
- Support Mbak Ami Overtime tidak tarcalculate
- 08:33 PM Asuransi Bintang - Existing 1.50 hour (Project: Asuransi Bintang - Existing)
- Setting Maximal Base BPJS-TK Pensiun
- 07:41 PM BBG Bugs 2.00 hours (Project: BBG Bugs)
- Deploy App Minova New Design
- 07:38 PM IMFI Bugs 1.00 hour (Support #965 (New): Access MinovaHR Terlock Baru Satu Kali Salah Password)
- Support Bu asima Access MinovaHR Terlock Baru Satu Kali Salah Password
- 07:09 PM HINO Bugs 3.00 hours (Support #964 (New): Ganti isi Field Payroll Grade Pada Table Staging)
- Ganti isi Field Payroll Grade Pada Table Staging ( Update SP )
- 07:01 PM Asuransi Bintang - Existing 2.00 hours (Project: Asuransi Bintang - Existing)
- Transfer Applicant Profile to Employee Profile ( Transfer via Query )
- 01:59 PM PT ARITA 8.00 hours (Project: PT ARITA)
- Client visit to ensure data migration (without driver)
03/11/2022
- 06:30 PM CLIENT SUPPORT 0.50 hour (Project: CLIENT SUPPORT)
- Update Time Sheet
- 06:28 PM HINO 2.50 hours (Project: HINO)
- Case Medical - Medical Plafond
- 06:25 PM HINO 1.00 hour (Project: HINO)
- Analisa Case ESS Leave - Kondisi Otomatis Generate Kuota Cuti berdasarkan ulang tahun masa kerja
- 05:51 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS Deploy & Metting
- 05:50 PM TUGU PRATAMA INDONESIA (TPI) 4.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Migrasi data payroll
- 03:14 PM CNAF 0.50 hour (Project: CNAF)
- Assisting user upload data payroll basic data & fixing problem error
- 03:12 PM HINO 1.00 hour (Project: HINO)
- Assisting user update Organization Management to New Assignment
- 01:49 PM BANK KALTENG 3.00 hours (Project: BANK KALTENG)
- Memperbaiki settingan setelah diskusi terkait Payroll Bank Kalteng
- 01:49 PM BANK KALTENG 1.00 hour (Project: BANK KALTENG)
- Diskusi mengenai kebutuhan project BKT
- 11:57 AM PERTALIFE Bugs 0.50 hour (Project: PERTALIFE Bugs)
- Cek Case eSPT tidak keluar untuk 100-an employee
- 11:20 AM CNAF 1.00 hour (Project: CNAF)
- Gagal Upload Payroll Basic Data - Bank Account Problem
- 10:29 AM PERTALIFE Bugs 0.50 hour (Project: PERTALIFE Bugs)
- Update Company Name PT Perta Life Insurance & Create Tutorial
- 10:14 AM BBG Bugs 1.00 hour (Bug #960 (Closed): [HR-Benefit Loan] Loan Balance Selalu Error)
- Create summary hasil testing Loan BBG untuk beberapa kondisi simulasi
- 10:10 AM BANK FAMA 2.00 hours (Project: BANK FAMA)
- Update Wage Type Baru untuk Bank FAMA International
- 09:59 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 09:59 AM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
- Testing dan Koordinasi dengan PM terkait di Project BKT
- 09:58 AM TUGU PRATAMA INDONESIA (TPI) 2.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Migrasi Data Payroll
- 09:57 AM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS Deploy & Metting
- 09:56 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 09:10 AM IMFI 1.50 hour (Project: IMFI)
- Support update BPJS Pensiun max. Tarif to User (assist user)
- 09:07 AM HINO 0.50 hour (Project: HINO)
- Case Medical
- 09:04 AM CNAF 0.50 hour (Project: CNAF)
- Support update BPJS Pensiun max. Tarif to User (assist user)
- 09:02 AM CNAF 1.00 hour (Project: CNAF)
- Support update BPJS Pensiun max. Tarif to User (assist user)
- 09:00 AM BBG Bugs 2.50 hours (Project: BBG Bugs)
- Case Loan Selalu keluar di payslip padahal sudah lunas (case special repayment)
- 08:56 AM PERTALIFE Bugs 0.50 hour (Project: PERTALIFE Bugs)
- Case ESS Leave
03/10/2022
- 02:50 PM BANK KALTENG 1.00 hour (Bug #956 (Closed): [Time Report] Report Leave )
- [Time Report] Report Leave
- 02:15 PM BANK KALTENG 1.00 hour (Project: BANK KALTENG)
- Setting parameter untuk Attandance Mobile BKT
- 02:15 PM BANK KALTENG 5.00 hours (Project: BANK KALTENG)
- Testing Web BKT
- 10:39 AM TUGU PRATAMA INDONESIA (TPI) 2.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Migrasi Data Payroll Table [PHRPYTR0301CUM]
- 10:38 AM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Meeting dan deploy BMS
- 09:48 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 09:45 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 09:45 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 09:44 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 09:44 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 09:44 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 09:43 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 09:43 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 09:42 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 09:41 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 09:41 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMA
- 09:39 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 09:39 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 09:38 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 09:38 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- BMS
- 09:05 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
03/09/2022
- 06:37 PM CLIENT SUPPORT 0.50 hour (Project: CLIENT SUPPORT)
- preparation
- 06:36 PM Asuransi Bintang - Existing 0.50 hour (Project: Asuransi Bintang - Existing)
- Support case Join History
- 06:33 PM HINO 1.50 hour (Project: HINO)
- Create Tutorial Cara Me-maintain Struktur Organisasi Terkait dengan Assignment Karyawan
- 06:31 PM PERTALIFE Bugs 3.00 hours (Project: PERTALIFE Bugs)
- Support Payroll & Proofing Pajak Bulanan Beberapa Employee
- 05:37 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Testing Mobile dan Web BKT
- 11:53 AM PERTALIFE Bugs 0.50 hour (Project: PERTALIFE Bugs)
- Case Employee Resign, Namun payroll Januari masih ada
- 11:52 AM PERTALIFE Bugs 1.00 hour (Project: PERTALIFE Bugs)
- Support Payroll - Upload data & Mengarahkan User
- 11:50 AM HINO 1.00 hour (Project: HINO)
- Diskusi Internal Case Hino - Keseuaian kesepakatan Saat Project dan Aplikasi Saat ini
- 09:04 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
03/08/2022
- 07:16 PM HINO 0.50 hour (Project: HINO)
- Update enddeduction Leave 2021 to 20220331
- 07:14 PM CNAF 1.50 hour (Project: CNAF)
- Case ESS Coaching
- 07:12 PM HINO 2.00 hours (Project: HINO)
- Update OM Recap
- 06:25 PM IMFI Bugs 3.30 hours (Bug #936 (Closed): Employee Payroll Report Tidak dapat menampilkan Report)
- Employee Payroll Report Tidak dapat menampilkan Report
- 06:23 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Meeting dan deploy BMS
- 04:57 PM BANK KALTENG 1.00 hour (Bug #945 (Closed): Employee Report -> Curriculum Vitae (Tidak Muncul))
- Employee Report -> Curriculum Vitae (Tidak Muncul)
- 04:53 PM PERTALIFE 1.00 hour (Project: PERTALIFE)
- Testing dn Setting Parametter untuk Modul PMS
- 04:52 PM BANK KALTENG 5.00 hours (Project: BANK KALTENG)
- Mapping Master Data BKT (Personal Data dan Employee Assignment)
- 04:51 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
- Testing ESS Mobile BKT terkait Attandance dan Pengajuan Leave
- 02:19 PM PERTALIFE Bugs 2.00 hours (Project: PERTALIFE Bugs)
- Support Payroll- Selisih hasil running
- 02:17 PM CNAF 2.00 hours (Bug #944 (Closed): ESS Coaching)
- Case ESS Coaching
- 08:59 AM CNAF 1.00 hour (Bug #944 (Closed): ESS Coaching)
- Case ESS Coaching
- 10:22 AM BANK FAMA 1.00 hour (Bug #946 (Closed): Perbaikan Report All Employee pada Field Resign Date Mohon berikan separator )
- Perbaikan Report All Employee pada Field Resign Date Mohon berikan separator
- 08:57 AM HINO Bugs 1.00 hour (Project: HINO Bugs)
- Diskusi Internal & info ke user
- 08:55 AM PERTALIFE Bugs 2.50 hours (Project: PERTALIFE Bugs)
- Support Payroll- Selisih hasil running
- 08:54 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
03/07/2022
- 07:10 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
- Mapping Mster Data BKT (Personal Data dan Employee Assignment)
- 06:37 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Deploy BMS Migrasi
- 05:41 PM TUGU PRATAMA INDONESIA (TPI) 2.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Migrasi Data Payroll Table [PHRPYTR0301CUM]
- 05:41 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #866 (Closed): Recruitment - Applicant Selection Report BMS )
- Recruitment - Applicant Selection Report BMS
- 04:50 PM ROHTO BUGS 3.00 hours (Bug #942 (Closed): [HR-TIME DATA] Report Time Sheet Recap salah membaca nilai keterlambatan dan data2 lain nya)
- [HR-TIME DATA] Report Time Sheet Recap salah membaca nilai keterlambatan dan data2 lain nya
- 04:33 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Meeting dan Panduan Testing Payroll untuk running
- 11:13 AM PERTALIFE Bugs 2.00 hours (Project: PERTALIFE Bugs)
- Assisting Payroll Running & Correction Data
- 10:40 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
03/04/2022
- 06:40 PM HINO 4.50 hours (Project: HINO)
- Case Hirarki Approval ESS
- 06:23 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
- Membuat master data PA dan Employee Administration BKT
- 06:23 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
- Meeting dengak BKT terkait Master Data
- 06:22 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
- Membuat master data PA dan Employee Administration BKT
- 06:22 PM TUGU PRATAMA INDONESIA (TPI) 8.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Migrasi Data Payroll 301 & Mapping data Traning
- 04:30 PM MINOVAES - PRODUCT 2.00 hours (Bug #368 (QA Test): Modul Payroll - Report BPJS TK Karyawan keluar )
- Modul Payroll - Report BPJS TK Karyawan keluar
- 11:42 AM LPPOM HALAL 1.50 hour (Project: LPPOM HALAL)
- Case Neraca 2021 tidak Balance
- 10:29 AM CLIENT SUPPORT 1.00 hour (Project: CLIENT SUPPORT)
- Update BPJS Pensiun ke User
- 10:27 AM HINO 0.50 hour (Project: HINO)
- Update Reminder Case ORM & Hirarki Approval Hino
- 10:25 AM Asuransi Bintang - Existing 1.00 hour (Project: Asuransi Bintang - Existing)
- Case Employee Profile
- 10:20 AM CNAF 1.00 hour (Project: CNAF)
- Update report 1721 untuk Company Name
- 10:17 AM PERTALIFE Bugs 0.50 hour (Project: PERTALIFE Bugs)
- Case Inbox ORM belum diupdate & Minta Forwarding Task ESS Leave
- 10:15 AM PERTALIFE Bugs 0.50 hour (Project: PERTALIFE Bugs)
- Case User Tidak bisa Log-in
- 10:13 AM HINO 0.50 hour (Project: HINO)
- Case User in-Active
- 10:10 AM CLIENT SUPPORT 3.00 hours (Project: CLIENT SUPPORT)
- Create Tutorial update BPJS Pensiun - Untuk User ES
- 10:06 AM Bank Mega Syariah Existing 1.00 hour (Project: Bank Mega Syariah Existing)
- Create Tutorial update BPJS Pensiun
- 10:06 AM TUGU PRATAMA INDONESIA (TPI) 5.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Setting Payroll & Traning Management
- 10:04 AM CNAF 2.00 hours (Project: CNAF)
- Cek Case Delegate To ESS Leave
- 10:04 AM TUGU PRATAMA INDONESIA (TPI) 3.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Meeting dan testing payroll, OM , Medical , Travel , Traning Mng
- 10:01 AM BANK WOORI SAUDARA 3.00 hours (Project: BANK WOORI SAUDARA)
- Update, perbaikan & Testing Review Aplikasi Minova BWS
- 09:15 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
03/02/2022
- 06:13 PM BANK FAMA 1.50 hour (Project: BANK FAMA)
- Guide Bu ilvia Setting Banefit Calcuation pada Cuztomization
- 06:08 PM BANK FAMA 6.00 hours (Project: BANK FAMA)
- Fixing/Setting Report Wagetype Recap & WageType DPLK Top Up tidak bisa di input amount
- 06:03 PM HINO Bugs 4.00 hours (Project: HINO Bugs)
- Support Mas Defri Siapkan Template Upload Payroll Basic Data dan Mapingan data Payroll Class dan Payroll Grade
- 05:56 PM ROHTO BUGS 2.00 hours (Project: ROHTO BUGS)
- Meeting dengan Bu Meila
- 05:50 PM ROHTO BUGS 1.00 hour (Project: ROHTO BUGS)
- Support Bu Meila Add Authorize User Management
- 05:43 PM LPPOM HALAL 3.00 hours (Bug #913 (Closed): Form Employee Movement > Employee Hiring > IHATEC > IHATEC " tombol execute tidak merespon/ tidak menampilkan result input personal data")
- Proses Deploy
- 05:36 PM BANK FAMA 1.00 hour (Project: BANK FAMA)
- Meeting dengan Bu ilvia & Bu susan guide tentang Personal Administration dan User Management
- 05:29 PM HINO Bugs 2.50 hours (Project: HINO Bugs)
- Support Mbak Zahra Guide Employee Administration Family
- 05:25 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
- Testing aplikasi mobile BKT untuk proses Attandance dan pengajuan Leave.
- 05:23 PM Asuransi Bintang - Existing 4.00 hours (Project: Asuransi Bintang - Existing)
- Support Mas Rusdi Upload Data Employee Profile
- 05:23 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
- Mempelajari cara membuat ESS PMS
- 05:20 PM PERTALIFE 2.00 hours (Project: PERTALIFE)
- Setting dan melakukan perubahan setelah diskusi dengan PT. Pertalife
- 05:18 PM PERTALIFE 2.00 hours (Project: PERTALIFE)
- Meeting guna menyampaikan progress project dan diskusi terkait kebutuhan untuk PMS PT. Pertalife
- 05:18 PM ALIF ( Al Ijarah Indonesia Finance ) 4.00 hours (Bug #939 (Closed): Running Error Values was Either too large or too small for an unsigned byte)
- Cek Data Melalui VPN Remote Desktop
- 04:50 PM ALIF ( Al Ijarah Indonesia Finance ) 1.00 hour (Bug #939 (Closed): Running Error Values was Either too large or too small for an unsigned byte)
- Cek Data Melalui Remote Anydesk dengan Pak Risdi
- 04:40 PM MINOVAES - PRODUCT 1.00 hour (Bug #367 (QA Test): Modul Payroll BPJS - Report BPJS TK Karyawan masuk )
- Modul Payroll BPJS - Report BPJS TK Karyawan masuk
- 04:13 PM PERTALIFE Bugs 3.00 hours (Project: PERTALIFE Bugs)
- Support Guide Pak Yahmin Employee Hiring (WFH)
- 04:08 PM BBG 8.00 hours (Bug #795 (Closed): [HR-Payroll] Running Payroll Data Overtime Tidak Terkalkulasi)
- Support Mbak Aline BBG Overtime tidak tercalculate dan Medical double (WFH)
- 04:02 PM MINOVAES - PRODUCT 1.00 hour (Bug #365 (QA Test): Modul Payroll - Report BPJS Kesehatan recap )
- Modul Payroll - Report BPJS Kesehatan recap
- 03:42 PM MINOVAES - PRODUCT 1.30 hour (Bug #366 (QA Test): Modul Payroll BPJS - Report Pensiun )
- Modul Payroll BPJS - Report Pensiun
- 03:41 PM BANK FAMA 2.00 hours (Project: BANK FAMA)
- Support Bu Ilvia Setting Pretax DPLK TOP UP ( WFH )
- 03:35 PM PERTALIFE Bugs 2.00 hours (Project: PERTALIFE Bugs)
- Support Guide Pak Yahmin (WFH)
- 03:29 PM Bank Mega Syariah Existing 1.00 hour (Project: Bank Mega Syariah Existing)
- Meeting Case ESS PMS Bersama Pak Effendi ( WFH )
- 02:57 PM PERTALIFE Bugs 3.00 hours (Project: PERTALIFE Bugs)
- Support Pak yahmin Payroll Additional Tidak Terupload ( WFH )
- 02:54 PM HINO 6.00 hours (Bug #933 (Closed): Komponen Gaji Double pada Report Payslip )
- Cek Komponen Gaji Double pada Report Payslip ( WFH )
- 02:24 PM IMFI Bugs 1.00 hour (Bug #936 (Closed): Employee Payroll Report Tidak dapat menampilkan Report)
- Employee Payroll Report Tidak dapat menampilkan Report
- 01:34 PM Minova Corp Affairs 4.50 hours (Project: Minova Corp Affairs)
- Finance, Audit, GA
- 09:57 AM Minova Corp Affairs 3.50 hours (Project: Minova Corp Affairs)
- Finance, GA, Trial Balance 2020
- 09:21 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
03/01/2022
- 06:34 PM Minova Corp Affairs 0.50 hour (Project: Minova Corp Affairs)
- Support Marketing - Rekap Enhancement PT Asuransi Bintang 2017-2021
- 06:31 PM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
- GA - BAST Project PT Asuransi Bintang dan Bank Mega Syariah
- 06:30 PM Minova ERP Internal 1.00 hour (Bug #920 (QA Test): [ERP Internal] Report Financial Position Skontro)
- Testing Bug #920 ERP Internal
- 06:30 PM Minova ERP Internal 1.50 hour (Bug #927 (QA Test): [ERP Internal] Doc Ref untuk Document Sales belum terupdate pada tabel items)
- Testing Bug #927 ERP Internal
- 06:26 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
- Setting Api Mobile BKT & Activ Code
- 06:23 PM TUGU PRATAMA INDONESIA (TPI) 3.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
- Testing dan setting Payroll Update Existing & ES
- 06:22 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
- Testing report dan cek-cek redmine
- 06:21 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
- Testing dan setting Recruitment Report
- 06:20 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #866 (Closed): Recruitment - Applicant Selection Report BMS )
- Testing dan setting
- 03:29 PM PERTALIFE 4.00 hours (Project: PERTALIFE)
- Mempelajari cara membuat ESS PMS
- 03:06 PM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
- Finance - Invoice dan Faktur Pajak
- 02:54 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #919 (Closed): [ HR ] - Training - Report Training History BMS)
- [ HR ] - Training - Report Training History BMS
- 02:45 PM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
- Finance AP, Trial Balance, PPh 21
- 11:05 AM Minova Corp Affairs 3.50 hours (Project: Minova Corp Affairs)
- Finance, GA, AP, Audit
- 09:43 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
02/25/2022
- 04:12 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Bug #866 (Closed): Recruitment - Applicant Selection Report BMS )
- Recruitment - Applicant Selection Report BMS
- 02:20 PM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
- Finance
- 11:26 AM ROHTO BUGS 1.00 hour (Bug #931 (Closed): Report Time Sheet Recap Kolom Keterlambantan Kosong)
- Report Time Sheet Recap Kolom Keterlambantan Kosong
- 11:09 AM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
- Finance, GA, Payroll
- 10:25 AM PT ARITA 1.00 hour (Bug #926 (Closed): [Production] - Report Loan)
- [Production] - Report Loan
02/24/2022
- 05:34 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 02:26 PM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
- Lanjutan Audit 2019 Revisi as discuss
- 12:53 PM BANK KALTENG 1.30 hour (Feature #878 (Closed): [Request Time Management] Report Absensi dengan Absence Type Izin Datang Terlambat)
- [Request Time Management] Report Absensi dengan Absence Type Izin Datang Terlambat
- 11:14 AM Minova ERP Internal 8.00 hours (Project: Minova ERP Internal)
- ERP Internal
- 10:45 AM TUGU PRATAMA INDONESIA (TPI) 4.00 hours (Feature #858 (Closed): [HR-PAYROLL] Report Insentif Pajak Custom versi MinovaES)
- [HR-PAYROLL] Report Insentif Pajak Custom versi MinovaES
- 10:31 AM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
- Finance: AP, AR, Koreksi Laporan Audit 2019
- 10:06 AM PT BMS MIGRATION & ENHANCEMENT 1.50 hour (Bug #922 (Closed): [ HR ] - Training Master Data - Training Event - Attendance Detail)
- Fixing LookUp Emp Training BMS
- 09:55 AM PT BMS MIGRATION & ENHANCEMENT 0.50 hour (Bug #922 (Closed): [ HR ] - Training Master Data - Training Event - Attendance Detail)
- Fixing LookUp Emp Training BMS
02/23/2022
- 06:28 PM Minova Corp Affairs 5.00 hours (Project: Minova Corp Affairs)
- Finance
- 06:26 PM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
- Finance, GA
- 06:21 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- 04:49 PM Minova ERP Internal 0.50 hour (Project: Minova ERP Internal)
- Fixing Auto Jurnal Internal
- 04:45 PM Minova ERP Internal 1.50 hour (Bug #920 (QA Test): [ERP Internal] Report Financial Position Skontro)
- Fixing FS Skontro
- 03:25 PM Minova ERP Internal 6.00 hours (Project: Minova ERP Internal)
- Catatan ERP Internal Periode Jan 2022
- 03:15 PM Minova ERP Internal 1.00 hour (Feature #914 (QA Test): [ERP Internal] Report Income Statement)
- Testing Feature #914 ERP Internal
- 03:15 PM Minova ERP Internal 1.00 hour (Bug #892 (Closed): [ERP Internal] Report Jurnal Voucher)
- Testing Bug #892 ERP Internal
- 02:59 PM Asuransi Bintang - Existing 4.00 hours (Project: Asuransi Bintang - Existing)
- Fixing Running Payroll AsBi
- 10:10 AM PT ARITA 1.50 hour (Functional #840 (QA Test): Report Pengajuan Gaji Karyawan)
- Fixing Report Pengajuan Gaji Arita
- 09:48 AM PT ARITA 3.50 hours (Functional #840 (QA Test): Report Pengajuan Gaji Karyawan)
- Fixing Report Pengajuan Gaji Arita
- 09:40 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
02/22/2022
- 04:42 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
- Finance
- 04:09 PM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
- Finance
- 04:08 PM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
- Finance
- 04:00 PM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
- Finance
- 02:33 PM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
- Meeting Koordinasi
- 02:32 PM Minova ERP Internal 0.50 hour (Bug #892 (Closed): [ERP Internal] Report Jurnal Voucher)
- Fixing Report Jurnal Voucher Internal
- 02:31 PM Minova ERP Internal 1.00 hour (Feature #914 (QA Test): [ERP Internal] Report Income Statement)
- Fixing Report Income Statement Internal
- 02:29 PM Minova ERP Internal 1.00 hour (Feature #914 (QA Test): [ERP Internal] Report Income Statement)
- Fixing Report Income Statement Internal
- 02:11 PM Asuransi Bintang - Existing 8.00 hours (Feature #849 (Developing): Pembuatan Report Rekap Competency, Rekap Job Aktif & Talent Match Up)
- Pembuatan Report Rekap Competency, Rekap Job Aktif & Talent Match Up
- 01:43 PM PT ARITA 1.00 hour (Bug #915 (Closed): Logo Pada Report Bank Transfer)
- Logo Pada Report Bank Transfer
- 10:30 AM MINOVAES - PRODUCT 0.50 hour (Support #806 (Assigned): [HR-PAYROLL] Validasi & Notifikasi di menu Payroll )
- Fixing Payroll Control Product
- 09:25 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
02/21/2022
- 06:12 PM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
- Finance - Invoice dan Faktur Pajak
- 06:11 PM Minova Corp Affairs 7.00 hours (Project: Minova Corp Affairs)
- Administration Doc Internal
- 05:12 PM Minova ERP Internal 3.00 hours (Bug #892 (Closed): [ERP Internal] Report Jurnal Voucher)
- Fixing Report Jurnal Voucher Internal
- 02:41 PM BANK KALTENG 1.00 hour (Feature #836 (Closed): [Payroll Report] 1721 A1 2014 Personal)
- [Payroll Report] 1721 A1 2014 Personal
- 02:32 PM BANK KALTENG 2.00 hours (Feature #603 (Closed): [Request Time Management] Leave)
- [Request Time Management] Leave
- 02:26 PM BANK KALTENG 1.00 hour (Feature #896 (Closed): [Report Attendance Recap] Perubahan Nama Field)
- [Report Attendance Recap] Perubahan Nama Field
- 02:22 PM Minova ERP Internal 1.00 hour (Bug #907 (Closed): [ERP Internal] Report Account Balance Tidak Keluar after Closing)
- Fixing Report Acc Balance Internal
- 02:20 PM PT BMS MIGRATION & ENHANCEMENT 3.50 hours (Bug #874 (Closed): [ HR ] - Training History)
- Fixing Training History BMS
- 10:57 AM BBG Bugs 1.00 hour (Bug #908 (Closed): Pilihan Export Payslip hanya CSV & PDF)
- Fixing Export RDL BBG
- 10:26 AM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
- Rekap Jurnal Bank Mandiri Periode 1-15 Feb 2022
Also available in: Atom