Project

General

Profile

Activity

From 02/06/2022 to 03/07/2022

03/07/2022

07:10 PM BANK KALTENG 8.00 hours (Project: BANK KALTENG)
Mapping Mster Data BKT (Personal Data dan Employee Assignment) Mega Yunita
06:37 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Deploy BMS Migrasi fernando sergio rumbayan
05:41 PM TUGU PRATAMA INDONESIA (TPI) 2.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
Migrasi Data Payroll Table [PHRPYTR0301CUM] fernando sergio rumbayan
05:41 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #866 (Closed): Recruitment - Applicant Selection Report BMS )
Recruitment - Applicant Selection Report BMS M Azid Wahyudi
04:50 PM ROHTO BUGS 3.00 hours (Bug #942 (Closed): [HR-TIME DATA] Report Time Sheet Recap salah membaca nilai keterlambatan dan data2 lain nya)
[HR-TIME DATA] Report Time Sheet Recap salah membaca nilai keterlambatan dan data2 lain nya M Azid Wahyudi
04:33 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Meeting dan Panduan Testing Payroll untuk running fernando sergio rumbayan
11:13 AM PERTALIFE Bugs 2.00 hours (Project: PERTALIFE Bugs)
Assisting Payroll Running & Correction Data ikawati basri
10:40 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana

03/04/2022

06:40 PM HINO 4.50 hours (Project: HINO)
Case Hirarki Approval ESS ikawati basri
06:23 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
Membuat master data PA dan Employee Administration BKT Mega Yunita
06:23 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
Meeting dengak BKT terkait Master Data Mega Yunita
06:22 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
Membuat master data PA dan Employee Administration BKT Mega Yunita
06:22 PM TUGU PRATAMA INDONESIA (TPI) 8.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
Migrasi Data Payroll 301 & Mapping data Traning fernando sergio rumbayan
04:30 PM MINOVAES - PRODUCT 2.00 hours (Bug #368 (QA Test): Modul Payroll - Report BPJS TK Karyawan keluar )
Modul Payroll - Report BPJS TK Karyawan keluar M Azid Wahyudi
11:42 AM LPPOM HALAL 1.50 hour (Project: LPPOM HALAL)
Case Neraca 2021 tidak Balance ikawati basri
10:29 AM CLIENT SUPPORT 1.00 hour (Project: CLIENT SUPPORT)
Update BPJS Pensiun ke User ikawati basri
10:27 AM HINO 0.50 hour (Project: HINO)
Update Reminder Case ORM & Hirarki Approval Hino ikawati basri
10:25 AM Asuransi Bintang - Existing 1.00 hour (Project: Asuransi Bintang - Existing)
Case Employee Profile ikawati basri
10:20 AM CNAF 1.00 hour (Project: CNAF)
Update report 1721 untuk Company Name ikawati basri
10:17 AM PERTALIFE Bugs 0.50 hour (Project: PERTALIFE Bugs)
Case Inbox ORM belum diupdate & Minta Forwarding Task ESS Leave ikawati basri
10:15 AM PERTALIFE Bugs 0.50 hour (Project: PERTALIFE Bugs)
Case User Tidak bisa Log-in ikawati basri
10:13 AM HINO 0.50 hour (Project: HINO)
Case User in-Active ikawati basri
10:10 AM CLIENT SUPPORT 3.00 hours (Project: CLIENT SUPPORT)
Create Tutorial update BPJS Pensiun - Untuk User ES ikawati basri
10:06 AM Bank Mega Syariah Existing 1.00 hour (Project: Bank Mega Syariah Existing)
Create Tutorial update BPJS Pensiun ikawati basri
10:06 AM TUGU PRATAMA INDONESIA (TPI) 5.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
Setting Payroll & Traning Management fernando sergio rumbayan
10:04 AM CNAF 2.00 hours (Project: CNAF)
Cek Case Delegate To ESS Leave ikawati basri
10:04 AM TUGU PRATAMA INDONESIA (TPI) 3.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
Meeting dan testing payroll, OM , Medical , Travel , Traning Mng fernando sergio rumbayan
10:01 AM BANK WOORI SAUDARA 3.00 hours (Project: BANK WOORI SAUDARA)
Update, perbaikan & Testing Review Aplikasi Minova BWS ikawati basri
09:15 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana

03/02/2022

06:13 PM BANK FAMA 1.50 hour (Project: BANK FAMA)
Guide Bu ilvia Setting Banefit Calcuation pada Cuztomization dian perdana putra
06:08 PM BANK FAMA 6.00 hours (Project: BANK FAMA)
Fixing/Setting Report Wagetype Recap & WageType DPLK Top Up tidak bisa di input amount dian perdana putra
06:03 PM HINO Bugs 4.00 hours (Project: HINO Bugs)
Support Mas Defri Siapkan Template Upload Payroll Basic Data dan Mapingan data Payroll Class dan Payroll Grade dian perdana putra
05:56 PM ROHTO BUGS 2.00 hours (Project: ROHTO BUGS)
Meeting dengan Bu Meila dian perdana putra
05:50 PM ROHTO BUGS 1.00 hour (Project: ROHTO BUGS)
Support Bu Meila Add Authorize User Management dian perdana putra
05:43 PM LPPOM HALAL 3.00 hours (Bug #913 (Closed): Form Employee Movement > Employee Hiring > IHATEC > IHATEC " tombol execute tidak merespon/ tidak menampilkan result input personal data")
Proses Deploy dian perdana putra
05:36 PM BANK FAMA 1.00 hour (Project: BANK FAMA)
Meeting dengan Bu ilvia & Bu susan guide tentang Personal Administration dan User Management dian perdana putra
05:29 PM HINO Bugs 2.50 hours (Project: HINO Bugs)
Support Mbak Zahra Guide Employee Administration Family dian perdana putra
05:25 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
Testing aplikasi mobile BKT untuk proses Attandance dan pengajuan Leave. Mega Yunita
05:23 PM Asuransi Bintang - Existing 4.00 hours (Project: Asuransi Bintang - Existing)
Support Mas Rusdi Upload Data Employee Profile dian perdana putra
05:23 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
Mempelajari cara membuat ESS PMS Mega Yunita
05:20 PM PERTALIFE 2.00 hours (Project: PERTALIFE)
Setting dan melakukan perubahan setelah diskusi dengan PT. Pertalife Mega Yunita
05:18 PM PERTALIFE 2.00 hours (Project: PERTALIFE)
Meeting guna menyampaikan progress project dan diskusi terkait kebutuhan untuk PMS PT. Pertalife Mega Yunita
05:18 PM ALIF ( Al Ijarah Indonesia Finance ) 4.00 hours (Bug #939 (Closed): Running Error Values was Either too large or too small for an unsigned byte)
Cek Data Melalui VPN Remote Desktop dian perdana putra
04:50 PM ALIF ( Al Ijarah Indonesia Finance ) 1.00 hour (Bug #939 (Closed): Running Error Values was Either too large or too small for an unsigned byte)
Cek Data Melalui Remote Anydesk dengan Pak Risdi dian perdana putra
04:40 PM MINOVAES - PRODUCT 1.00 hour (Bug #367 (QA Test): Modul Payroll BPJS - Report BPJS TK Karyawan masuk )
Modul Payroll BPJS - Report BPJS TK Karyawan masuk M Azid Wahyudi
04:13 PM PERTALIFE Bugs 3.00 hours (Project: PERTALIFE Bugs)
Support Guide Pak Yahmin Employee Hiring (WFH) dian perdana putra
04:08 PM BBG 8.00 hours (Bug #795 (Closed): [HR-Payroll] Running Payroll Data Overtime Tidak Terkalkulasi)
Support Mbak Aline BBG Overtime tidak tercalculate dan Medical double (WFH) dian perdana putra
04:02 PM MINOVAES - PRODUCT 1.00 hour (Bug #365 (QA Test): Modul Payroll - Report BPJS Kesehatan recap )
Modul Payroll - Report BPJS Kesehatan recap M Azid Wahyudi
03:42 PM MINOVAES - PRODUCT 1.30 hour (Bug #366 (QA Test): Modul Payroll BPJS - Report Pensiun )
Modul Payroll BPJS - Report Pensiun M Azid Wahyudi
03:41 PM BANK FAMA 2.00 hours (Project: BANK FAMA)
Support Bu Ilvia Setting Pretax DPLK TOP UP ( WFH ) dian perdana putra
03:35 PM PERTALIFE Bugs 2.00 hours (Project: PERTALIFE Bugs)
Support Guide Pak Yahmin (WFH) dian perdana putra
03:29 PM Bank Mega Syariah Existing 1.00 hour (Project: Bank Mega Syariah Existing)
Meeting Case ESS PMS Bersama Pak Effendi ( WFH ) dian perdana putra
02:57 PM PERTALIFE Bugs 3.00 hours (Project: PERTALIFE Bugs)
Support Pak yahmin Payroll Additional Tidak Terupload ( WFH ) dian perdana putra
02:54 PM HINO 6.00 hours (Bug #933 (Closed): Komponen Gaji Double pada Report Payslip )
Cek Komponen Gaji Double pada Report Payslip ( WFH ) dian perdana putra
02:24 PM IMFI Bugs 1.00 hour (Bug #936 (Closed): Employee Payroll Report Tidak dapat menampilkan Report)
Employee Payroll Report Tidak dapat menampilkan Report M Azid Wahyudi
01:34 PM Minova Corp Affairs 4.50 hours (Project: Minova Corp Affairs)
Finance, Audit, GA wahyuningsih yuni
09:57 AM Minova Corp Affairs 3.50 hours (Project: Minova Corp Affairs)
Finance, GA, Trial Balance 2020 wahyuningsih yuni
09:21 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana

03/01/2022

06:34 PM Minova Corp Affairs 0.50 hour (Project: Minova Corp Affairs)
Support Marketing - Rekap Enhancement PT Asuransi Bintang 2017-2021 Maulina Hali
06:31 PM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
GA - BAST Project PT Asuransi Bintang dan Bank Mega Syariah Maulina Hali
06:30 PM Minova ERP Internal 1.00 hour (Bug #920 (QA Test): [ERP Internal] Report Financial Position Skontro)
Testing Bug #920 ERP Internal Maulina Hali
06:30 PM Minova ERP Internal 1.50 hour (Bug #927 (QA Test): [ERP Internal] Doc Ref untuk Document Sales belum terupdate pada tabel items)
Testing Bug #927 ERP Internal Maulina Hali
06:26 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
Setting Api Mobile BKT & Activ Code fernando sergio rumbayan
06:23 PM TUGU PRATAMA INDONESIA (TPI) 3.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
Testing dan setting Payroll Update Existing & ES fernando sergio rumbayan
06:22 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
Testing report dan cek-cek redmine Mega Yunita
06:21 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Testing dan setting Recruitment Report fernando sergio rumbayan
06:20 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #866 (Closed): Recruitment - Applicant Selection Report BMS )
Testing dan setting fernando sergio rumbayan
03:29 PM PERTALIFE 4.00 hours (Project: PERTALIFE)
Mempelajari cara membuat ESS PMS Mega Yunita
03:06 PM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
Finance - Invoice dan Faktur Pajak Maulina Hali
02:54 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #919 (Closed): [ HR ] - Training - Report Training History BMS)
[ HR ] - Training - Report Training History BMS M Azid Wahyudi
02:45 PM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
Finance AP, Trial Balance, PPh 21 wahyuningsih yuni
11:05 AM Minova Corp Affairs 3.50 hours (Project: Minova Corp Affairs)
Finance, GA, AP, Audit wahyuningsih yuni
09:43 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana

02/25/2022

04:12 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Bug #866 (Closed): Recruitment - Applicant Selection Report BMS )
Recruitment - Applicant Selection Report BMS M Azid Wahyudi
02:20 PM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
Finance wahyuningsih yuni
11:26 AM ROHTO BUGS 1.00 hour (Bug #931 (Closed): Report Time Sheet Recap Kolom Keterlambantan Kosong)
Report Time Sheet Recap Kolom Keterlambantan Kosong M Azid Wahyudi
11:09 AM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
Finance, GA, Payroll wahyuningsih yuni
10:25 AM PT ARITA 1.00 hour (Bug #926 (Closed): [Production] - Report Loan)
[Production] - Report Loan M Azid Wahyudi

02/24/2022

05:34 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana
02:26 PM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
Lanjutan Audit 2019 Revisi as discuss wahyuningsih yuni
12:53 PM BANK KALTENG 1.30 hour (Feature #878 (Closed): [Request Time Management] Report Absensi dengan Absence Type Izin Datang Terlambat)
[Request Time Management] Report Absensi dengan Absence Type Izin Datang Terlambat M Azid Wahyudi
11:14 AM Minova ERP Internal 8.00 hours (Project: Minova ERP Internal)
ERP Internal Maulina Hali
10:45 AM TUGU PRATAMA INDONESIA (TPI) 4.00 hours (Feature #858 (Closed): [HR-PAYROLL] Report Insentif Pajak Custom versi MinovaES)
[HR-PAYROLL] Report Insentif Pajak Custom versi MinovaES M Azid Wahyudi
10:31 AM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
Finance: AP, AR, Koreksi Laporan Audit 2019 wahyuningsih yuni
10:06 AM PT BMS MIGRATION & ENHANCEMENT 1.50 hour (Bug #922 (Closed): [ HR ] - Training Master Data - Training Event - Attendance Detail)
Fixing LookUp Emp Training BMS Tri Rizqiaty
09:55 AM PT BMS MIGRATION & ENHANCEMENT 0.50 hour (Bug #922 (Closed): [ HR ] - Training Master Data - Training Event - Attendance Detail)
Fixing LookUp Emp Training BMS Tri Rizqiaty

02/23/2022

06:28 PM Minova Corp Affairs 5.00 hours (Project: Minova Corp Affairs)
Finance wahyuningsih yuni
06:26 PM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
Finance, GA wahyuningsih yuni
06:21 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana
04:49 PM Minova ERP Internal 0.50 hour (Project: Minova ERP Internal)
Fixing Auto Jurnal Internal Tri Rizqiaty
04:45 PM Minova ERP Internal 1.50 hour (Bug #920 (QA Test): [ERP Internal] Report Financial Position Skontro)
Fixing FS Skontro Tri Rizqiaty
03:25 PM Minova ERP Internal 6.00 hours (Project: Minova ERP Internal)
Catatan ERP Internal Periode Jan 2022 Maulina Hali
03:15 PM Minova ERP Internal 1.00 hour (Feature #914 (QA Test): [ERP Internal] Report Income Statement)
Testing Feature #914 ERP Internal Maulina Hali
03:15 PM Minova ERP Internal 1.00 hour (Bug #892 (Closed): [ERP Internal] Report Jurnal Voucher)
Testing Bug #892 ERP Internal Maulina Hali
02:59 PM Asuransi Bintang - Existing 4.00 hours (Project: Asuransi Bintang - Existing)
Fixing Running Payroll AsBi Tri Rizqiaty
10:10 AM PT ARITA 1.50 hour (Functional #840 (QA Test): Report Pengajuan Gaji Karyawan)
Fixing Report Pengajuan Gaji Arita Tri Rizqiaty
09:48 AM PT ARITA 3.50 hours (Functional #840 (QA Test): Report Pengajuan Gaji Karyawan)
Fixing Report Pengajuan Gaji Arita Tri Rizqiaty
09:40 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana

02/22/2022

04:42 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Finance wahyuningsih yuni
04:09 PM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
Finance wahyuningsih yuni
04:08 PM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
Finance wahyuningsih yuni
04:00 PM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
Finance wahyuningsih yuni
02:33 PM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
Meeting Koordinasi Tri Rizqiaty
02:32 PM Minova ERP Internal 0.50 hour (Bug #892 (Closed): [ERP Internal] Report Jurnal Voucher)
Fixing Report Jurnal Voucher Internal Tri Rizqiaty
02:31 PM Minova ERP Internal 1.00 hour (Feature #914 (QA Test): [ERP Internal] Report Income Statement)
Fixing Report Income Statement Internal Tri Rizqiaty
02:29 PM Minova ERP Internal 1.00 hour (Feature #914 (QA Test): [ERP Internal] Report Income Statement)
Fixing Report Income Statement Internal Tri Rizqiaty
02:11 PM Asuransi Bintang - Existing 8.00 hours (Feature #849 (Developing): Pembuatan Report Rekap Competency, Rekap Job Aktif & Talent Match Up)
Pembuatan Report Rekap Competency, Rekap Job Aktif & Talent Match Up M Azid Wahyudi
01:43 PM PT ARITA 1.00 hour (Bug #915 (Closed): Logo Pada Report Bank Transfer)
Logo Pada Report Bank Transfer M Azid Wahyudi
10:30 AM MINOVAES - PRODUCT 0.50 hour (Support #806 (Assigned): [HR-PAYROLL] Validasi & Notifikasi di menu Payroll )
Fixing Payroll Control Product Tri Rizqiaty
09:25 AM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana

02/21/2022

06:12 PM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
Finance - Invoice dan Faktur Pajak Maulina Hali
06:11 PM Minova Corp Affairs 7.00 hours (Project: Minova Corp Affairs)
Administration Doc Internal Maulina Hali
05:12 PM Minova ERP Internal 3.00 hours (Bug #892 (Closed): [ERP Internal] Report Jurnal Voucher)
Fixing Report Jurnal Voucher Internal Tri Rizqiaty
02:41 PM BANK KALTENG 1.00 hour (Feature #836 (Closed): [Payroll Report] 1721 A1 2014 Personal)
[Payroll Report] 1721 A1 2014 Personal M Azid Wahyudi
02:32 PM BANK KALTENG 2.00 hours (Feature #603 (Closed): [Request Time Management] Leave)
[Request Time Management] Leave M Azid Wahyudi
02:26 PM BANK KALTENG 1.00 hour (Feature #896 (Closed): [Report Attendance Recap] Perubahan Nama Field)
[Report Attendance Recap] Perubahan Nama Field M Azid Wahyudi
02:22 PM Minova ERP Internal 1.00 hour (Bug #907 (Closed): [ERP Internal] Report Account Balance Tidak Keluar after Closing)
Fixing Report Acc Balance Internal Tri Rizqiaty
02:20 PM PT BMS MIGRATION & ENHANCEMENT 3.50 hours (Bug #874 (Closed): [ HR ] - Training History)
Fixing Training History BMS Tri Rizqiaty
10:57 AM BBG Bugs 1.00 hour (Bug #908 (Closed): Pilihan Export Payslip hanya CSV & PDF)
Fixing Export RDL BBG Tri Rizqiaty
10:26 AM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
Rekap Jurnal Bank Mandiri Periode 1-15 Feb 2022 Maulina Hali

02/18/2022

06:10 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Miss Yana
05:08 PM PT BMS MIGRATION & ENHANCEMENT 0.50 hour (Bug #911 (Closed): [ HR ] - Medical Claim Report)
Fixing Report Claim BMS Tri Rizqiaty
05:05 PM PT BMS MIGRATION & ENHANCEMENT 0.50 hour (Bug #909 (Closed): [ HR ] - Medical Claim Status)
Fixing Claim Status BMS Tri Rizqiaty
05:03 PM PT BMS MIGRATION & ENHANCEMENT 1.50 hour (Bug #897 (Closed): [ HR ] - Travel Document - Calculate Total Cost)
Fixing Tri Rizqiaty
05:01 PM BANK KALTENG 5.00 hours (Feature #882 (Closed): [Report Payroll] Report Akumulasi Cuti Tahunan dan Cuti Besar)
Create Report Bekal Cuti BKT Tri Rizqiaty
04:58 PM BANK KALTENG 3.00 hours (Feature #882 (Closed): [Report Payroll] Report Akumulasi Cuti Tahunan dan Cuti Besar)
Create Report Bekal Cuti BKT Tri Rizqiaty
04:39 PM HINO 0.50 hour (Project: HINO)
Case User Ter-Lock (expired) ikawati basri
04:37 PM BBG 0.50 hour (Project: BBG)
Cek List Case-Case BBG akibat Server Rusak ikawati basri
04:35 PM BBG 1.00 hour (Project: BBG)
Fixing WS Type to Overtime Payroll calculation ikawati basri
03:44 PM BBG 0.50 hour (Project: BBG)
Update Progress Perbaikan Case-Case Akibat Server BBG Rusak ke Internal Minova ikawati basri
03:41 PM BBG 0.50 hour (Project: BBG)
Case Rate Travel untuk Direksi tidak Sesuai ikawati basri
03:39 PM CNAF 1.00 hour (Project: CNAF)
Case Payslip Double ada Retro january semua komponen Payroll ikawati basri
03:36 PM BBG 0.50 hour (Project: BBG)
Discuss Internal Penyelesaian Case-Case Catatan Akibat Server BBG Rusak ikawati basri
03:34 PM BBG 0.50 hour (Project: BBG)
Redmine report Payslip hanya keluar CSV & PDF ikawati basri
03:32 PM BBG 0.50 hour (Project: BBG)
Case Approval ESS Travel & Medical ke Admin ikawati basri
11:19 AM CLIENT SUPPORT 1.00 hour (Project: CLIENT SUPPORT)
Buat Tutorial Case Harian ikawati basri
11:18 AM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
Membuat FRD Project PERTALIFE Mega Yunita
11:17 AM HINO 0.50 hour (Project: HINO)
Reset NIK ikawati basri
11:17 AM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
Setting PMS di project BKT Mega Yunita
11:16 AM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
Setting PMS di project Pertalife Mega Yunita
11:16 AM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
Setting PMS di project BKT Mega Yunita
11:15 AM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
Setting PMS di project Pertalife Mega Yunita
11:13 AM CNAF 2.00 hours (Project: CNAF)
Cek Query Perintah Baca Delegate employee - ESS Leave ikawati basri
11:08 AM CNAF 0.50 hour (Project: CNAF)
Case Data Employee Hilang - Semua data Hilang termasuk employee ID ikawati basri
11:04 AM HINO 2.00 hours (Project: HINO)
Case TM to Payroll Meal Allowance employee 0 ikawati basri
10:59 AM HINO 1.00 hour (Project: HINO)
Diskusi internal Case PIC Approval ESS Hino ikawati basri
10:58 AM HINO 1.00 hour (Project: HINO)
Case Approval ESS HINO ikawati basri
10:55 AM HINO 1.00 hour (Project: HINO)
Cek Case Absensi Hino ikawati basri
10:52 AM BBG 0.50 hour (Project: BBG)
Discuss Terkait Masalah DB Hilang di BBG untuk info ke User ikawati basri
10:48 AM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
Finance wahyuningsih yuni
10:48 AM HINO 0.50 hour (Project: HINO)
Support Cek Penyebab Error Upload Additional Payroll ikawati basri
10:45 AM HINO 1.00 hour (Project: HINO)
Support Template & Testing upload Data Additional Payroll ikawati basri
10:42 AM BBG 2.00 hours (Project: BBG)
Meeting Case Database Hilang di BBG ikawati basri
09:28 AM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
Miss Yana

02/17/2022

06:01 PM Minova ERP Internal 1.00 hour (Bug #907 (Closed): [ERP Internal] Report Account Balance Tidak Keluar after Closing)
ERP Internal Maulina Hali
05:54 PM Minova ERP Internal 2.00 hours (Project: Minova ERP Internal)
Input Jurnal Bank Mandiri Periode 24-31 Jan 2022 ke Aplikasi MinovaES ERP Internal Maulina Hali
05:52 PM Minova ERP Internal 1.00 hour (Bug #892 (Closed): [ERP Internal] Report Jurnal Voucher)
ERP Internal Maulina Hali
05:50 PM Minova ERP Internal 4.00 hours (Bug #883 (Closed): [ERP Internal] Closing bulanan tidak bisa)
Testing dan Setting Bug #883 ERP Internal Maulina Hali
11:43 AM Minova ERP Internal 2.50 hours (Bug #883 (Closed): [ERP Internal] Closing bulanan tidak bisa)
Fixing Closing Bulanan Internal Tri Rizqiaty
11:35 AM Minova ERP Internal 0.50 hour (Bug #883 (Closed): [ERP Internal] Closing bulanan tidak bisa)
Fixing Closing Bulanan Internal Tri Rizqiaty
11:32 AM Minova ERP Internal 1.50 hour (Bug #883 (Closed): [ERP Internal] Closing bulanan tidak bisa)
Fixing Closing Bulanan Internal Tri Rizqiaty
09:36 AM Minova ERP Internal 4.00 hours (Bug #883 (Closed): [ERP Internal] Closing bulanan tidak bisa)
ERP Internal Maulina Hali
05:41 PM PT BMS MIGRATION & ENHANCEMENT 4.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Retesting Payroll unutuk visit BMS fernando sergio rumbayan
05:39 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Finance wahyuningsih yuni
05:38 PM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
Finance wahyuningsih yuni
05:37 PM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
Finance wahyuningsih yuni
05:33 PM CNAF 0.50 hour (Project: CNAF)
Case Loan Tidak bisa save ikawati basri
05:17 PM CNAF 0.50 hour (Project: CNAF)
Payroll Reguler Issue ikawati basri
05:09 PM TUGU PRATAMA INDONESIA (TPI) 4.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
Meeting Terkait Payroll fernando sergio rumbayan
03:35 PM BBG Bugs 2.00 hours (Bug #893 (Closed): [Payroll] Report Tidak Keluar (Error))
Cek Report Payroll & Listing report ID ikawati basri
02:50 PM BBG Bugs 2.50 hours (Bug #893 (Closed): [Payroll] Report Tidak Keluar (Error))
Fixing Report2 Payroll BBG Tri Rizqiaty
02:15 PM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
Miss Yana
11:34 AM CLIENT SUPPORT 1.00 hour (Project: CLIENT SUPPORT)
Support CS & Functional Tri Rizqiaty
11:18 AM TUGU PRATAMA INDONESIA (TPI) 6.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
Testing Flow payroll & Report fernando sergio rumbayan
09:34 AM Minova ERP Internal 4.00 hours (Project: Minova ERP Internal)
Setting Financial Accounting Report Maulina Hali

02/16/2022

06:53 PM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
Miss Yana
03:03 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Check Error Report BMS Tri Rizqiaty
03:01 PM TUGU PRATAMA INDONESIA (TPI) 3.00 hours (Bug #884 (Closed): Payroll Administration - Aditional Payroll)
Fixing Look Up WT MD5 TPI Tri Rizqiaty
02:40 PM TUGU PRATAMA INDONESIA (TPI) 2.00 hours (Bug #879 (Closed): Payroll Accounting - Simulation & Running)
Testing dan Setting Payroll Accounting & Payroll Administrator fernando sergio rumbayan
12:07 PM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
Miss Yana
12:04 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Retesting Untuk visit BMS Master data travel fernando sergio rumbayan
12:02 PM TUGU PRATAMA INDONESIA (TPI) 6.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
Medical & Travel Setting fernando sergio rumbayan
12:00 PM PT BMS MIGRATION & ENHANCEMENT 13.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Visit BMS dari JAM 09.00 - 23.30 fernando sergio rumbayan
11:11 AM Minova ERP Internal 6.00 hours (Project: Minova ERP Internal)
Setting Financial Accounting Report Maulina Hali
11:10 AM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
GA - Internal Memorandum SKG 2022 Maulina Hali
10:48 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
ericsson ericsson
10:47 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Visit to Mega Syariah ericsson ericsson

02/15/2022

06:10 PM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
Miss Yana
06:06 PM HINO 0.50 hour (Project: HINO)
Support Transfer employee & guide user untuk Create Posisi baru di ORM ikawati basri
06:04 PM CNAF 2.00 hours (Project: CNAF)
Cek table & Code untuk case Select Delegation di Tarik dari Data apa ikawati basri
06:03 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Finance wahyuningsih yuni
06:03 PM CNAF 0.50 hour (Project: CNAF)
Payroll Retro ikawati basri
06:02 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Finance wahyuningsih yuni
06:01 PM HINO Bugs 2.00 hours (Project: HINO Bugs)
Support case Meal Allowance 0 ikawati basri
06:00 PM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
Finance wahyuningsih yuni
05:58 PM Minova Corp Affairs 8.00 hours (Project: Minova Corp Affairs)
Finance, Purchasing wahyuningsih yuni
05:56 PM BBG 1.00 hour (Project: BBG)
Update Base Perhitungan BPJS (Bencal) ikawati basri
05:55 PM TUGU PRATAMA INDONESIA (TPI) 1.00 hour (Bug #879 (Closed): Payroll Accounting - Simulation & Running)
Fixing Running Payroll TPI Tri Rizqiaty
05:46 PM CNAF 2.50 hours (Project: CNAF)
Case ESS Leave Field Group "Delegate To" ikawati basri
05:41 PM LPPOM HALAL 0.50 hour (Project: LPPOM HALAL)
Support case ESS Medical Error, Plafond 0 ikawati basri
05:38 PM Bank Mega Syariah Existing 3.50 hours (Project: Bank Mega Syariah Existing)
Online Meeting & QC Data untuk Mengarahkan User memasukkan Data PMS 2021 di db. Prod BMS ikawati basri
05:31 PM BBG 1.50 hour (Project: BBG)
Update Base Perhitungan BPJS (Bencal) ikawati basri
05:29 PM CNAF 2.50 hours (Project: CNAF)
Case ESS Leave Field Group "Delegate To" ikawati basri
04:47 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
Setting PMS di project Pertalife Mega Yunita
04:17 PM PT ARITA 3.50 hours (Functional #840 (QA Test): Report Pengajuan Gaji Karyawan)
Create Report Pengajuan Gaji Arita Tri Rizqiaty
04:15 PM PT ARITA 7.00 hours (Functional #840 (QA Test): Report Pengajuan Gaji Karyawan)
Create Report Pengajuan Gaji Arita Tri Rizqiaty
03:11 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
Setting PMS di project Pertalife Mega Yunita
02:22 PM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
Miss Yana
10:00 AM BANK KALTENG 0.30 hour (Project: BANK KALTENG)
Membuat User dan menentukan role untuk Project BKT Mega Yunita
09:45 AM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
Miss Yana
09:25 AM Minova Corp Affairs 3.50 hours (Project: Minova Corp Affairs)
Finance - Update Cash Flow, Transaksi bangking Maulina Hali

02/14/2022

05:32 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
Setting PMS di project Pertalife Mega Yunita
05:32 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
Testing BKT Mega Yunita
04:00 PM Minova ERP Internal 6.00 hours (Project: Minova ERP Internal)
ERP Internal Maulina Hali
03:58 PM Minova Corp Affairs 0.50 hour (Project: Minova Corp Affairs)
GA - BAST Bank Kalteng & Bank Mega Syariah Maulina Hali
03:56 PM Minova ERP Internal 1.00 hour (Project: Minova ERP Internal)
Input Jurnal Petty Cash Project Periode Jan 2022 ke Aplikasi MinovaES ERP Internal Maulina Hali
03:56 PM Minova Corp Affairs 3.00 hours (Project: Minova Corp Affairs)
Finance - Revise AP Maulina Hali
02:25 PM Asuransi Bintang - Existing 3.00 hours (Feature #849 (Developing): Pembuatan Report Rekap Competency, Rekap Job Aktif & Talent Match Up)
Create Report Job Active BMS Tri Rizqiaty
01:54 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
Monitoring redmine dan QA Test Mega Yunita
11:55 AM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
Miss Yana
10:16 AM PT BMS MIGRATION & ENHANCEMENT 1.50 hour (Bug #868 (Closed): [ HR ] Talent - Career Planing)
Fixing Carrer Plan BMS Tri Rizqiaty
10:05 AM PT BMS MIGRATION & ENHANCEMENT 1.50 hour (Bug #868 (Closed): [ HR ] Talent - Career Planing)
Fixing Carrer Plan BMS Tri Rizqiaty
10:02 AM PT BMS MIGRATION & ENHANCEMENT 5.00 hours (Bug #869 (Closed): [ HR ] Talent - Succession Planning)
Fixing Succession Plan BMS Tri Rizqiaty

02/11/2022

05:09 PM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Modul Reqruitmen Buat form dan testing Activity & Offering fernando sergio rumbayan
04:59 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
Testing Project BKT Mega Yunita
04:37 PM ROHTO 1.00 hour (Support #876 (QA Test): Mohon Tambahkan Kolom / Field Number of Children Pada Report Persaonal data)
Mohon Tambahkan Kolom / Field Number of Children Pada Report Persaonal data M Azid Wahyudi
04:35 PM BBG 0.50 hour (Project: BBG)
Case Data BBG hilang - After 20 January 2022 ikawati basri
04:34 PM ROHTO 1.00 hour (Bug #875 (New): Report Leave hanya Cuti tahunan yang tampil )
Report Leave hanya Cuti tahunan yang tampil M Azid Wahyudi
04:31 PM BBG 2.00 hours (Project: BBG)
Case Approval tidak sesuai ikawati basri
04:28 PM BBG 1.00 hour (Project: BBG)
Support View Report Payslip Tidak Bisa, Case Overtime & Loan ikawati basri
04:26 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #874 (Closed): [ HR ] - Training History)
ericsson ericsson
04:24 PM CNAF 2.00 hours (Bug #872 (Closed): Create Query untuk mengekuarkan Data Cuti Sakit)
Request Support Query mengeluarkan Data Cuti Sakit CNAF ikawati basri
03:53 PM CNAF 1.00 hour (Bug #872 (Closed): Create Query untuk mengekuarkan Data Cuti Sakit)
Create Query untuk mengekuarkan Data Cuti Sakit M Azid Wahyudi
04:11 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Bug #867 (Closed): Recruitment - Applicant Master Data)
Testing dan setting Applicant payroll data fernando sergio rumbayan
10:09 AM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Bug #867 (Closed): Recruitment - Applicant Master Data)
Saving & Load MD Recruitment BMS Tri Rizqiaty
10:08 AM PT BMS MIGRATION & ENHANCEMENT 1.50 hour (Bug #867 (Closed): Recruitment - Applicant Master Data)
Saving & Load MD Recruitment BMS Tri Rizqiaty
04:10 PM BBG 2.00 hours (Project: BBG)
Case Payroll Hilang Datanya & Payroll contro januari tidak bisa Finish ikawati basri
04:07 PM CLIENT SUPPORT 3.00 hours (Project: CLIENT SUPPORT)
Create Tutorial ke Share Doc CS Minova ikawati basri
04:06 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
Testing dan memperbaiki settingan Time Management dan HR Administration project BKT Mega Yunita
04:05 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
Memperbaiki settingan setelah UAT Bank Kalteng Mega Yunita
04:03 PM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Phase 2 - Setting Parameter HR Travel and Training ericsson ericsson
04:01 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Phase 2 - QA Test Redmine ericsson ericsson

02/10/2022

05:56 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Phase 2 Testing dan setting fernando sergio rumbayan
04:58 PM Minova Corp Affairs 4.00 hours (Project: Minova Corp Affairs)
Miss Yana
04:35 PM BANK FAMA 1.00 hour (Bug #870 (Closed): Report Assigment Tidak menampilkan data)
Report Assigment Tidak menampilkan data M Azid Wahyudi
03:57 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Phase 2 - Setting Parameter Total cost - Mapping with total cost BWS ericsson ericsson
03:56 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Bug #869 (Closed): [ HR ] Talent - Succession Planning)
ericsson ericsson
03:56 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Bug #868 (Closed): [ HR ] Talent - Career Planing)
ericsson ericsson
03:43 PM PT ARITA 2.00 hours (Bug #844 (QA Test): Late report tidak update)
Late report tidak update M Azid Wahyudi
03:08 PM BANK KALTENG 1.00 hour (Project: BANK KALTENG)
Memperbaiki settingan BKT Mega Yunita
03:07 PM BANK KALTENG 1.00 hour (Project: BANK KALTENG)
Memperbaiki settingan BKT Mega Yunita
03:07 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
Memperbaiki settingan setelah UAT Bank Kalteng Mega Yunita
02:38 PM BANK KALTENG 1.00 hour (Feature #727 (Closed): Time Management - Late)
Time Management - Late M Azid Wahyudi
02:29 PM TUGU PRATAMA INDONESIA (TPI) 4.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
Mapping Data Execel Training 2021 (Public Dalam Negri Traning ) fernando sergio rumbayan
12:03 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #863 (Closed): Modul Recruitment - Tidak Nampil Lookup)
Testing dan setting fernando sergio rumbayan
11:54 AM CLIENT SUPPORT 1.00 hour (Project: CLIENT SUPPORT)
Create Tutorial ke Share Doc CS Minova ikawati basri
11:06 AM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
Finance - Update Biaya Masih Harus Dibayar Periode Jan 2022 Maulina Hali
11:02 AM IMFI Bugs 2.00 hours (Project: IMFI Bugs)
QA hasil Perbaikan Case Selisih Tunjangan Jabatan terhadap Perhitungan Pajak ikawati basri
09:32 AM PERTALIFE Bugs 1.00 hour (Project: PERTALIFE Bugs)
Support Pak Yahmin Absensi Tidak ada notofikasi email dian perdana putra

02/09/2022

06:01 PM TUGU PRATAMA INDONESIA (TPI) 3.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
Deploy Minova ES Kordinasi dengan Pak Mulyadi dian perdana putra
06:00 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Phase 2 Development testing & setting fernando sergio rumbayan
05:57 PM LPPOM HALAL 0.50 hour (Project: LPPOM HALAL)
Create User Manual Case ESS Leave – DS1 sudah Approve, namun di Flow report masih Status Waiting di DS1 ikawati basri
05:40 PM Minova Corp Affairs 7.00 hours (Project: Minova Corp Affairs)
Finance - Rekap Jurnal All Bangking (Closing Januari 2022) Maulina Hali
05:37 PM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
Finance - Hitungan Termin dan Revisi Invoice PT Perta Life Insurance Maulina Hali
05:31 PM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
Testing dan Setting Parameter BKT Mega Yunita
05:22 PM CLIENT SUPPORT 0.50 hour (Project: CLIENT SUPPORT)
Create Tutorial User untuk Case Report Attendance Tidak Keluar untuk Semua Employee ikawati basri
04:41 PM HINO 1.50 hour (Project: HINO)
Support Create Tutorial Setting Family - Benefit Medical ikawati basri
04:30 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Phase 2 - Development ericsson ericsson
04:18 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Bug #863 (Closed): Modul Recruitment - Tidak Nampil Lookup)
Fixing Look Up MD App BMS Tri Rizqiaty
03:47 PM LPPOM HALAL bugs 1.00 hour (Bug #864 (Closed): [Time Management] - Data Kehadiran Employee tidak Keluar Semua Saat Penarikan Report Attendance)
Checking Case Report Attendance tidak keluar untuk semua employee ikawati basri
03:08 PM LPPOM HALAL bugs 1.00 hour (Bug #864 (Closed): [Time Management] - Data Kehadiran Employee tidak Keluar Semua Saat Penarikan Report Attendance)
[Time Management] - Data Kehadiran Employee tidak Keluar Semua Saat Penarikan Report Attendance M Azid Wahyudi
03:10 PM TUGU PRATAMA INDONESIA (TPI) 5.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
Mapping Data Execel Training 2021 (Inhose Traning Sequance) fernando sergio rumbayan
02:50 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #857 (Closed): Report Payroll BPJS )
Testing dan setting fernando sergio rumbayan
10:07 AM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Feature #857 (Closed): Report Payroll BPJS )
Report Payroll BPJS M Azid Wahyudi
02:11 PM CLIENT SUPPORT 1.50 hour (Project: CLIENT SUPPORT)
Buat User Manual ke share folder Client Support ikawati basri
02:11 PM RSM 2.00 hours (Project: RSM)
Support Tim RSM APP Web RSM Lemot saat di akses ( Web App ada di server Clud Minova 66 ) dian perdana putra
02:08 PM HINO 1.50 hour (Project: HINO)
Unlock User karena User Expired ikawati basri
02:03 PM BANK FAMA 2.50 hours (Project: BANK FAMA)
Support Bu Ilvia Buat kan User Manual User Management dian perdana putra
02:00 PM IMFI 0.50 hour (Project: IMFI)
Support Mas Fajar Reset Pasword hr5 dian perdana putra
01:58 PM IMFI 0.50 hour (Project: IMFI)
Support Mbak Jenny Reset Pasword Rec7 dian perdana putra
01:58 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
Testing PMS BKT Mega Yunita
01:58 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Phase 2 - Making Form ESS Travel - Cost And Total Cost ericsson ericsson
01:58 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
Setting Parameter Bank Kalteng Mega Yunita
01:57 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
Phase 2 - Making Form ESS Travel Accomodation ericsson ericsson
01:57 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
Phase 2 - Making Form ESS Travel Route ericsson ericsson
01:56 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
Making Form ESS Travel - Header ericsson ericsson
01:53 PM IMFI 2.00 hours (Project: IMFI)
Support Fajar Payslip Pada ESS Blank tidak ada data Account Minova hr5 dian perdana putra
01:52 PM PT BMS MIGRATION & ENHANCEMENT 7.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS PA & MEDICAL fernando sergio rumbayan
01:02 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Follow Up Note BMS fernando sergio rumbayan
01:00 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
UAT BMS fernando sergio rumbayan
01:00 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
UAT BMS fernando sergio rumbayan
12:59 PM PT BMS MIGRATION & ENHANCEMENT 8.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
visit BMS fernando sergio rumbayan
11:35 AM Asuransi Bintang - Existing 3.50 hours (Project: Asuransi Bintang - Existing)
Create Function Get Org Tree For Report Position Tri Rizqiaty
11:33 AM IMFI Bugs 8.00 hours (Bug #740 (Revise): [HR-PAYROLL] Perbaikan Report E-Spt untuk skenario Pindah Payroll Grup & KPP)
Fixing ESPT IMFI Tri Rizqiaty
11:32 AM IMFI Bugs 1.50 hour (Bug #740 (Revise): [HR-PAYROLL] Perbaikan Report E-Spt untuk skenario Pindah Payroll Grup & KPP)
Fixing Report ESPT IMFI Tri Rizqiaty
11:10 AM Bank Mega Syariah Existing 1.00 hour (Project: Bank Mega Syariah Existing)
Meeting Diskusi terkait perubahan Data untuk upload data PMS ikawati basri
11:08 AM HINO Bugs 1.00 hour (Project: HINO Bugs)
Testing unlock User Minova via Aplikasi ikawati basri
10:16 AM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
Finance - Finalisasi Meal Allowance dan Tunjangan Periode Jan 2022 Maulina Hali
10:14 AM Minova ERP Internal 3.00 hours (Project: Minova ERP Internal)
Input Jurnal Petty Cash Ops ke Aplikasi MinovaES ERP Internal Maulina Hali
10:13 AM Minova Corp Affairs 2.00 hours (Project: Minova Corp Affairs)
Finance - Petty Cash Ops Periode Jan 2022 Maulina Hali
10:12 AM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
Finance - Follow up AR Maulina Hali
10:10 AM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
HR - Ovt Grade A Maulina Hali
10:05 AM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
Finance - Update Cashplan Maulina Hali
10:04 AM Minova Corp Affairs 1.00 hour (Project: Minova Corp Affairs)
Finance - Invoice dan Faktur Pajak Maulina Hali
09:36 AM BANK KALTENG 4.00 hours (Project: BANK KALTENG)
Testing dan Input data PMS BKT Mega Yunita
09:34 AM Bank Mega Syariah Existing 8.00 hours (Project: Bank Mega Syariah Existing)
Support Data Setting & Testing ke Database - PMS ikawati basri

02/08/2022

06:11 PM PT BMS MIGRATION & ENHANCEMENT 3.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Testing dan setting Recruitment fernando sergio rumbayan
04:28 PM BBG 0.50 hour (Project: BBG)
Cek data backup dian perdana putra
04:25 PM HINO 2.00 hours (Project: HINO)
Support Mas Defri Pyaroll Basic Data upload data dan Guide dian perdana putra
04:22 PM IMFI Bugs 5.00 hours (Bug #740 (Revise): [HR-PAYROLL] Perbaikan Report E-Spt untuk skenario Pindah Payroll Grup & KPP)
Debug Payroll Pindah Paygroup IMFI Tri Rizqiaty
09:40 AM IMFI Bugs 2.00 hours (Bug #740 (Revise): [HR-PAYROLL] Perbaikan Report E-Spt untuk skenario Pindah Payroll Grup & KPP)
Diskusi perbaikan payroll engine & reporting eSPT IMFI terkait Selisih Tunjangan Jabatan ikawati basri
04:22 PM BANK FAMA 3.00 hours (Project: BANK FAMA)
Buat WageType DPLK TOP UP dian perdana putra
04:20 PM IMFI 2.50 hours (Project: IMFI)
Buat Template upload Personal Data buat mas Fajar dian perdana putra
04:17 PM RSM 0.50 hour (Project: RSM)
Cek Generate Cuti Otomatis RSM ( Job SQL ) dian perdana putra
04:13 PM ROHTO 2.00 hours (Project: ROHTO)
Meeting Dengan Team Rohto bahas case dian perdana putra
04:12 PM BBG 4.00 hours (Project: BBG)
Restore Database koodinasi dengan pak firman dian perdana putra
03:14 PM TUGU PRATAMA INDONESIA (TPI) 5.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
Mapping Data Execel Training 2021 (Inhose Traning) fernando sergio rumbayan
03:01 PM BANK KALTENG 3.00 hours (Project: BANK KALTENG)
Testing UI Baru BBG Mega Yunita
02:59 PM BANK KALTENG 1.00 hour (Project: BANK KALTENG)
Membuat User Manual BKT Mega Yunita
02:42 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Phase 2 - Making Form ESS Overtime ericsson ericsson
02:42 PM PT BMS MIGRATION & ENHANCEMENT 2.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
Phase 2 - Making Form ESS Leave ericsson ericsson
02:41 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
Phase 2 - Making Form ESS Exit Clearance ericsson ericsson
02:41 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
Phase 2 - Making Form ESS Staff Requisition ericsson ericsson
02:40 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
Phase 2 - Making Form ESS Mutation ericsson ericsson
02:40 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
Phase 2 - Making Form ESS Promotion ericsson ericsson
02:38 PM PT BMS MIGRATION & ENHANCEMENT 6.00 hours (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS Phase 2 ericsson ericsson
02:38 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Project: PT BMS MIGRATION & ENHANCEMENT)
BMS Phase 2 - Statistic ericsson ericsson
02:37 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #856 (Rejected): [ BI ] - Report Generator)
Setting and Checking Report Generator Module ericsson ericsson
09:57 AM TUGU PRATAMA INDONESIA (TPI) 7.00 hours (Project: TUGU PRATAMA INDONESIA (TPI))
Mapping data Training 2021 fernando sergio rumbayan
09:46 AM Bank Mega Syariah Existing 2.00 hours (Project: Bank Mega Syariah Existing)
Support Data Correction & Diskusi terkait PMS Final BMS 2021 ikawati basri
09:43 AM LPPOM HALAL 1.00 hour (Project: LPPOM HALAL)
Support Case Selisih BPJS Kesehatan ikawati basri

02/07/2022

05:53 PM Asuransi Bintang - Existing 4.00 hours (Feature #849 (Developing): Pembuatan Report Rekap Competency, Rekap Job Aktif & Talent Match Up)
Report competency , rekap job aktif & talent match up M Azid Wahyudi
05:49 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
Membuat User Manual BKT Mega Yunita
05:48 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
Membuat User Manual BKT Mega Yunita
02:47 PM PT BMS MIGRATION & ENHANCEMENT 1.00 hour (Bug #839 (Closed): Report Payroll BPJS Tidak keluar)
Testing dan setting fernando sergio rumbayan
10:42 AM PT BMS MIGRATION & ENHANCEMENT 1.20 hour (Bug #839 (Closed): Report Payroll BPJS Tidak keluar)
Report Payroll BPJS Tidak keluar M Azid Wahyudi
02:44 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
Input data dan testing request PMS BKT Mega Yunita
02:43 PM BANK KALTENG 2.00 hours (Project: BANK KALTENG)
Setting dan memperbarui Wage Type BKT Mega Yunita
02:08 PM PT ARITA 2.30 hours (Feature #851 (QA Test): Attendance Recap ditambah pengurang istirahat 1 jam dan kop report)
Attendance Recap ditambah pengurang istirahat 1 jam dan kop report M Azid Wahyudi
12:20 PM IMFI 0.50 hour (Project: IMFI)
Support Mas Fajar Unlock & Reset user rec7 dian perdana putra
12:17 PM HINO 6.00 hours (Project: HINO)
Support Mas Defri Cek data Assingment dan Pyaroll Basic Data dian perdana putra
10:59 AM PT ARITA 2.00 hours (Bug #853 (Closed): Generate Absence Quota Bugs)
Fixing Generate Quota By Hiring Date Arita Tri Rizqiaty
10:34 AM BANK MEGA SYARIAH - ES 0.50 hour (Project: BANK MEGA SYARIAH - ES)
QA Benefit Management - Medical ikawati basri
10:21 AM Bank Mega Syariah Existing 1.00 hour (Project: Bank Mega Syariah Existing)
Meeting dengan User Terkait PMS ikawati basri
10:19 AM Bank Mega Syariah Existing 2.50 hours (Project: Bank Mega Syariah Existing)
Support Setting Data for Performance Management BMS ikawati basri
10:07 AM PERTALIFE Bugs 3.00 hours (Bug #848 (Assigned): Performance Appraisal)
Checking Grid Autoload KPI Tri Rizqiaty
10:04 AM CLIENT SUPPORT 3.00 hours (Project: CLIENT SUPPORT)
Update Client Support User Manual ikawati basri
09:59 AM Asuransi Bintang - Existing 0.50 hour (Project: Asuransi Bintang - Existing)
Case Training ikawati basri
 

Also available in: Atom